Case File
efta-02425591DOJ Data Set 11OtherEFTA02425591
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02425591
Pages
3
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
Jeevacation E stein 'eevacation
mail.com]
Cc:
; Gary Kerney
From:
Shelley
Sent:
Sat 5/8/2010 1:24:06 PM
Subject: Fwd: minutes of 5/6'10
with decision on time frames for next round of drawings, plus..
Begin forwarded message:
From: "Gary Kerney"
Date: May 7, 2010 3:17:27 PM EDT
To: "Jeffrey Epstein" <leevacation(Thclmail.com>
Cc:
Subject: minutes o
Agenda visit 5/6/10 WITH MINUTES 5/7/10
Master suite
1. Shower/steam design
put chair in tiki hut from master bed into the bathroom
RECIEVED FINAL PLANS
2. white tassos in steam/shower
a.white glass in dressing room
cost $ 55,000 5 months lead time plus install and shop drawing time
b.Tassos in dressing room
cost $ 30,000 2 months delivered and installed
SEE 1
3.tub and room design
DESIGN PENDING
4.arch openings between bed and bath
KEEP
5.wood flooring design, coral gone on dressing room floor
SEE 1
6.treatment of bedroom walls
PLASTER THEN ROBERT WILL DECIDE ON FINAL
7.door review?
ROBERT TO FORWARD PLAN MAY CLOSE OFF DOORS ON WEST
EFTA_R1_01493978
EFTA02425591
8.tv location decision made to not put desk in tiki hut back into bedroom
SEE 8
Library
courtyard design
GAVE ROBERT AS BUILTS AND REVIEWED ALTERNATIVE MATERIALS TO MAKE
DESIGNS Ready by May 11- 12th
Kitchen
1.interior design
SENT CAD DRAWINGS TO ABRAM,AND WENT OVER FUNCTION WITH BRICE,
ROBERT TO PRODUCE DESIGN DRAWINGS Ready by May 17 - 18th for view,
review in NY if possible
2.COLUMN DECISION Ready by May 11-12th
ROBERT TO DO TWO OR THREE ALTERNATIVES IN PHOTO SHOP GARY TO
PRICE
1 KEEP ARCHES WITH PLASTER COLUMNS
2 KEEP ARCHES WITH PLASTER COLUMNS AND STONE BASE
3 REMOVE ARCHES AND NEW STONE COLUMNS
-Cottages
1. Door approval
DONE
2. Shower decision
a.fully enclosed stone and tiled, seems to tight to me
b.collum plus roof and screen seems right
ROBERT TO SKETCH UP PLAN .GARY TO PRICE
3.Abram gave us direction on elect. how about TV?data ect.
4.design for vanities to replace pedestal sinks and any change to bath rooms(currently
none in budget)
ROBERT TO FORWARD PLAN/SPEC
Site
1.review wall progress
2.Get everyone thinking about walk from kitchen to master to library
EFTA_R1_01493979
EFTA02425592
WE REVIEWED THE SKETCHES AND ROBERT TO REFINE PLAN
Gensler
WE REVIEWED ROBERTS PLAN FOR THE THEATER /POOL AND HE WILL
REVISE AND FORWARD TO ME TO STAKE OUT To be viewed on May 14th
CZM Deionoh
Jeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and
indoor pool with Robert and you together
Publisher and Editor-in-Chief
Chocolate Sauce.
"Nourishing the Inner Worlds of Children"
EFTA_R1_0 1493980
EFTA02425593
Technical Artifacts (5)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
mail.comDomain
thclmail.comPhone
2425591Phone
2425592Phone
2425593Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01830186
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01835758
0p
DOJ Data Set 11OtherUnknown
EFTA02424987
1p
DOJ Data Set 10OtherUnknown
EFTA01985346
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01527947
0p
DOJ Data Set 10OtherUnknown
EFTA01835141
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.