From:
Richard Kahn
Sent:
Wednesday, May 20, 2015 2:16 PM
To:
jeffrey E.
Subject:
Fwd: Proposed Schedule for Better Roads Paving Project - April 8, 2015
attached was daphne proposed schedule for asphalt and =arging
please note =oyson has commitments for beginning of july with st john =estival
please =dvise if we should tweak for mid July / august 2015 thank you
Richard Kahn
HBRK Associates Inc.
Forwarded m
-
From: Daphne =allace
Date: Wed, =pr 8, 201 at 4:20 PM
Subject: Proposed Schedule for =etter Roads Paving Project - April 8, 2015
To: Jeffrey =pstein <[email protected] <mailto:[email protected]»
Greetings=Sir,
As =romised, for your review and comments, is a summary of a proposed plan =nd schedule for the Road Paving
=roject:
Week of =onday, June 8, 2015: Better Roads will mobilize =heir equipment and lighter materials, using Boyson,
spend =his first week prepping, to begin laying the asphalt the week of June =5th.
EFTA_R1_01422011
EFTA02393459
Big N =ould be the auxiliary vessel for transportation throughout the work day =n the event Better Roads needs
an extra load for that day, or =f they need to transport support equipment.
Better Roads will coordinate with L.S1 on transportation needs. In the event that Big N is not =vailable, we will
work the extra trips in to Boyson's =chedule.
Presuming=that the scope of the project is still the same, Better Roads estimates=transporting 75-80 truckloads
of asphalt in total for the project. They =ill need 5-7 truckloads per day. Better Roads has =lanned a 5 day per week
schedule, and will leave Saturdays and Sundays =or "rain days".
Boyson can move 2-3 trucks per trip. To =atch the high tide, Better Roads will be at Red Hook at 6:30 am with all
6 =oads. Boyson will take the first =roup (2-3 trucks), turn right around and deliver the second group, and = third group if
needed. Boyson would then come back before the end of the =ay to return the 6 trucks to STT.
Better Roads will =eserve the trucks for this job only, so that Boyson does not have to make extra runs to return
=mpty trucks for other jobs on STT.
Better Roads was =sked, and they are willing to transport materials and/or supplies back =rom LSJ on return
trips to St. =homas.
The =roposed schedule outlined for your review is as follows:
Week 1: =onday, June 8 to Friday, June 12 - Using Boyson -Better Roads mobilizes equipment to LSJ, complete
prep =ork on LSJ
Week 2: =onday, June 15 to Friday, June 19 - Using Boyson -Better Roads paving (30 loads)
2
EFTA_R1_01422012
EFTA02393460
Week 3: =onday, June 22 to Friday, June 26 - Boyson
- =etter Roads (30=loads)
Week 4: Monday, June 29 to Wednesday, July 1- Boyson
- Better Roads (20 loads)
Respectfully submitted,
Daphne
3
EFTA_R1_01422013
EFTA02393461
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01765224
0p
DOJ Data Set 11OtherUnknown
EFTA02328489
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02125460
0p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
4p
DOJ Data Set 11OtherUnknown
EFTA02489202
1p
DOJ Data Set 10OtherUnknown
EFTA02086739
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.