From:
Richard Kahn
Sent:
Saturday, September 26, 2015 8:23 PM
To:
Jeffrey Epstein
Subject:
FW: lighting system status
From: Alfred Buonanno
Date: Saturday, September 26, 2015 at 3:24 PM
To: Richard Kahn
Subject: RE: lighting system status
=meta name="Generator" content="Microsoft Word 15 (filtered medium)">
As stated in punch list the antique brass plates require custom sizin= which could not be determined until all keypads
were install. Keypad= could not be installed until wiring was identified and tested. All of these items take time and as
such were not completed until this week du= to the extensive delays. Note this is just for the antique brass pla=es.
Keypad engravings have been order and should arrive this week.
&nb=p;
From: Richard Kah=
Sent: Saturday, September 26, 2015 3:15 PM
To: Al B=onanno <
Subject: Re: lighting system status
<= class="MsoNormal">
Please ad=ise why plates are just being ordered now as we ordered them months ago. Th=nk you.
Sent from my iPhone
On Sep 26, 2015, at 2:39 PM, Al Buonanno
wrote:
Hello=Richard and Merwin,
As you know the lighting system is not completed. = While much of the lighting is fully functional there are a few
locations t=at are not. The troublesome locations are the dimmed/switched outlets= These locations had specialty
wiring that will need further work from the electricians. Please note that =e have been assisting them as much as
possible.
EFTA_R1_01606462
EFTA02487129
As you are both aware the =tarts and stops have added a lot of time to the project. I am confide=t that one
more strong push after Mr. Epstein departs on October the 5=h and we will be in good shape.
&n=sp;
Punch List:
-
&nb=p; Troubleshoot all outlets and correct RPM wiring=as required.
Double check all load identification for accura=e documentation for the as build system design.
=nbsp; Install all engravings on keypads. (most should=arrive this week)
Finalize additional customized keypads with spe=ialty functions. (these are keypads with house wide
commands)
- &nbs=;
Order and install all customized antique plates= (note: all keypads needed to be installed for
proper custom dimensio=s. Measurements were performed on Friday and plates will be ordered o= Monday. 2-3 week
lead time.
Pleas= contact me with any questions, comments, or concerns.
Regards,=/p>
Al
</=:p>
Alfred Buonanno
Clarity Custom =nc.
1792 West 11th Street
Brooklyn NY 11223
2
EFTA_R1_01606463
EFTA02487130
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2487129Phone
2487130Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.