Case File
efta-02110383DOJ Data Set 10OtherEFTA02110383
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02110383
Pages
29
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
richardkahnl2
mail.com
rom:
Lvjet
Sent:
Mon 3/24/2014 8:37:12 PM
Subject: Fwd: updates
I ment to include you both on this email to Jeffrey, It appears he was not please or surprised when I informed
him of the 24 month inspection that is due in 90 days June 30th, so I sent Jeffrey the DUE list that I review
every week, (sometimes).
-
-also, JE wanted to depart ST THOMAS at midnight April 4th to arrive in Phoenix to clear customs,. flight time
is 7+10min,. that would have us land in PHX at 5am,.. however, Customs is open only, 830am to 4:30pm for
hours of operation.
"' JE wants a small plane charter for March 31st, St Martaan to St Thomas, maybe they are arriving on airlines
from EU?
SEE update to JE below,
thx
Larry
---Original Messa e----
From: Lvjet
>
To: jeevacation
Sent: Mon, Mar 24, 2014 4:28 pm
Subject: Re: updates
Jeffrey,
PHX Customs flight OK,. April 4th ?
Customs is not enforcing Overflight, as long as operator has obtained Overflight in the past. (as we have), we
are allowed to fly into any AOE (Airport of Entry). with prior approval.
Phoenix Customs hours of operation Monday - Friday 8:30am - 4:30pm only, no overtime according to officer
on duty.
Phoenix will approve overflight after they review passengers listed on EAPIS for this flight on April 4th and we
must land between the hours of 8:30am and 4:30pm Monday - Friday.
OUTFLOW Valve:
Gulfstream Tech ops has to locate in their archives the original drawings for our GIV serial number, 1085,
this has been our delay in getting an answer and or approval, whether Gulfstream will use other installation
drawings or fabricate New ones for procedure to install new louvers,.
I have contacted Rusty Crammer our DU885 Sales Rep, to assist with pushing Gulfstream to give an answer
regarding installing other style outflow valve louvers,
CHARTER St. Martaan to St Thomas March 31st, 2014
St Thomas Jet Center Charter has Twin Engine Piper Navajo Panther, (similar to our past Cessna 421).
price St. Martaan to St Thomas $1,920.00 all fees and Handling included.
GIV Due list below with dates,.
Below is my due list for Gulfstream IV that will take me thru November 2014,. calendar items and inspections
are sometimes hidden in these reports,. many items are complied with during routine Mx visits to Teterboro and
Islip to keep the GIV operating as smooth as possible. In the future I will give a minimum of 12 month waming of
impending inspections that will come due, so we can address Mx scheduing properly,
Aircraft Due List: Ordered by next due based on
utilization
Select a compliance (unction:
Click Here to Select Function
GoTo: ATA Code Management
GoTo: LogBook/MTR Entry for Checked Items
GoTo: Maintenance Due List
EFTA_R1_00730426
EFTA02110383
RPT: Airframe Times Due List (ATA Code w Ref)
RPT: Airframe Times Due List (ATA Code)
RPT: Airframe Times Due List (Due Date w Ref)
RPT: Airframe Times Due List (Due Date)
RPT: Airframe Times Due List By Group (ATA Code)
RPT: Airframe Times Due List By Group (Due Date)
