Skip to main content
Skip to content
Case File
efta-02473356DOJ Data Set 11Other

EFTA02473356

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02473356
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: jeffrey E. <[email protected]> Sent: Thursday, January 21, 2016 10:37 PM To: Richard Kahn Cc: ann rodriquez Subject: Re: Asphalt http://www.stwcorp.com/construct=on-materials/hot-warm-mix-asphalt/asphalt-pricing-index <http://www.stwcorp.com/construction-materials/h=t-warm-mix-asphalt/asphalt-pricing-index> On Thu, Jan 21, 2016 a= 4:00 PM, Richard Kahn < <mailto:[email protected]» wrot=: An=a and I spoke with Jeffers and wanted to review our findings: Original Bid 512,500 3" aggrega=e base 90,712 Less: savings * (9,0=0) Less: diesel fuel savings '• (3,600) Revised Total Cost=C2* 590,612 •" Attached is Swale bid of 42,062 for 32 swa=es which was not included above. I do not recall if you wanted to do=a smaller number of swales or pass for now. <=div> • estimated savings by sourcing cheaper trucks (250 or 300 vs 400=per jeffers) & using our heavy materials account for crushed stone (29=50 vs 30.00) jeffers fee (no 15% fee on stone or po=tion of trucks we source) =/span>-> Note that we may have additional costs for crusher run as Anna=has stated some of crusher stone has washed away and 3" does not r=main in all locations were it was laid -> it appears that we have already laid approximate=y 800 of 1300 tons *• jeffers explained th=t he uses 1.5 gallons of diesel fuel for each ton of asphalt paving <=iv> ->1500 tons x 1.5 gallo=s of diesel = 2,250 diesel gallons x 1.60 per gallon savings = 3,6004=1v> ••• Note this figure does not include barge costs (=e still have approximately 20,000 credit with boyson) =div> Jeffers figures he needs 4-5 days to complete crusher r=n and then 3-4 weeks for Asphalt He can begin February 1st and c=mplete no later than March 4th provided work is not halted for weather or =o work days per your requests Please advise EFTA_R1_01585711 EFTA02473356 =div>Thank you <=div> </=iv> On Aug 7, 2015, at 6:41 PM, Eason Jeffers < Good Day Da=hne, Plea=e see attached proposal for added aggregate base for LSJ paving. Sorry for=the delay. Kindest Regards, > wrote: <=iv style="margin:0in Din 0.0001ptfont-size:11ptfont-family:Calibri,sarp-seriflEason Jeffers USVI Gen=ral Manager Betteroads Asphalt LLC<=span> > <=> <Bettero=ds Proposal_ Added Aggregate Base.pdf> =/blockquote> Forwarded message ------_--- From: "Eason Jeffers" < Date: Aug 5, 2015 8:44=AM Subject: Betteroads Proposal Road Drainage Measures To: "Dap=ne Wallace" < <mailto Cc: "ann rodriquez" < >, "Rich Kahn" < Good Day Daphne, > > > > <=pan style="font-size:11ptfont-family:Calibri,sans-serif;color:rgb(31,73=125)">Please see attached the proposal for the drainage controls as shown =n the roadway plans. Those plans also show a 3 inch aggregate road base th=t was not a part of the original proposed scope. Do you want me to review =he base and give you some numbers for the scope? 2 EFTA_R1_01585712 EFTA02473357 <= class="MsoNormal"> Kindest Regards, Eason Jef=ers Betteroads Asphalt LLC <=span> </=iv> Richar= Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New Yor=, NY 10022 fax <a cell <tel please note The=information contained in this communication is confidential, may be att=rney-client privileged, may constitute inside information, and is inten=ed only for 3 EFTA_R1_01585713 EFTA02473358 the use of the addressee. It is the property of JEE U=authorized use, disclosure or copying of this communication or any part=thereof is strictly prohibited and may be unlawful. If you have receive= this communication in error, please notify us immediately by return=e-mail or by e-mail to [email protected] <mailto:[email protected]>, and destroy this communication and al= copies thereof, including all attachments. copyright -all rights reser=ed 4 EFTA_R1_01585714 EFTA02473359

Technical Artifacts (8)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2473356
Phone2473357
Phone2473358
Phone2473359
URLhttp://www.stwcorp.com/construct=on-materials/hot-warm-mix-asphalt/asphalt-pricing-index
URLhttp://www.stwcorp.com/construction-materials/h=t-warm-mix-asphalt/asphalt-pricing-index

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.