Skip to main content
Skip to content
Case File
efta-02018359DOJ Data Set 10Other

EFTA02018359

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02018359
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: jeevacationtisgmail.com[[email protected]]; [email protected][[email protected]] From: Lvjet Sent: Thur 3/15/2012 10:53:57 PM Subject: Gil / B727 Jeffrey, The Boeing is completed and aux tank operational,. Gil update Need to install Rudder, both elevators and rig flight contols tomorrow, engine runs on saturday, once controls are rigged and installed,. Saturday and Sunday would be overtime, and still don't think it will be ready for flight, there is always something that will not ops check good,. personally think Monday is real, aircraft will need full cleaning exterior, interior and stainless steel bright work needs to be polished, which will take a full day, we could pass on this, but should be accomplished,. thx, larry EFTA_R1_00522300 EFTA02018359

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainjeevacationtisgmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.