Skip to main content
Skip to content
Case File
efta-02492143DOJ Data Set 11Other

EFTA02492143

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02492143
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Leighton Allenby < Sent: Wednesday, August 12, 2015 3:15 AM To: Jeffrey Epstein Cc: NYC - Richard Kahn; Anna Rodriquez; Daphne Wallace; Leighton Allenby Subject: CZM meeting today Hello Mr. Epstein, Today Anna, Danny Vicars and I met =ith David Rosa from CZM and Kevin from The Jaredian Design Group to discus=: 1. Layout of the proposed maintenance and workshop =uilding project 2. Two roofs for the RO Plant and Generator building.=br> The meeting went well. Concerns & comments bro=ght up by David Rosa: 1. New height of RO and Generator roo= from across the waters. I replied that the pitch of the roof was aestheti=ally pleasing and roof color chosen by you is soft and blends into the ski=s. He quickly agreed. 2. He had no concerns with proposed building an= 80 foot layout and placement of building. We walked the proposed layout t=at Danny Vicars laid out with orange markers. 3. David had a co=plaint from someone that we discussed. Complaint was that we were creating=stone buffers preventing boaters from coming ashore to the beaches. I assu=ed him this wasn't happening since I started and that there were natur=l reefs that prevented the boaters from coming ashore. He agreed an said t=at he had to ask as there was a complaint. (Most likely someone saw machin=s removing rocks from the shore for the waterfall. We need to be careful.)=/Ii> 4. David wanted to inspect grading of roads. We showed him one of the=roads going from maintenance building to tennis court and he was pleased.<=li> 5. We discussed putting in drainage swales after the asphalt and minim=zing damage and he agreed that we would have better control of the water r=ther than guessing where the drainage swales should be. David wants protec=ive erosion control at each new drainage swale per permitt. I agreed. =Ii>We discussed the Coastal Zone Management Act (CZMA) and why it is impor=ant for us to observe this Act. http://www.coralreetgov/grants/noaa/USV=-CZMFactsheet-Jun03.pdf <http://www.coralreetgov/grants=noaa/USVI- CZMFactsheet-Jun03.pdf> 6. David and I discussed my qualification=, previous projects on coastal zones and my working with the Town of Falmo=th conservation Department on various projects on Cape Cod. David is from =rlington, VA 7. Kevin from Jaedian mentioned that the working dra=ings should be completed by the end of September. They had to have plans m=dified for proper venting for carpenters shop and fertilizer/chemical stor=ge. 8. Daphne gave me a set of drawings that I will review. 9. I asked David if he will sign off on project and David commented that =ost likely after he reviews the plans once more. Best, =div>Leighton Leigh=on Allenby EFTA_R1_01614675 EFTA02492143 845.702.1844 2 EFTA_R1_01614676 EFTA02492144

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2492143
Phone2492144
Phone845.702.1844
URLhttp://www.coralreetgov/grants/noaa/USV=-CZMFactsheet-Jun03.pdf
URLhttp://www.coralreetgov/grants=noaa/USVI

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.