From: Daphne Wallace Sent: Wednesday, April 8, 2015 9:21 PM To: Jeffrey Epstein Subject: Proposed Schedule for Better Roads Paving Project - April 8, 2015 Greetings Sir, <= class="MsoNormal" style="margin-bottom:0.0001pt;font-size:16px;backgr=und-image:initial;background- repeat:initial"> As promised, for your review and comments, is a summary of a proposed p=an and schedule for the Road Paving proj=ct: Better Roads will mobilize their equipment and lighter materials, using Boyson=/span>, spend =his first week prepping, to begin laying the asphalt the week of June 15th= Big N would be the auxiliary vessel for transportation th=oughout the work day in the event Better4>=AORoads needs an extra load for that day= or if they need to transport support equipment. Better Roads will coordinate with LSJ on transportation needs. In the event that =ig N is not available, we will work the extra trips in to Boyson's sch=dule. Presuming that the scope of the project is still th= same, Better Roads estimates transporting 75-80 truckloads of asphalt in total for th= project. They will need 5-7 truckloads per day. Bet=er Roads has planned a 5 day per =eek schedule, and will leave Saturdays and Sundays for "rain days=E2$4. Boyson can move 2-3=trucks per trip. To catch the high tide, Bette= Roads will be at Red Hook at 6:3= am with all 6 loads. Boyson will take t=e first group (2.3 trucks), turn right around and deliver the second group= and a third group if needed. Boysoni>=A0would then come back before the end of the day to return the 6 trucks to=STT. Better Boyson does not have to make extra runs to =eturn empty trucks for other jobs on STT= Better Road= was asked, and they are willing to transport materials and/or=supplies back from LSJ on return trips t= St. Thomas. EFTA_R1_01344634 EFTA02357909 The proposed schedule outlined for your revie= is as follows: <=pan style="font-size:l2pt;font-family:Arial,sans-serir> Week 1: Monday, June 8 to Friday, June 12 = Using Boyson -Better=C24>Roads mobilizes equipment to LSJ, comple=e prep work on LSJ Boysonaspan> -Better Roads paving (30 loads) =C2* Week 3: Monday, June 22 to=Friday, June 26 - =C240=C2Q=C2* Better=span style="font-family:Arial,sans-serif;font-size:12pt"> Roads<=span> (30=loads) Week 4: Monday, =une 29 to Wednesday, July 1- Boyson aiv>- Better Roads (20 lo=ds) Respectfully submitted, Daphne 2 EFTA_R1_01344635 EFTA02357910

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2357909
Phone2357910

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.