RPT: Component Transaction (Part Rem) for Checked
RPT: Current Status of Checked Items
RPT: Due List (ABS)
RPT: Due List with Projected Due Date (ATA Code)
RPT: Due List with Projected Due Date (Due Date)
RPT: Excel Output for Checked Items
RPT: Maint Quote Related (Excel) for Checked
RPT: Maint Quote Related for Checked
RPT: Maintenance Due List (ATA Code)
RPT: Maintenance Due List (Due Date)
RPT: Maintenance Due List (STD)
RPT: Maintenance Due List By Hrs/Cyc/Date (STD)
RPT: Maintenance Quote (Excel) for Checked Items
RPT: Maintenance Quote (STD) for Checked Items
RPT: Mechanic Signet (ABS) for Checked Items
RPT: Mechanic Signoff (STD) for Checked Items
RPT: Mechanic Signoff With Related for Checked
RPT: Parent Child Signori for Checked Items
RPT: Status Summary (STD) Of Checked Items
RPT: Task Card Package for Checked Items
Updating Due and Remains Information ... Please Wait
Retrieving data ... Please Wait
Includes recurring and mandatory service information that have not been accomplished
All related codes due within the projection are included
Projected Through Hours:8802.5 Landings:4057 Date:28 Nov 2014
Select All Checkboxes I De.select All Chockboxos
Delta
ATA Code
Logbook
Description
Compliance Interval
353012 (P)
Airframe
Oxygen Bottle, #2 Portable - Removal / Installation
180
P/N: 176965S-M-B-3 SIN: 672761
Due: End
Of Month
Custom
Frequency
N 262562 (P)
Airframe
Portable H2O Fire Extinguisher (Aft Cabin) -
60 LI:
Hydrostatic Test
Due: End
Of Month
15K 262631 (P)
Airframe
Portable Halon Fire Extinguisher (Right Cockpit) -
1 MC
Inspection
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730427
EFTA02110384
E 262632 (P)
Airframe
Portable HaIon Fire Extinguisher (Forward Cabin) -
Inspection
N 262633 (P)
Airframe
Portable Halon Fire Extinguisher (Aft Cabin) -
Inspection
N 320004
Airframe
Main Landing Gear (Left) - Lubrication
N 320005
Airframe
Main Landing Gear (Right) - Lubrication
320006 (P)
Airframe
Nose Gear - Lubrication
1 MO
1 MO
NNW
4 MO
4 MO
4 MO
Tolerance
+15 DAY
Due: End
Of Month
N 240178
Airframe
Battery #3. Emergency Service
6 ':!OS
Custom
Frequency
N 243105 (P)
Airframe
Battery. #1--Capacity Check
6 ',I OS
PIN: RG-380E-44
SIN: 40336977
Tolerance
+1/-1 MOS
Custom
Frequency
EFTA_R1_00730428
EFTA02110385
2 MOS
243106 (P)
Airframe
Battery. #2--Capacity Check
PIN: RG-380E-44
SIN: 40494892
'.105
Tolerance
+1/-1 MOS
Custom
Frequency
12 MOS
: 346019
Airframe
FMS No. 1 NDB - Update
28 DA
Tolerance
-8 DAY
346020
Airframe
FMS No. 2 NDB - Update
28 DP
Tolerance
-8 DAY
346021
Airframe
FMS No. 3 NOB - Update
28 DP
Tolerance
-8 DAY
Vi 254001 (P)
Airframe
Lavatory Compartment Above Floor - Inspection
1000 I-
N 994002 (P)
Airframe
AD74-08-09 R3 Lavatory Paper and Linen Waste
1000 I-
Receptacle Enclosure Access Door and Disposal
Door Inspection
IX 240260 (P)
Airframe
Emergency Securaplane Battery I Heater Assembly
48 MI
No. 1 - Replacement
Da0:,
P/N: 160.0201-02
S/N: 1410
COS*
304003
Airframe
Windshield Wiper Lock Pin - Lubrication /
6 MO
Adjustment
+is pAyi
Due_ Wit
EFTA_R1_00730429
EFTA02110386
Of Month
H 323112 (P)
Airframe
Landing Gear Emergency Air Bottle - Hydrostatic
36 M:
Test
Due: End
P/N: 1159SCH233-5 SIN: 12398C1
Of Month
E 381010
Airframe
