Skip to main content
Skip to content
Case File
efta-02370575DOJ Data Set 11Other

EFTA02370575

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02370575
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet < Sent: Friday, August 29, 2014 10:52 PM To: [email protected] Subject: 6727 APU troubles still lef=rey, The Boeing APU was working Great when =e arrived in Palm Beach, it started every time,. =div>My only problem after we landed in PBI, APU generator n=t coming on line, after the first two days of trouble sho=ting, now the APU will not completely start, The APU flames=20out during the start, which was original problem in Georgia= I have tried 4 APU speed switches, most of the speed s=itches were old and possessed overhaul tags over 8 years ag=, (speed switch is the hart of the APU start sequence= it opens fuel valve, disengages starter etc. I located=20a New stock speed switch, and it failed to start the =PU,. Larry Morrison, Big Sky Aviation in Palm Beach, =tambaugh are all involved in trouble shooting. Today we di=covered the Fuel start value was not staying open, this is =ontrolled by Speed Switch mainly, this is promising. , =OA this issue reminds me of the Cesnna 421 Prop RPM=20issue, that exhausted us. =div>All involved are working very hard to resolve this issue<=div> thank you Larry 1 EFTA_R1_01372569 EFTA02370575

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2370575

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.