Skip to main content
Skip to content
Case File
efta-02335949DOJ Data Set 11Other

EFTA02335949

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02335949
Pages
4
Persons
0
Integrity

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779-8426 Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms We accept cash, chec s. major cred't cards. travelers checks and wired funds. More info available regarding wired monies. Ann/Boseoe Big N/LSJ Barge Upon Completion Qty/Hrs Description Rate Amount I 12 I 12 I Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list" this morning. I will list all projects that I can with a quote for each repair but first I would like to comment on the condition of the LSJ Barge. This vessel was hauled out at our yard three years ago . During that haul out Subbase quoted on most of the items you have in this current list. It was surprising to see that our recommendations were not completed and as a result the current condition of the vessel is not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs that were essential were cobbled together in an effort to get by. The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended service life. Subbase in not interested in making any repairs that will not be done properly; nor are we interested in patching anything together for a temporary fix. I understand that some projects may be more important then others so I will try to list each project individually. Drydock hauling fees Laydays: Approx 12 Electricity Fee: Hook Up Electricity Fee: per day 5000 psi pressure wash 1,500.00 350.00 75.00 60.00 327.00 1,500.00 4,200.00 75.00 720.00 327.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release part/parts, projects or vessels for which/on which the above detailed has been performed until payment in full is received. any work Payments/Credits Balance Due Page 1 EFTA_R1_01294695 EFTA02335949 Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779-8426 Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms We accept cash, chec s. major cred't cards. travelers checks and wired funds. More info available regarding wired monies. Ann/Boscoc Big N/LSJ Barge Upon Completion Qty/Hrs Description Rate Amount I I 1 3-B) I I & 2 ) Rudders: Subbase personnel examined the rudder room and we were able see major corrosion on the transom. The hull plating has holes where sea water is seeping into the vessel. The steering components need to be removed and cleaned, the rudders need to be removed and serviced. The lower Pintle and gudgeons need service as well as the rudder stuffing box. I would reserve 10k to 20k for this project. I have included pictures of this compartment. 3-A) Install two cylinders with stainless steel shafts; including all hoses back to engine room, with stainless steel ends on all hoses. We will re-evaluate the valving and other engine room components to see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. The steel boxes that secure the cylinders to the hull are deteriorated and will need replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three years ago we quoted $16,000.00 for both boxes and we will still honor this quote. 4) The exhaust system is in a non-repairable condition and needs replacement from the main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust mixers, and new exterior aluminum outlet. When system is complete it will be wrapped with a removable wire mesh hi-temp blanket. The new system will be much quieter than the existing exhaust system. Labor and material $21,000.00. 20,000.00 45.000.00 16,000.00 24,500.00 20,000.00 45.000.00 16,000.00 24,500.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release part/parts, projects or vessels for which/on which the above detailed has been performed until payment in full is received. any work Payments/Credits Balance Due Page 2 EFTA_R1_01294696 EFTA02335950 Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779-8426 Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms We accept cash, chec s. major cred't cards. travelers checks and wired funds. More info available regarding wired monies. Ann/Boscoe Big N/LSJ Barge Upon Completion Qty/Hrs Description Rate Amount I 1 1 I I I 5) Engine mounts need to be de-scaled of rust. Bolts holding mounts need to be cleaned or renewed and alignment from coupling to shaft needs to be checked and adjusted for proper tolerances. An extensive review was completed of this drive train back in 2012 with repair recommendations made at that time. I do not know if this problem was solved so to budget for this I would reserve 5k to 7k for this project. (before exhaust system is finalized this alignment must be done). 6) Stuffing boxes: Subbase was informed that new stuffing boxes arc on hand and will be owner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal the condition of shaft log. I would reserve 5k for this project. Cutless bearings require removal of main shafts and propellers: After removal of coupling, shafts and props a condition report will follow if drive train is serviceable the routine maintenance for renewing cutless bearing will only need attention. Labor and material for this is (both port and starboard) $4,150.00. 8) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve $1,200.00 9) Bottom paint and barrier coat: Labor and material $7,500.00. 10) Engine and marine gear - Review upon haul out — QUOTE WILL BE ISSUED — II) Fuel tank: Cleaning and disposal Items 12 thru 18 will need more time to evaluate --- QUOTES WILL BE ISSUED --- 7.000.00 5.000.00 4,150.00 1.200.00 7,500.00 0.00 2.800.00 7,000.00 son® 4,150.00 1,200.00 7,500.00 0.00 2,800.00 0.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release part/parts, projects or vessels for which/on which the above detailed has been performed until payment in full is received. any work Payments/Credits Balance Due Page 3 EFTA_R1_01294697 EFTA02335951 Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779.8426 Invoice Date Invoice # 4,23 1 015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms We accept cash, checks. major cred't cards. travelers checks and wired funds. More info available regarding wired monies. Ann/Boscoe Big N/LSJ Barge Upon Completion QtylHrs Description Rate Amount 1 I 19) Clean engine room: Before any repairs arc started clean and degrease entire engine room, dispose of oily water. After repairs are complete clean and paint engines and any other areas that were painted. Remove engine hatch covers and assess condition. Make necessary repairs and reinstall after all. Labor and material 55,500.00 20) Hydraulic Tank: Duc to severe corrosion of the steel hydraulic tank, Subbase reccomends replacing tank with new marine grade aluminum tank complete with all necessary fittings and sight glass to view levels. Labor and Materials. ***One-third due at mobilization, one-third at 50% completion and balance at completion*" 5,500.00 - .ilku Int l 5.500.00 :. i II Thank you for your business. Total sIS11,472.110 Please note Subbase Drydock Inc. reserves the right to not release part/parts, projects or vessels for which/ on which the above detailed has been performed until payment in full is received any work Payments/Credits - I ,111)1}.( i Balance Due $1-19.-172.00 Page 4 EFTA_R1_01294698 EFTA02335952

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.