Filter Element, No. 1 Potable Water System -
Removal / Installation
P/N: 778000 SIN:
381025 (P)
Airframe
Potable Water System - Flush I Sanitize
E 539516 (P)
Airframe
Antenna Interface - Inspection
El 314007
Airframe
FWC No. 1 Trend and Limit Monitoring - Data
Download
314008
Airframe
FWC No. 2 Trend and Limit Monitoring - Data
Download
MI 340100
Airframe
Reduced Vertical Separation Minimum (RVSM)
Monitoring Policy
6 MOS
111
6 MOS
72 MC
Tolerance
+15 DAY
Due: End
Of Month
Custom
Frequency
90 DAY
Custom
Freque
1000 HRS 12
6 MOS Initia
EFTA_R1_00730430
EFTA02110387
IX 262622 (P)
Airframe
Portable Halon Fire Extinguisher (Forward Cabin) - 12 MOS
Weight Check
+15 DAY
Due: End
Of Month
X 262623 (P)
Airframe
Portable Halon Fire Extinguisher (Aft Cabin) -
12 MC
Weight Check
521080 (P)
Airframe
Inflatable Door Seal - Purging Procedure
N 710019 (P)
Engine 1
Powerplant Internal - Inspection
El 710019 (710020) (P)
Engine 2
Powerplant Internal - Inspection
Tolerance
+15 DAY
Due: End
Of Month
Tolerance
+15 DAY
Due: End
Of Month
Tolerance
+15 DAY
Due: End
Of Month
Tolerance
+15 DAY
Due: End
Of Month
fil 100310•
Airframe
CK AIRWORTHY DIRECTIVES
3 MC
P/N: ? SIN:
Due: End
Of Month
X 100320'
Airframe
CK SERVICE BULLETINS
P/N: 9
S/N:
Due: End
Of Month
EFTA_R1_00730431
EFTA02110388
212077 (P)
Airframe
Air Conditioning Shut-off Valve Filter (Left) -
24 MC
Inspection
Tolerance
+15 DAY
Due: End
Of Month
212078(P)
Airframe
Air Conditioning Shut-off Valve Filter (Right) -
24 MC
Inspection
Tolerance
+15 DAY
Due: End
Of Month
212115
Airframe
Nose Compartment Cooling System - Operational
24 MC
Test
Tolerance
+15 DAY
Due: End
Of Month
-:213053
Airframe
Cabin Pressure Warning Indication System -
24 MC
Functional Test
Tolerance
+15 DAY
Due: End
Of Month
/ 213081 (P)
Airframe
Pressurization Safety Valve - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
X 213090
Airframe
Cabin Pressure Controller (Manual Mode) -
24 (.1C
Operational Test
Tolerance
+15 DAY
Due: End
Of Month
: : 216097 (P)
Airframe
Air Cycle Machine Compressor Outlet Overheat
24 MC
Switch (Left) - Trip Point Check
Tolerance
+15 DAY
EFTA_R1_00730432
EFTA02110389
Due: End
Of Month
" 216098 (P)
Airframe
Air Cycle Machine Compressor Outlet Overheat
24 MC
Switch (Right) - Trip Point Check
Tolerance
+15 DAY
Due: End
Of Month
".. 236010 (P)
Airframe
Static Discharger Wick (Left Wing) - Resistance
24 MC
Check
Tolerance
+15 DAY
Due: End
Of Month
236011 (P)
Airframe
Static Discharger Wick (Right Wing) - Resistance
21 MC
Check
Tolerance
+15 DAY
Due: End
Of Month
236014 (P)
Airframe
Static Discharger Wick (Left Horizontal Stabilizer) -
21 MC
Resistance Check
Tolerance
+15 DAY
Due: End
Of Month
236015 (P)
Airframe
Static Discharger Wick (Right Horizontal Stabilizer) -
24 MC
Resistance Check
Tolerance
+15 DAY
Due: End
Of Month
:•: 237041 (P)
Airframe
CVR Underwater Locator Beacon (DK100 / DK120) -
Operational Test
Tolerance
P/N: OK120
SIN:
+15 DAY
Due: End
Of Month
EFTA_R1_00730433
EFTA02110390
M 237047 (P)
Airframe
CVR Underwater Locator Beacon - Battery Voltage
Check (DK100 DK120)
P/N: DK120 S/N:
24 MI
X 251125
Airframe
Pilot / Copilot Inertia Reel - Operational Test
24 MC
Tolerance),
+15 DAY
Due: End
Of Month.
