Skip to main content
Skip to content
Case File
efta-02369618DOJ Data Set 11Other

EFTA02369618

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02369618
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Thursday, June 30, 2016 5:57 PM To: jeffrey E. Subject: Fwd: Florida Windows Attachments: Screenshot 2016-06-29 15.09.20.png; Untitled attachment 00436.htm; Screenshot 2016-06-29 15.30.04.png; Untitled attachment 00439.htm; Screenshot 2016-06-29 15.09.10.png; Untitled attachment 00442.htm; Screenshot 2016-06-29 15.09.00.png; Untitled attachment 00445.htm; image003.jpg; Untitled attachment 00448.htm; SAF- Q16-040 -B Richard Kahn Proposal .pdf; Untitled attachment 00451.htm; SAF- Q16-040 -B Richard Kahn TakeOff .pdf, Untitled attachment 00454.htm i know you approved =lready however i wanted to send you all facts that i am aware of so =here are no surprises 1) =indow Functionality currently you have horizontal rollers =see picture 1 below) unfortunately =orizontal rollers are no longer made in wood mahogany Hartman (original bid =rom dan labonte and vendor that supplied LSJ) proposed a wood mahogany =utswing casement window (see picture 2 below) bid =as 224,250 before other work, permit fees and gc fees -> projected =ost 298,000 Coastal proposed a wood mahogany tilt and turn window (see =ictures 3 & 4 below) Proposal was for windows =o tilt and turn in (picture 3) however if you do not like they can tilt =nd turn out (picture 4) Scott from Coastal =elieves the tilt and turn in is a better design negotiated bid is 90,000 before other work and permit fees => projected cost 125,000 2) Next =teps a) wire requested is 50% of materials and =ermit fees or 32,727.83 along with signed contract b) shop drawings will be ready in 2 weeks for your =eview c) file for permit d) order windows (12-14 weeks) e) =nstall windows (2-3 weeks) Projected completion date November 1- 15 3) Other contractor work =equired Drywall / Stucco repairs Repaint trim =nd walls around windows EFTA_R1_01369945 EFTA02369618 Protection Remove any window treatments and put back when =ompleted Remove any art and furniture Alarming of new windows Removal =nd reinstall of storm shutters 4) Work to be provided by Coastal =indows Removal of old and installation of new =indows Bucking / Waterproofing Rain simulation testing Scaffolding Portajon 5) Other Notes a) Windows will be staged in garage bay =t 358 el brillo b) Windows (interior and exterior) =ill receive 2 coats of primer and 2 coats of topcoat c) Hardware for Multipoint lock system (medco or tricoat) =nbsp;- you will choose at time of shop drawings (satin nickel, oil =ubbed finish) d) Framing currently is 2.5 inches =hick and new window frames will be 3 inches thick e)=Currently we do not have screens and they are not proposed in =id f) Warranty - 1 year on installation and 10 =ears from manufacturer for failure in workmanship g)=House to be painted after windows are installed (3.4 weeks) Please advise if ok to proceed Thank=you PICTURE = 2 EFTA_R1_01369946 EFTA02369619

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2369618
Phone2369619
Wire Refwire requested

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.