Case File
efta-02456062DOJ Data Set 11OtherEFTA02456062
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02456062
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
From:
Larry Visoski
Sent:
Wednesday, July 20, 2016 3:46 PM
To:
Je vacation; Rich Kahn
Subject:
Nautica update
Attachments:
IMG_6331.1PG; Untitled attachment 00136.txt; IMG_6332JPG; Untitled attachment
00139.txt; IMG_6333JPG; Untitled attachment 00142.txt; IMG_6330.1PG; Untitled
attachment 00145.txt; IMG_6329JPG; Untitled attachment 00148.txt
Update:
Side panel 90degree floor bracket to be epoxy this week, decor side panel in=tall by Friday, Zed does not need Boat to
fabricate rear bench seat, he will take measuremen=s and build a removable rear bench seat, for ease of access to oil
filter a=d lower Bilge pump maintenace.
I feel confident I should have boat in paint shop by Aug 1st„ -Aug 1st Boat in Paint shop -three weeks in Paint shop -out
of paint shop August 21st -Silvio installs new tubes 1 week, Ready to ship to LSJ by Sept 1st. ?
(Every estimate I've been given except Silvio out Tube guy, has been wrong). I hope I can deliver Boat to Tropical to
Ship by Sept 1.
1
EFTA_R1_01559079
EFTA02456062
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.