N 261035 (P)
Airframe
Engine Alternator Overheat Switch (Left) - Trip
24 MC
Point Check
Tolerant&
+15 DAY
Due: End
Of Month
261036(P)
Airframe
Engine Alternator Overheat Switch (Right) - Trip
Point Check
Tolerance
+15 DAY
Due: End
Of Month
N 261065 (P)
Airframe
Combined Hydraulic System Overheat Switch -
Trip Point Check
Tolerance
+15 DAY
Due: End
Of Month
r<:261066 (P)
Airframe
Flight Hydraulic System Overheat Switch - Trip
24 niC
Point Check
Tolerance
+15 DAY
Due: End
Of Monti
V 261235 (P)
Airframe
Bleed Air Manifold Overheat Switch (Left) - Trip
24 MC
Point Check
EFTA_R1_00730434
EFTA02110391
Due: End
Of Month
261236 (P)
Airframe
Bleed Air Manifold Overheat Switch (Right) - Trip
Point Check
Tolerance
+15 DAY
Due: End
Of Month
261440 (P)
Airframe
APU Overheat Switch - Trip Point Check
El 262075 (P)
Airframe
Fire Bottle (APU) - Weight Check
IX 262155
Airframe
Fire Pull Handle - Operational Test
Tolerance
+15 DAY
Due: End
Of Month
24 MC
24 MC
Tolerance'
+15 DAY
Due: End
Of Month
Ns: 262165 (P)
Airframe
Fire Extinguisher System (Left) - Functional Test
24 MC
Tolerance
+15 DAY
Due: End
Of Month
IX 262166 (P)
Airframe
Fire Extinguisher System (Right) - Functional Test
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730435
EFTA02110392
262170
Airframe
Fire Extinguisher System (APU) - Functional Test
303006
Airframe
Standby Pitot Heat System - Operational Test
303009
Airframe
Total Temperature Probe Heat System -
Operational Test
r7. 303012
Airframe
Angle of Attack Heat - Operational Test
*15DINti
EMI
24 MC
24 MC
24 MC
24 MC
X 320010 (P)
Airframe
Landing Gear (Right Main) Corrosion Inhibiting
24 MC
Compound Reapplication
431 320034 (P)
Airframe
Nose Landing Gear Corrosion Inhibiting Compound
24 MC
Reapplication
Oven
Due: End
Of Month
EFTA_R1_00730436
EFTA02110393
V 321041
Airframe
Main Gear Shock Absorber (Left) - Service
V 321042
Airframe
Main Gear Shock Absorber (Right) - Service
M 322006 (P)
Airframe
Nose Gear Shock Strut - Friction Check
322028
Airframe
Nose Gear Shock Strut - Service
N 323025 (P)
Airframe
Main Gear Side Brace Fitting Pin (Left) - Inspection
".: 323026 (P)
Airframe
Main Gear Side Brace Fitting Pin (Right) -
Inspection
24 MC
24 MC
24 MC
24 MC
+15 DAY
Due: End
Of Month
24 MC
121212110
+15 DAY
Due: End
Of Month
24 MC
Tolerance
+15 DAY
Due: End
Of Month
'i. 362005
Airframe
Bleed Air Manifold Pressure Indication - Functional
24 MC
Test
Tolerance
+15 DAY
EFTA_R1_00730437
EFTA02110394
Due: End
Of Month
510070
Airframe
24 Month Honeycomb (Aluminum Panels Only) -
Inspection / Bond Test
521007(P)
Tolerance
+15 DAY
Due: End
Of Month
Airframe
Main Entrance Door - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
Ig 521024 (P)
Airframe
Main Entrance Door Hinge Pins - Inspection
24 MC
IX 521051
Airframe
Door Seal Pressure Regulator - Functional Test
24 MC
rdl 532017 (P)
El 532019 (P)
Airframe
Cockpit Compartment Above Floor - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
Airframe
