Skip to main content
Skip to content
Case File
efta-02488882DOJ Data Set 11Other

EFTA02488882

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02488882
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace < Sent: Wednesday, September 9, 2015 4:13 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Boyson schedule - September 9, 2015 Greetings Sir, Anna and I just received=a phone call from Boyson. The parts they are waiting on to repair th=ir second engine will not be available until next week. As a result, they can only transport lighter loads. Anna=has prioritized getting the trash, gravel, sand, topsoil and waste oil rem=val completed as soon as possible. Boyson cannot =arry the weight of the crusher run volume that is needed to complete the R=ad project, nor the asphalt, until both engines are back online. To make matters worse, they are scheduled to put the =arge into drydock beginning 9/18 for approximately 10 days. =/div> We will concentrate on maximizing the crucial loads needed to ke=p the present projects going and prepare for your return, and next week si= with Mr. Jeffers and Big Sam to create a new Road Schedule for your revie=. Respectfully, Daphne 1 EFTA_R1_01609128 EFTA02488882

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2488882

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.