Case File
efta-02379919DOJ Data Set 11OtherEFTA02379919
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02379919
Pages
15
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Lvjet 4
>
Sent:
Thursday, January 9, 2014 4:57 AM
To:
[email protected]
Subject:
mounts
Jeffrey,
My records indicate Fwd mounts have been changed Dec 15, 2008 dur=ng engine overhaul,.
The L/H and R/H Aft mounts were changed in 1998 according to CMP repor= below,.,.
total time at this time: 8643
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712061 (P)
Isolator (Left Forward Mount, F=rward) - Removal / Installation
P/N: 94756-04 S/N: 5541
Event Category
Part (P) PN 94756.04 Enter Part Number
C/W
Hrs:
7178.6
Lnd:
3292
15 Dec 2008
Airframe
Vibration
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Freq <javascript:op=nCustomFreq(3415926);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoadere34159261>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:15
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2061> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
EFTA_R1_01393785
EFTA02379919
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,750.34
Overhauí:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
ATA 712061 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
94756-04
ON : 5541
7,178.6 3,292
15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3415926', 18903364)>
<javascript:openCompHistImageLoader( '3415926',='18903364' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascri pt:openComplHistE= itor(
'3415926', 1306914 )>
<javascript:openCompHistImageLoader( '3415926',='1306914' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3415926', 5283603 )>
<javascript:openCompHistImageLoader( '3415926',='5283603' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712062 (P)
Airframe
Vibration
Isolator (Left Forward Mount, A=t) - Removal / Installation
P/N: 94756-04 S/N: 5537
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
2
EFTA_R1_01393786
EFTA02379920
Hrs:
7178.6
Ind:
3292
15 Dec 2008
Freq <javascript:op=nCustomFreq(3414655);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageloadere34146551>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:18
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2062> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles konths or Date ]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
$1,750.34
Overhauí:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
3
EFTA_R1_01393787
EFTA02379921
Part (P) PN 94756.94756.13 Enter Part Number
C/W
Hrs:
3601.0
Lnd:
1644
11 Dec 1998
Freq <javascript:op=nCustomFreq(3417398);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-sire: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoadere34173981>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:21
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2063> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span> airframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type='checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Overhauled
TSN
ISO
TSR
Vendor:
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Part Time at Install
Hours
TSN:
TSR:
New Cos=:
Overhauí:
Repaire=:
Instal I Status:
RB RebuiltR Repairedl InspectedM ModifiedN - NewO -
Current Part Run Time: Hours
Landings
Months
Mod Sta=us:
Part Warranty:
Labor Warranty:
Airframe Time =t Install
Cycles I =onths or Date j
= <javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,747.28
4
EFTA_R1_01393788
EFTA02379922
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
11 Dec 1998
Freq <javascript:op=nCustomFreq(3417344);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoadert34173441>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:23
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2064> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles l =onths or Date)
TSN:
= <javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
$1,747.28
5
EFTA_R1_01393789
EFTA02379923
Overhauí:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
ATA 712064 Compliance History
Part ON It
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756-13
ON : 2982
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '3417344', 2664578)>
<javascript:openCompHistImageLoader( '3417344',='2664578' )>
OFF : 13636-94756-03 OFF: 0521
0.00
GAC-APP
ON : 13636-94756-03
ON : 0521
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417344', 5751294)>