Cockpit Compartment Below Floor - Inspection
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730438
EFTA02110395
M. 532021 (P)
Airframe
Cockpit Compartment Below Pedestal - Inspection
24 MC
103091
+15 DAY
Due: End
Of Month
532027
Airframe
Entrance Compartment Behind Panel - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
532029
Airframe
Entrance Compartment Above Floor - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
. 532031 (P)
Airframe
Entrance Compartment Below Floor - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
532033 (P)
Airframe
Entrance Compartment Shelf - Inspection
Tolerance
+15 DAY
Due: End
Of Month
181532041 (P)
Airframe
Baggage Compartment Above Floor - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
I 532045
Airframe
Baggage Compartment Behind Panel - Inspection
EFTA_R1_00730439
EFTA02110396
Due: End
Of Month
'
532050
Airframe
Engine / APU Fuel Feed Line - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
532052 (P)
Airframe
Torque Box - Inspection
Tolerance
+15 DAY
Due: End
Of Month
532055
Airframe
Fuselage Interior i Wing Attach - Inspection
Tolerance
+15 DAY
Due: End
Of Month
532070
Airframe
Shear Clips Aft Fuselage - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
3000 Hrs Init
533005
Airframe
Exterior Fuselage - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
H 535008 (P)
Airframe
Nose Compartment / Radome Interior - Inspection
24 MC
Tolerance
+15 DAY
EFTA_R1_00730440
EFTA02110397
Due: End
Of Month
535012(P)
Airframe
Tail Cone Interior - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
562005 (P)
Airframe
Emergency Window Release Mechanism (Internal
and External) - Functional Test
24 MC
Tolerance
+15 DAY
Due: End
Of Month
' 783005 (P)
Airframe
Engine Thrust Reverser (Left) - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
783006 (P)
Airframe
Engine Thrust Reverser (Right) - Inspection
24 MC
Tolerance
+15 DAY
Due: End
Of Month
236020 (P)
Airframe
Static Discharger Wick (Tail Cone) - Resistance
24 MC
Check
Tolerance
+15 DAY
Due: End
Of Month
243030 (P)
Airframe
Auxiliary TRU - Inspection / Cleaning
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730441
EFTA02110398
fill 243189
Airframe
Battery Circulating Fan - Operational Test
24 MC
Ill 262621 (P)
Airframe
Portable liaIon Fire Extinguisher (Right Cockpit) -
12 MC
Weight Check
Tolerant:4
+15 DAY:j
Due: End!
Of Month:
320009 (P)
Airframe
Landing Gear (Left Main) Corrosion Inhibiting
',IC
M323004 (P)
Compound Reapplication
Airframe
Landing Gear - Emergency - Functional Test
Tolerance
+15 DAY
Over Flight
Due: End
Of Month
Tolerance
+15 DAY
Due: End
Of Month
BI 527012
Airframe
Tail Compartment Door Waming System -
24 MC
Operational Test
Tolerance
+15 DAY
Due: End
Of Month
DA 532067 (P)
Airframe
Tail Compartment Above Floor - Inspection
24 MI
571064
Airframe
Wing to Fuselage Attachments (Left) - Ultrasonic
24 MC
and Visual Corrosion Damage Tolerance Inspection tolerance.
