From:
Richard Kahn
Sent:
Thursday, June 30, 2016 5:57 PM
To:
jeffrey E.
Subject:
Fwd: Florida Windows
Attachments:
Screenshot 2016-06-29 15.09.20.png; Untitled attachment 00436.htm; Screenshot
2016-06-29 15.30.04.png; Untitled attachment 00439.htm; Screenshot 2016-06-29
15.09.10.png; Untitled attachment 00442.htm; Screenshot 2016-06-29 15.09.00.png;
Untitled attachment 00445.htm; image003.jpg; Untitled attachment 00448.htm; SAF-
Q16-040 -B Richard Kahn Proposal .pdf; Untitled attachment 00451.htm; SAF-
Q16-040 -B Richard Kahn TakeOff .pdf, Untitled attachment 00454.htm
i know you approved =lready however i wanted to send you all facts that i am aware of so =here are no surprises
1) =indow Functionality
currently you have horizontal rollers =see picture 1 below)
unfortunately =orizontal rollers are no longer made in wood mahogany
Hartman (original bid =rom dan labonte and vendor that supplied LSJ) proposed a wood mahogany =utswing
casement window (see picture 2 below)
bid =as 224,250 before other work, permit fees and gc fees -> projected =ost 298,000
Coastal proposed a wood mahogany tilt and turn window (see =ictures 3 & 4 below)
Proposal was for windows =o tilt and turn in (picture 3) however if you do not like they can tilt =nd turn out
(picture 4)
Scott from Coastal =elieves the tilt and turn in is a better design
negotiated bid is 90,000 before other work and permit fees => projected cost 125,000
2) Next =teps
a) wire requested is 50% of materials and =ermit fees or 32,727.83 along with signed contract
b) shop drawings will be ready in 2 weeks for your =eview
c) file for permit
d) order windows (12-14 weeks)
e) =nstall windows (2-3 weeks)
Projected completion date November 1- 15
3) Other contractor work =equired
Drywall / Stucco repairs
Repaint trim =nd walls around windows
EFTA_R1_01369945
EFTA02369618
Protection
Remove any window treatments and put back when =ompleted
Remove any art and furniture
Alarming of new windows
Removal =nd reinstall of storm shutters
4) Work to be provided by Coastal =indows
Removal of old and installation of new =indows
Bucking / Waterproofing
Rain simulation testing
Scaffolding
Portajon
5) Other Notes
a) Windows will be staged in garage bay =t 358 el brillo
b) Windows (interior and exterior) =ill receive 2 coats of primer and 2 coats of topcoat
c) Hardware for Multipoint lock system (medco or tricoat) =nbsp;- you will choose at time of shop drawings
(satin nickel, oil =ubbed finish)
d) Framing currently is 2.5 inches =hick and new window frames will be 3 inches thick
e)=Currently we do not have screens and they are not proposed in =id
f) Warranty - 1 year on installation and 10 =ears from manufacturer for failure in workmanship
g)=House to be painted after windows are installed (3.4 weeks)
Please advise if ok to proceed
Thank=you
PICTURE =
2
EFTA_R1_01369946
EFTA02369619
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2369618Phone
2369619Wire Ref
wire requestedRelated Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01765224
0p
DOJ Data Set 11OtherUnknown
EFTA02328489
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02125460
0p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
4p
DOJ Data Set 11OtherUnknown
EFTA02489202
1p
DOJ Data Set 10OtherUnknown
EFTA02086739
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.