Skip to main content
Skip to content
Case File
efta-02316357DOJ Data Set 11Other

EFTA02316357

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02316357
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — October 2 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - New seats for gators, progators, beach cleaner - on STT 10/2 - Red Polaris Bike - Power Steering Module for ordered due NM — incorrect part arrived — LV sourcing in FL - Beach cleaner —de-rust it, clean it — 90% complete - Lull — non-operational, sourcing a mechanic to complete repair 3. Computers/Phones - Beach office — no Internet, phone, Time Clock — Jermaine will work at trying to resolve 4. Five Palms - Furniture — outside furniture in place — to tie down cushions to resolve wind issues, completed by 10/5 - Picture frame — measurements forwarded to - 86 x 70 - Mirrored siding — will continue to reglue — possible mural work - Fiber work/Phone — COMPLETE —Jermaine to provide estimates for "fiber secure box" inside 5 Palms 5. Grotto - Mattress cover —JE approved buying fabric — fabric ordered — due on site 10/5 6. Berm/Top of Hill - Hydroseed outside — in progress 7. Triangle - Must design triangle — awaiting JE direction - Need to review new palm installation — heli approach with Larry 8. Flagpole Pool Cabana - Furniture — desk from Paris —JE to select a fabric for seats on site — Sue - Review bottle palm lights — COMPLETE - Clock — unit rusted — have order 2 new units - 1 for backup - Yellow exercise pole —Carlos has completed 1 will work on other this week - Auto-closer on toilet door —will add to carpentry list - Hanging of paintings from PB - 10/3 9. Floating Dock - Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top investigate possible "rubber material" other possible solution - Dock boxes — struts should all be replaced — they are all backward — will add to carpentry list - "walk the plank" option — review material on this & floating dock — "rubberized material" 10. Chillax Room — Requires furniture piece for electrical/media equipment, reviewing pieces that are stored in PBI, which do not work, to review other options 11. Chillax Bathroom - require blue rugs for bathroom & vanity area -- 12. Mechanical Building Transformer — on site — to be removed off pallet 10/4, then review installation options 13. Boats - Lady G — sell — in hurricane storage — offer $60K via JE, Rich to negotiate pricing - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at AYH dock — have Subbase & Bob Kassner quote — reviewing — Putting together an estimate for hydraulic hoses and fittings to be completed "in house" — all to be forwarded by 10/8 - Inside cleaning 3 days/2 pers $720.00 supervised by Carlos, after final completion of work — approved JE - doors/windows in progress — Complete - cylinders/boxes in PR — EDA on STT 10/5 EFTA_R1_01214945 EFTA02316357 14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 15. Transient Surge Protection — due at Tropical 10/9 16. Landscaping — Peter's List - High road trees - High road waterfall — details required - Line all roads with stones - Pop's Garden — need deer protection — Danny suggested install a motion detector with a strobe light - the deer will activate the light/sound — JE approved 9/24 — Danny will forward 10/5 - Shade cloth — on L.51 — Peter installed one for JE review - Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress - Peter to clean the sides of the road — work in progress - Black Heli Under Pads — install at top of bike path at MC — not enough on site to complete project. Have located dealer, require amount to order will review 10/3 - Review growth of sea grape - engineering area - Hydroseed all pull box areas & engineering - Take out the single tree in engineering - Peter might want to cut it, so not to damage lines - PR Coconut Palms — planted at main entrance, blue beach (5), berm, Five Palms, MBR — completed 9/27 17. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review details with Better Roads — week of 10/1 18. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 19. New Employee Bathrooms 20. Gym - New punching bag — installation of the speed bag on hold 9/22 - per JE until visit • New front & back doors installation — will complete after visit 21. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood required 22. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response 23. Hangar - Fuel Containment Pad — draft approved, drainage incorporated — survey forwarded to the architect 9/18 - he will complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21) 24. Steel shed — Buck Steel —JE approved mock-up 9/26, changes 9/27— Buck Steel working on the final specs/quote 25. Equipment to be Purchased - (1) light generator, (2) arms with lights to be hard wired - quote due 10/5 - (1) skid steer on site — require forks, ordered 10/3 - (1) John Deere box and blade — Brice has recommended JD 5101E AWD — loader, scraper, digger, 100hp, enclosed cab - (1) man-lift - (2) golf cars — 2 seater • (1) dump truck — JE approved purchase — 2012 Ford F450 - $15,000 deposit sent 9/25, shipment booked at Tropical -(1) mini excavator - (1) Jet ski trailer 26. LSJ Mats — for all locations — ordered 9/22 27. Engineering — start emptying/relocating items in remaining 20 foot containers 10/15 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 29. Part Time Employees —M forwarded information of 2 potential part-time housekeepers to 9/25 — to schedule meeting with them on 10/3 30. Heli Pad - reinstall windsock to north side of helipad - JE & Larry to review lights and windsock location when next on site EFTA_R1_01214946 EFTA02316358 31. Cisterns — need to be cleaned and sealed work to begin 11/1 32. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light —JE to review when on site • Solar quote reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable, awaiting update 33. Master Bedroom — door sliders require waxing and alignment — to be completed after vist EFTA_R1_01214947 EFTA02316359

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2316357
Phone2316358
Phone2316359

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.