EFTA_R1_00730442
EFTA02110399
twit got
OfMorilh
•. 783009
Airframe
Engine Thrust Reverser (Left) - Operational Test
24 MC
Mint
05:DAYI
Z 783010
Airframe
Engine Thrust Reverser (Right) - Operational Test
24 MC
Thiatth
+15 DAVI
Due: Emil
Of Monifi
7.1 212200 (P)
Airframe
Display Unit Fan Fitter - Inspection
450 HF
Tolerance
+151-Irs
273019
Airframe
Elevator Trim Tab Actuator (Left) - Lubrication
450 - 5
Tolerance
+15 Its
273020
Airframe
Elevator Trim Tab Actuator (Right) - Lubrication
450 'h,5
S 344051 (P)
Airframe
Tolerance
+15 Ws
IRU No. 1 Blower Filter - Inspection
450 HF
PIN: 26000790-101 SIN:
EFTA_R1_00730443
EFTA02110400
+15 Hrs
Tolerance
+15 Hrs
344055 (P)
Airframe
IRU No. 3 Blower Filter - Inspection
450 HF
PIN: 26000790-101 SIN:
Tolerance
+15 His
• ' 242008 (P)
Airframe
R Engine Alternator Bearing - Discard
2500 HF
PIN: 154777-5
SIN: NSN
213083 (P)
Airframe
Pressurization Safety Valve - Ground Test
24 Mc
Tolerance
+15 DAY
Due: End
Of Month
Ir. 236016 (P)
Airframe
Static Discharger Wick (Vertical Stabilizer) -
Resistance Check
Tolerance
+15 DAY
Due: End
Of Month
270006
Airframe
Shutoff Valve. Flight Control Manual - Operational
24>u
Test
Tolerance
+15 DAY
Due: End
Of Month
1.. 276001
Airframe
Ground Spoiler System - Operational Test
24 Mc
EFTA_R1_00730444
EFTA02110401
Tolerance
+15 DAY
Due: End
Of Month
:-1276004 (P)
Airframe
Ground Spoiler Fault Detection System -
24 MC
Functional Test
Tolerance
+15 DAY
Due: End
Of Month
282038
Airframe
Fuel Pump Auto Change - Operational Test
24 MC
Tolerance
+15 DAY
Due: End
Of Month
r 282073
Airframe
APU Wing Fuel Shut-off Valve - Functional Test
24 MC
Tolerance'.
+15 DAY
Due: End
Of Month
301005
Airframe
Wing Anti-Ice (Left) - Operational Test
24 MC
Tolerance
+15 DAY
Due: End
Of Month
H 301006
Airframe
Wing Anti-Ice (Right) - Operational Test
Tolerance
+15 DAY
Due: End
Of Month
302005
Airframe
Cowl Anti-Ice (Left Engine) - Operational Test
24 fi.i1(
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730445
EFTA02110402
tg 302006
Airframe
Cowl Anti-Ice (Right Engine) - Operational Test
Ig 323001 (P)
Airframe
Landing Gear - Normal - Functional Test
M 341052
Airframe
Total Air Temperature Probe Aspirator -
Operational Test
ER 352005 (P)
Airframe
Passenger Oxygen System - Operational Test
24 Mc
24 Mc
24 MC
24 Mc
t:kiezEntli
0040ath!
527005
Airframe
Main Entrance Door Warning System - Operational
24 M(
Test
Tolerance
+15 DAY,
Due: End
Of Month
527008
Airframe
Baggage Door Warning System - Operational Test
Tolerance
+15 DAY
Due: End
Of Month
532005
Airframe
Cabin Compartment Above Floor - Inspection
24 MC
EFTA_R1_00730446
EFTA02110403
Tolerance
+15 DAY
Due: End
Of Month
1532069(P)
Airframe
Tail Compartment Below Floor - Inspection
24 M
Due: End
Of Month
541019 (P)
Airframe
Pylon Internal (Left) - Inspection
18 MC
Tolerance
+15 DAY
Due: End
Of Month
• 541020 (P)
Airframe
Pylon Internal (Right) - Inspection
18 ry1(
Tolerance
+15 DAY
Due: End
Of Month
723001
Engine 1
Intermediate Compressor Case. Engine - Inspection
Tolerance
+15 DAY
Due: End
Of Month
723001 (723002)
Engine 2
761001 (P)
Intermediate Compressor Case, Engine - Inspection
Tolerance
+15 DAY
Due: End
Of Month
Engine 1
Engine Control - Operational Test
9 ICC
9 r.',C
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730447
EFTA02110404
761001 (761002) (P)
Engine 2
Engine Control - Operational Test
Tolerance
+15 DAY
Due: End
Of Month
761005
Engine 1
Controls, Engine - Service I Lubrication
Tolerance
+15 DAY
Due: End
Of Month
:•: 761005 (761006)
Engine 2
Controls, Engine - Service / Lubrication
Tolerance
+15 DAY
Due: End
Of Month
: : 217075 (P)
Airframe
Water Separator Bag (Left) - Inspection
Tolerance
+15 Hrs
: : 217076 (P)
Airframe
Water Separator Bag (Right) - Inspection
Tolerance
+15 Hrs
X 240108
Airframe
Standby Power System - Operational Test
300 HF
Tolerance'.
