Skip to main content
Skip to content
Case File
efta-02411721DOJ Data Set 11Other

EFTA02411721

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02411721
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epsteinueevacation gmail.com] Doug Schoettle I William Rowles From: Gary Kerney Sent: Sun 6/13/2010 2:34:57 PM Status of projects and outstanding issues for Jeffrey underlined LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1.ceilino treatment 2.cabinet finishes 3.floor finishes Status exterior 1.courtyard paving underway complete by the July 31 2.irragation main ine underway complete by July 15 Outstanding issues 1.landscape plans a.plants b.irracatiion plans c.fightino 2.Igala has trees tagged ready for delivery as soon as barge is ready MASTER SUITE Status interior 1.const under way subject to decisions being made should finish by Oct 31 Outstanding issues 1.steam bench 2.out side shower 3.lites over bed 4.lighting in bedroom 5.electrical in bath area 6.tub deck and surround 7.selection of wood floor 8.sourcing thassos slabs 9.powderroom vanity plan 10.shop drawings for stone Status exterior EFTA_R1_01473179 EFTA02411721 1.wall under way, complete by Aug 31 Outstanding issues 1.landscape plans..liting irr. KITCHEN Status 1.assume we get permit by July 1 should be complete by Nov.31 Outstanding issues 1.kitchen design 2.stair and wall design to master LAUNDRY 1.assume we get permit July 1 should complete by Oct 31 COTTAGES 1.const underway should complete by Sept 30 Outstanding issues 1.shower design MAIN HOUSE REMODEL Status no estimate to compleation til program complete 1.courtyard side plan final,proceeding 2.roofing proceeding Outstanding issues 1.north side program MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 4. theater by Jun 30 EFTA_R1_01473180 EFTA02411722

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com
Phone2411721
Phone2411722

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.