Skip to main content
Skip to content
Case File
efta-02032548DOJ Data Set 10Other

EFTA02032548

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02032548
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: jeevacation©gmail.com[jeevacation©gmail.com]; Jeffrey Epsteinbeevacation©gmail.com] From: Craig Martin Sent Fri 5/11/2012 12:38:31 AM Subject: Re: Pricing on Engineering Building Pad I sent you bills at 2:02 PM Can resend if you want Will send Brian's and John's now criag From: Jeffrey Epstein <[email protected]> To: Craig Martin Sent: Thursday, May 10, 2012 6:44 PM Subject: Re: Pricing on Engineering Building Pad Im sorry„ did i get an answer to what bill brian and john have been doing. On Thu, May 10, 2012 at 5:45 PM, Craig Martin wrote: We had discussed trying to get the building permitted. In the future if you want to erect the building we would need a stamped pad plan by govt. We can skip that if you want. Tom had said there are drafting services in STT that could draw a simple plan. The labor figure is using Tom's construction crew, plus a few more workers that they need on the days they pour cement. I will get Tom to give a breakdown. Craig From: Jeffrey Epstein <jeeyacation@qmail com> To: Craig Martin Cc: Richard Kahn Sent: Thursday, May 10, 2012 4:06 PM Subject: Re: Pricing on Engineering Building Pad what does site drawings mean . who is doing. this makes no sense, who is doing earthwork and for how long. i want now to see details , rich follow up On Thu, May 10, 2012 at 3:55 PM, Craig Martin wrote: Here is the quote on the engineering building pad. This is for the pad only. Please see exceptions below. This pad is designed to hold a future building. Bolts for building, minor drainage is included. EFTA_R1_00543287 EFTA02032548 If only a pad is needed without provisions for a building the price could be reduced slightly. Craig New Engineering Building Pad Material Outside Vendor Temp 200 Enclosure/safety Material Handling Labor Shipping Trucking Tax 200 600 Equipment Rental 1500 Misc Expenses 1000 1000 Layout/Survcy 200 800 Earthwork and Demo 2500 2000 Site Drawings 1000 Pest Control 2800 Site Dranage 1000 1000 Pipes/Utilities 500 2000 Concrete 9350 8000 2500 Vapor Barrier 200 200 Ties/Accessories/bolts 1500 1000 Rebar 2400 1200 Saw Cutting 250 400 Curing/Protection 300 400 Fine Grade 1000 Wood/Formwork 1200 1400 Fastners 400 Sub Totals 18500 4300 22700 4500 Total 50000 Note; This is a basic pad No Utilities, septic sysyem, electrical, wall, or engineering yard work The pad will have 3 gray water drains. The pad will not have sanitary drains Includes min work on electrical vault EFTA_R1_00543288 EFTA02032549 *********************************************************** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to joevacationagmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00543289 EFTA02032550 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00543290 EFTA02032551

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainjoevacationagmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.