+15 Firs
321057
Airframe
Main Gear Timer Valve Striker Arm (Left) -
150 HF
Inspection
Tolerance
+15 Hrs
321058
Airframe
Main Gear Timer Valve Striker Arm (Right) -
150 HF
EFTA_R1_00730448
EFTA02110405
Inspection
Tolerance
+15 Hrs
IAirframe
Pylon External / Internal (Left) - Inspection
300 HF
Tolerance
+15 Hrs
■ 541018
Airframe
Pylon External / Internal (Right) - Inspection
300 HF
■ 554007
Airframe
Rudder External - Inspection
150 HF
2000 Cvc Initi
RI 710021
Airframe
Engine External (Left) - Inspection
150 HF
I ltTi
18 710022
Airframe
Engine External (Right) - Inspection
150 HF
+15 Hrs
II 801011
Airframe
Engine Starter Oil Level (Left) - Check
300 HR
Tolerance
+15 Hrs
E 801012
Airframe
Engine Starter Oil Level (Right) - Check
300 HR
Tolerance
+15 Hrs
EFTA_R1_00730449
EFTA02110406
: : 200001' (P)
276065 (P)
H 730001
Airframe
Airframe
Engine 1
OPERATION ONE
Takeoff Alarm System - Functional Test
Fuel Contamination Check. Engine - Inspection
150 HF
150 HR
150 HF
Tolerance
+15 Hrs
730001 (730002)
Engine 2
Fuel Contamination Check. Engine - Inspection
150 Hf
Tolerance
+15 Hrs
742001
Engine 1
Engine Ignition System - Operational Check
150 HF
742001 (742002)
Engine 2
Engine Ignition System - Operational Check
150 HF
792007 (P)
792007 (792009) (P)
999005
Engine 1
Filter, Engine Pressure Oil - Cleaning / Inspection
Engine 2
Filter. Engine Pressure Oil - Cleaning / Inspection
Airframe
rage
+15 Hrs
150 HR
Tolerance
+15 Hrs
150 I r.
Tolerance
+15 Hrs
AD 90-02-05 Takeoff Alarm (S/N 1000 -1092)
150 HR:
EFTA_R1_00730450
EFTA02110407
X1292010 (P)
Airframe
Auxiliary Hydraulic Filter (Pressure) - Inspection
P/N: AC-B451F-8 SIN:
Due: End
Of Month
292012(P)
Airframe
Auxiliary Hydraulic Filter (Return) - Inspection
t,'
P/N: AC-B451F-8 SIN:
Due: End
Of Month
H 212033
Airframe
Ram Air Check Valve - Inspection
48 MC
Tolerance
+15 DAY
Due: End
Of Month
X 237004
Airframe
Cockpit Voice Recorder System - Operational Test
12 MC
Tolerance
+15 DAY
Due: End
Of Month
FA 240262 (P)
Airframe
Emergency Securaplane Battery / Heater Assembly
48 M
No. 3 - Replacement
Due: End
P/N: 362-0101-01 SIN: 0707149
Of Month
270011
Airframe
Control Surface Hinge Joints - Lubrication
12 MC
+15 DAY
Due: End
Of Month
275013
Airframe
Emergency Flap System - Operational Test
48 t..1(
Tolerance
+15 DAY
Due: End
Of Month
EFTA_R1_00730451
EFTA02110408
MI 321053 (P)
Airframe
Main Landing Gear (Left) - Corrosion Prevention
48 Mc
24 MOS 'nit
18 321054 (P)
Airframe
Main Landing Gear (Right) - Corrosion Prevention
48 MC
ISM=
+15 DAY
Due: End
Of Month
24 MOS Init
DI 322040 (P)
Airframe
Nose Gear Strut Assembly - Corrosion Prevention
48 MC
Tolerance
+15 DAY
Due: End
Of Month
Event Category
Lubrication/Servicing (S)
Mfg Ref Number: 32-22-00
Doc: GIV AMM Rev: Temp Rev 57-2 Issued: 28 Aug 2005
Section: 05-01-00
Documents
AMM 322040
Task Card
Watched RII
Ops Package
PN
Enter Part Number
SN
Last Updated By: Ru Vilcan Date: 20 Sep 2010 11:44
Show Remarks
Show C/W History
Show Related Codes
C/W Adjustments
Airframe Time used for Due Calculation
Hours:7690.5
Cycles:3545
Firs:
Lnd:
Freq
CM
7690.!