<javascript:openCompHistImageLoader( '3417344',&5751294' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712065 (P)
Isolator (Right Forward Mount, =orward) - Removal / Installation
P/N: 94756.04 S/N: 5536
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
Hrs:
7178.6
Lnd:
3292
15 Dec 2008
(view)
[view)
Airframe
Vibration
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Freq <javascript:op=nCustomFreq(3417286);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: axial; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoaderc34172861>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:26
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2065> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
6
EFTA_R1_01393790
EFTA02379924
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,750.34
Overhauí:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
ATA 712065 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
94756-04
ON : 5536
7,178.6 3,292
15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3417286', 18903366)>
<javascript:openCompHistImageLoader( '3417286',='18903366' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascri pt:openComplHistE= itor(
'3417286', 1372783 )>
<javascript:openCompHistImageLoader( '3417286',='1372783' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417286', 5308553 )>
<javascript:openCompHistImageLoader( '3417286',='5308553' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712066 (P)
Airframe
Vibration
Isolator (Right Forward Mount, =ft) - Removal / Installation
P/N: 94756.04 S/N: 5538
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
7
EFTA_R1_01393791
EFTA02379925
Hrs:
7178.6
Ind:
3292
15 Dec 2008
Freq <javascript:op=nCustomFreq(3417626);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;'500cumentsAMM 712061Task
Card <javascript:openComplmageloadere34176261>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:29
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2066> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Overhauled
TSN
TSO
TSR
Vendor:
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Part Time at Install
Hours Cycles konths or Date ]
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,750.34
TSN:
TSR:
New Cos=:
Overhauí:
Repaire=:
OEM Ven=or:
Part ON #
Part OFF #
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Current Part Run Time: Hours
Landings
Months
Mod Sta=us:
Part Warranty:
Labor Warranty:
Airframe Time =t Install
BARRY CONTROLS AEROSPACE Install Notes:
Serial ON #
Serial OFF #
ATA 712066 Compliance History
CW Hrs CW Cyc
CW Date
Actual Cost
Remark/ Malfunction Actual Labor
Facility
Work Order #
8
EFTA_R1_01393792
EFTA02379926
94756-04
ON : 5538
7,178.6 3,292 15 Dec 2008
0.00
<javascript:openComplHistE=itor( '3417626', 18903367)>
<javascript:openCompHistlmageloader( '3417626',='18903367' )>
OFF:
0.00
[view]
94756-04
ON :
3,601.0 1,644 11 Dec 1998
0.00
(view] <javascript:openComplHistE=itor(
'3417626', 1874829 )>
<javascript:openCompHistImageLoader( '3417626',='1874829' )>
OFF:
0.00
GAC-APP
ON : 94756-04
ON :
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3417626', 5478663 )>
<javascript:openCompHistImageLoader( '3417626',&5478663' )>
0.00
=/div>
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712067 (P)
Airframe
Vibration
Isolator (Right Aft Mount, Forw=rd) - Removal / Installation
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
P/N: 94756-13 S/N: 2993
Event Category
Part (P) PN 13636-94756-0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
11 Dec 1998
Freq <javascript:op=nCustomFreq(3414842);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: anal; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoaderc34148421>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:31
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2067> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">0ps Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
9
EFTA_R1_01393793
EFTA02379927
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles [ =onths or Date]
TSN:
<javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> atd>
New Cos=:
$1,747.28
Overhauí:
Repaire=:
OEM Ven=or:
BARRY CONTROLS AEROSPACE Install Notes:
ATA 712067 Compliance History
Part ON #
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756-13
ON : 2993
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '3414842', 4484068)>
<javascript:openCompHistImageLoader( '3414842',='4484068' ►>
