Case File
efta-02022000DOJ Data Set 10OtherEFTA02022000
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02022000
Pages
2
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
v
tion
mail.conteevacation©gmail.com]; Je vacation[[email protected]]
From:
Sent
: 3:13 AM
Subject Re: Gil update
High altitude start could only be verified by an Albuquerque stop, We can't simulate high altitude,
if the apu sounded smooth during start, I'd say it was fixed, but I'm just not comfortable with the
sound during acceleration,
gulfstream is recommending surge valve replacement,. At this point I'm installing parts that we
can't verify are faulty, the surge valve is $7,900
Gulfstrcam is not able to locate the test box for Tstat calibration,. All I have heard today is, this
plane is old, it was called a classic by one Mechanic, and they rarely see GII's at there shop. I'm
glad we are not doing inspection here.
Let's see if they can find a fault with surge valve, I really need Dallas Airmotivc to assist more in
trouble shooting, of course, dallas airmotive told us speed switch, then tstat, all that appears left is
surge valve,. Frustrating, sorry
I'm still at plane now, I'll let you know further finding tonight,
Thx
Larry
Ps; Flight Safety here in Long Beach has just retired their GII sims as did Simuflite, no more exist.
Only GIII's
Sent via BlackBerry by AT&T
From: jeffrey epstein [email protected]>
Date: Thu 3 Mar 2011 20:07:18 -0800
To:
Subject: Re: GII update
What about altitude
Sorry for all the typos .Sent from my iPhonc
On Mar 3, 2011, at 7:59 PM,
wrote:
Jeffrey,
Tstat is installed and working, APU is not as smooth as I thought it would sound when
accelerating from 80% to 100%, the part we installed is 41 years old, so that could be an
issue,.We are doing functional checks of the APU Surge Valve, which is the last part of the
air system involved in starting. Surge valve will arrive tomorrow from Savannah at 10:30am is
what I'm being told, just in case we elect to install it,.
I'm fine with APU operation at this point, so we can depart if you like any time tomorrow,.
I will know more around midnight tonight if a problem with surge valve is found„ only takes 1.5
hours to install,. I did not want to delay your departure,.) can always install when we do the
below floor inspection,.if there is an issue found with surge valve,.
The technicians at Long Beach are marginal as far as Gil knowledge, they are folowing the
Tech supports recommendations,.only one guy is approved to run APU, all others are GIV and
up specialist,.
EFTA_R1_00528028
EFTA02022000
Boost pump operation normal.,
changed boost pump Relay for UH side, and two pressure switches,.
I will update you if any findings on surge valve,.let me know if there is a departure time yet?
thank you,
Larry
EFTA_R1_00528029
EFTA02022001
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Email
[email protected]Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.