354!
17 Sep 201(
Ner
Est. Parts/Labor:
Mx. Note
No Part Information
Show C/W Adjustmer
Ops Spec
Initial Frequency:N/A
Recurring Frequency:48 MOS
Next
due
was not
adjuste
EFTA_R1_00730452
EFTA02110409
d.
17 Se 2010
Frequency Tolerance:+15 DAY
Part Details
Manufacturer:
RB - Rebuilt
R - Repaired
S • Serviceable
Install Status:
TC - Time
Continued
-Inspected
NI - Modified
N - New
0 - Overhauled
Current Part Run Time: HoursLandingsMonths
TSN
TSO
TSR
Vendor:
Mod Status:
NW Version:
Part
Warranty:
SW Version:
Labor
Warranty:
Maint Tag:
Airframe Time at Install
Part Time at Install
New Cost:
Hours:7690.5
Cycles: 3545
Date: 17 Sep 2010
Hours Cycles Months or Date ]
TSN:
El
TSO:
Overhauled:
Repaired:
TSR:
OEM Vendor:
Install Notes:
Vendor ID:
Compliance Remarks
---- FOR REFERENCE ONLY -----
346031 (P)
Airframe
FMS Navigation Computer No. 1 - Battery Pack
Replacement
Due: End
PIN: 7020116-1 SIN: NSN
Of Month
Custom
Frequency
IX 346032 (P)
Airframe
FMS Navigation Computer No. 2 - Battery Pack
24 ',1O5
Replacement
Due: End
P/N: 7020116-1 S/N: NSN
Of Month
Custom
Frequency
ISI 346033 (P)
Airframe
FMS Navigation Computer No. 3 - Battery Pack
Replacement
PIN: 7020116-1 SIN: NSN
24 MO£
EFTA_R1_00730453
EFTA02110410
982270
Airframe
CB 227 Oxygen (ATA 35), Replacement - Oxygen
System Flexible Hoses, PN O2C20T1
36 MOf.
Squawks and Discrepancies
Status
Squawk Date
Type
Description
Date Cleared
Cleared By
Corrective Action
Trk #
Init. MEL Date
MEL Type
Del Period
Ext
Ext Period
Tot Def Period
Exp
-----Original Message—
From: Jeffrey
acationegmail.com>
To: lvjet
Sent: Mon, Mar 24, 2014 3:06 pm
news to me on the June date. charter from st maarten? , outflow.?
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
retum e-mail or by e-mail to jeevacationeDgmail.com and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00730454
EFTA02110411
Technical Artifacts (37)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
acationegmail.comDomain
jeevacationedgmail.comDomain
mail.comPhone
2110383Phone
2110384Phone
2110385Phone
2110386Phone
2110387Phone
2110388Phone
2110389Phone
2110390Phone
2110391Phone
2110392Phone
2110393Phone
2110394Phone
2110395Phone
2110396Phone
2110397Phone
2110398Phone
2110399Phone
2110400Phone
2110401Phone
2110402Phone
2110403Phone
2110404Phone
2110405Phone
2110406Phone
2110407Phone
2110408Phone
2110409Phone
2110410Phone
2110411Phone
362-0101Phone
6000790Phone
7020116Wire Ref
REFERENCEWire Ref
Ref NumberRelated Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.