Skip to main content
Skip to content
Case File
efta-02393459DOJ Data Set 11Other

EFTA02393459

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02393459
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Wednesday, May 20, 2015 2:16 PM To: jeffrey E. Subject: Fwd: Proposed Schedule for Better Roads Paving Project - April 8, 2015 attached was daphne proposed schedule for asphalt and =arging please note =oyson has commitments for beginning of july with st john =estival please =dvise if we should tweak for mid July / august 2015 thank you Richard Kahn HBRK Associates Inc. Forwarded m - From: Daphne =allace Date: Wed, =pr 8, 201 at 4:20 PM Subject: Proposed Schedule for =etter Roads Paving Project - April 8, 2015 To: Jeffrey =pstein <[email protected] <mailto:[email protected]» Greetings=Sir, As =romised, for your review and comments, is a summary of a proposed plan =nd schedule for the Road Paving =roject: Week of =onday, June 8, 2015: Better Roads will mobilize =heir equipment and lighter materials, using Boyson, spend =his first week prepping, to begin laying the asphalt the week of June =5th. EFTA_R1_01422011 EFTA02393459 Big N =ould be the auxiliary vessel for transportation throughout the work day =n the event Better Roads needs an extra load for that day, or =f they need to transport support equipment. Better Roads will coordinate with L.S1 on transportation needs. In the event that Big N is not =vailable, we will work the extra trips in to Boyson's =chedule. Presuming=that the scope of the project is still the same, Better Roads estimates=transporting 75-80 truckloads of asphalt in total for the project. They =ill need 5-7 truckloads per day. Better Roads has =lanned a 5 day per week schedule, and will leave Saturdays and Sundays =or "rain days". Boyson can move 2-3 trucks per trip. To =atch the high tide, Better Roads will be at Red Hook at 6:30 am with all 6 =oads. Boyson will take the first =roup (2-3 trucks), turn right around and deliver the second group, and = third group if needed. Boyson would then come back before the end of the =ay to return the 6 trucks to STT. Better Roads will =eserve the trucks for this job only, so that Boyson does not have to make extra runs to return =mpty trucks for other jobs on STT. Better Roads was =sked, and they are willing to transport materials and/or supplies back =rom LSJ on return trips to St. =homas. The =roposed schedule outlined for your review is as follows: Week 1: =onday, June 8 to Friday, June 12 - Using Boyson -Better Roads mobilizes equipment to LSJ, complete prep =ork on LSJ Week 2: =onday, June 15 to Friday, June 19 - Using Boyson -Better Roads paving (30 loads) 2 EFTA_R1_01422012 EFTA02393460 Week 3: =onday, June 22 to Friday, June 26 - Boyson - =etter Roads (30=loads) Week 4: Monday, June 29 to Wednesday, July 1- Boyson - Better Roads (20 loads) Respectfully submitted, Daphne 3 EFTA_R1_01422013 EFTA02393461

Technical Artifacts (4)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2393459
Phone2393460
Phone2393461

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.