OFF : 13636-94756-03 OFF: 0518
0.00
GAC-APP
ON : 13636-94756-03
ON : 0518
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3414842', 6381279)>
<javascript:openCompHistImageLoader( '3414842',='6381279' )>
0.00
=/div>
[view]
[view]
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712068 (P)
Airframe
Vibration
Isolator (Right Aft Mount, Aft)=- Removal / Installation
P/N: 94756-13 S/N: 2994
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs:
3601.0
Lnd:
1644
11 Dec 1998
10
EFTA_R1_01393794
EFTA02379928
Freq <javascript:op=nCustomFreq(3415890);>
SN
Mfg Ref Number: 71.01.00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task
Card <javascript:openComplmageLoader('3415890')>
Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06Þc 2012 13:34
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2068> OEM Labor Hours:4.0
Mx. Notes:
Special Notation: Show Related=Codes
Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
N/A
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
tYPe="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
TSO
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours
TSN:
TSR:
New Cos=:
Overhauí:
Repaire=:
OEM Ven=or:
Part ON #
Part OFF #
Cycles I =onths or Date
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> <=td>
$1,747.28
BARRY CONTROLS AEROSPACE Install Notes:
ATA 712068 Compliance History
Serial ON #
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Serial OFF #
Remark / Malfunction Actual Labor
Facility
ON : 94756.13
ON : 2994
3,601.0 1,644 11 Dec 1998
0.00
<javascript:openComplHistE=itor( '341589U, 3700147 )>
<javascript:openCompHistImageLoader( '3415890',='3700147' )>
OFF : 13636-94756-03 OFF: 0496
0.00
GAC-APP
(view)
11
EFTA_R1_01393795
EFTA02379929
ON : 13636-94756-03
ON : 0496
0.0
0
07 Dec 1988
0.00
<javascript:openComplHistE=itor( '3415890', 6087564)>
<javascript:openCompHistImageloader( '3415890',.'6087564' )>
0.00
=/div>
(view)
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712069 (P)
Airframe
Engine
Vibration Isolator (Left) - Clean = Inspect / Repair
120 MOS (C)=/span>
Due: End Of Month
Custom Frequency
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if>
59 Mos
Event Category
Special Inspection (M) PN Enter Par= Number
C/W
Used Due
Remains
Hrs:
7178.6
Lnd:
3292
15 Dec 2008
MO=
31 Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3415308);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71.01.00
Doc:
R=v:
=ssued: 01 Mar 1986
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task
Card <javascript:openComplmageLoader('3415308')>
Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09
Est. =arts/Labor: $0.00/0.00 Hrs.
chttps://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2069> OEM Labor Hours:16.0
Mx. Notes:
Special Notation: Show Related=Codes
No Part Information
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
120 MOS
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer:
Install Status:
RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
ISO
TSR
12
EFTA_R1_01393796
EFTA02379930
Vendor:
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Part Time at Install
Hours Cycles
TSN:
TSR:
New Cos=:
Overhauí:
Repaire=:
OEM Ven=or:
Event Category
Special Inspection (M) PN Enter Par= Number
C/W
Used Due
Remains
Hrs:
7178.6
Mod Sta=us:
Part Warranty:
Labor Warranty:
Airframe Time =t Install
Lnd:
3292
=onths or Date ]
= <javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> atd>
Install Notes:
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> 59 Mos
15 Dec 2008
MO=
31 Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3416340);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71-01-00
Doc:
R=v:
=ssued: 01 Mar 1986
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task
Card siavascript:openComplmageLoader('34163401)>
Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09
Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2070> OEM Labor Hours:16.0
Mx. Notes:
Special Notation: Show Related=Codes
No Part Information
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value="on">Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:<=font>
120 MOS
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer:
Install Status:
RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled
Current Part Run Time: Hours
Landings
Months
TSN
ISO
13
EFTA_R1_01393797
EFTA02379931
TSR
Vendor:
Mod Sta=us:
HW Vers=on:
Part Warranty:
SW Vers=on:
Labor Warranty:
Maint T=g:
Airframe Time =t Install
Hours:
Cycles:
Part Time at Install
Hours Cycles [ =onths or Date)
TSN:
= <javascript:doNothing();>
</=> <javascript:doNothing();>
TSR:
<javascript:doNothing();> <=td>
New Cos=:
Overhauí:
Repaire=:
OEM Ven=or:
Install Notes:
MA 712070 Compliance History
Part ON #
Serial ON St
CW Hrs CW Cyc
CW Date
Actual Cost
Work Order #
Part OFF #
Serial OFF St
Remark / Malfunction Actual Labor
Facility
7,178.6 3,292
15 Dec 2008
0.00
[view) <javascript:openComplHistE=itor( '3416340',
18903347)>
<javascript:openCompHistImageLoader( '3416340',='18903347' )>
0.00
3,601.0 1,644 11 Dec 1998
0.00
[view] <javascript:openComplHistEritor( '3416340',
2556375)>
<javascript:openCompHistImageLoader( '3416340',&2556375' )>
0.00
GAC-APP
1,020.0 413
05 Apr 1992
0.00
[view] <javascript:openComplHistE=itor( '3416340',
5682341)>
<javascript:openCompHistlmageloader( '3416340',='5682341' ►>
0.00
=/div>
712071 (P)
Airframe
Engine Isolator Mount Bolt Assembly (Left= Forward) - Scrap
P/N: 94756-07 S/N: 5302
8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif>
6540.0 Hrs
<=div>
712072 (P)
Airframe
Engine Isolator Mount Bolt Assembly (Righ=, Forward) - Scrap
P/N: 94756-07 S/N: 5319
8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif>
6540.0 Hrs
14
EFTA_R1_01393798
EFTA02379932
Event Category
Replacement (X)
PN 94756-07' Enter Part Number
C/W
Due
Remains
Hrs:
7178.6
15178.6
6540.0
Lnd:
3292
15 Dec 2008
Freq <javascript:op=nCustomFreq(18270374);> Next Due per Flight Utilization:&n=sp; 31 Oct 2035
SN
Mfg Ref Number: 71.01.00
Doc: GIV AMM Rev: =4 Issued: 3= Apr 2013
Section: 05-02-00
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712071Task
Card <javascript:openComplmageLoadert182703741)>
Watched RII
Est. =arts/Labor: $0.00/0.00 Hrs. OEM Labor Hours:0.0
Mx. Notes: compliance transfered from code 712018 Special Notation: Ops Spec
Hours:
Initial Frequency:
N/A
Cycles:
Recurring Frequency:afont>
8000 Hrs
Next due was not adjusted.
<=tr>
Frequency Tolerance:<=font>
+500 Hr Over Flight </=ont>
= =input name="currentCyclesComponent" type="hidden" value="4005.000"> =input name="isPartRel" type="hidden"
value="1"> S ServiceableTC - Time Continuedl - InspectedM - ModifiedN - NewO - Overhauled Current Part Run Time:
Hours
Landings
Months
TSN
ISO
TSR
Vendor:
HW Vers=on:
SW Vers=on:
Maint T=g:
Hours:
Cycles:
Part Time at Install
Hours Cycles i=onths or Date]
<javascript:doNothing();>
</=> <javascript:doNothing();>
<javascript:doNothing();> atd>
$635.64
TSN:
TSR:
New Cos=:
Overhauí:
Repaire=:
OEM Ven=or:
Vendor =D:
V000020996
Mod Sta=us:
Part Warranty:
Labor Warranty:
Airframe Time =t Install
BARRY CONTROLS AEROSPACE Install Notes:
Compliance Remarks
FOR REFERENCE ONLY
P/N 94756-07. Not to exceed 8500 hours. Reco=mended at scheduled engine overhaul.
15
EFTA_R1_01393799
EFTA02379933
Technical Artifacts (74)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Phone
(3414655Phone
(3414842Phone
(3415308Phone
(3415890Phone
(3415926Phone
(3416340Phone
(3417286Phone
(3417344Phone
(3417398Phone
(3417626Phone
18270374Phone
18903347Phone
18903364Phone
18903366Phone
18903367Phone
2379919Phone
2379920Phone
2379921Phone
2379922Phone
2379923Phone
2379924Phone
2379925Phone
2379926Phone
2379927Phone
2379928Phone
2379929Phone
2379930Phone
2379931Phone
2379932Phone
2379933Phone
2556375Phone
2664578Phone
2703741Phone
302
8000Phone
319
8000Phone
3414842Phone
3415308Phone
3415890Phone
3415926Phone
3416340Phone
3417286Phone
3417344Phone
3417626Phone
3700147Phone
4146551Phone
4148421Phone
4159261Phone
4163401Phone
4172861Phone
4173441Phone
4173981Phone
4176261Phone
4484068Phone
5283603Phone
5308553Phone
5478663Phone
5682341Phone
5751294Phone
6087564Phone
6381279URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2061URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2062URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2063URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2064URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2065URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2066URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2067URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2068URL
https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumberq2070URL
https://cmp.mygulfstream.com/images/dotGree=.gifURL
https://cmp.mygulfstream.com/images/dotGreen.=ifWire Ref
REFERENCEWire Ref
Ref NumberForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.