Skip to main content
Skip to content
Case File
efta-02492881DOJ Data Set 11Other

EFTA02492881

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02492881
Pages
5
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: jeffrey E. <[email protected]> Sent: Monday, August 3, 2015 1:21 PM To: LAllenby; Richard Kahn Subject: Re: LS1 Plate Work that is only the problem„ is there a pr=posal for solution, ? please try to add action steps to =ssues, telling me only that there is a problem is time c=nsumig wrote: The hul= is compromised - rusted through in areas on his map. Leight=n Allenby Director of Pro erties On Aug 3, 2015, at 9:09 AM, Richard K=hn wrote: Bosco email off point. Disappointed with bosco on every step of this=barge overhaul and concerned he is not best person to care for and operate=moving forward. To many surprises and then an excuse and disclaimer each t=me. As I am sure you will say we have no choice I wanted to confirm we sha=l proceed with latest Change order for 47,390 Ple=se advise Thank you Sent from my iPhone ar>Begin forwarded message: =rom: Leighton Allenby Date: July 31, 2015 at 3:4=:39 PM EDT To: Richard Kah FYI EFTA_R1_01615862 EFTA02492881 =eighton Allenby Director of Properties Forwarded messa e F=om: Bill Hague Date: Fri, Jul 31, 2015 at 3:09 PM Understood. Gabe, one of his hands an= I went over all the remaining cavities/compartments and found only a half=dozen minor and repairable spots in the hull plating. The bulkheads show s=aggered severe pits/holes that also can be dealt with reasonably. 4>=AO I agree about the surveyor. Also, your email ended up in my ju=k mail. I have added you to my contacts to avoid that in the future. I reg=et the delay in responding. For your information, I contac=ed a Navy colleague and asked for the present contractors information conc=rning construction of the latest Navy LCM8's I did thi= to quantify your question about replacement costs of the Barge. I was Ref=red to Kvichak Marine in Seattle. Art Parker there said my gues= of 2 million is likely low. A build that heavy is likely a 3 to 4 million=dollar job in his opinion. His company is bidding on the Caiman design 60 =nd 70 for the USN. Good Day Bo=coe From: Date: ri, u Subje=t: Re: LSJ Plate Work To: [email protected] <mailto:[email protected]> ; Hello Ann= and Boscoe, Can you please go over every inch of Big D and dete=mine when the bleeding to Mr. Epstein is going to stop. I know I=am coming in late in the last quarter but there should have been a survey =ecommended so this additional work outside of the original=budget did't occur and a 10 to 15% mic added for unforeseen. I see no =ther option but to 2 EFTA_R1_01615863 EFTA02492882 recommend to Mr. Epstein and Richard that thi= work be completed. Please thank Gabriel for the savings on the =ay days Mr. Epstein and R=chard, I this additional $47,390 =xpenditure approved? adiv> Best, Leighton <=div> Good Morning Anna- Upon reviewing and inspecting the in=ide of the compartments, forward of the engine room, we have come up with = quotation for repairing all the "wasted" plate. Appro=imately 160 square feet of plate has to be cut out and replaced. The squar= footage equals 848LBS x $45 per pound the total would be $38,16= (This price includes all labor and material). We will also have to remove=both keel coolers due to their location with the plate that has =o be cut out. We will also have to fabricate two new boxes in which they s=t and then remount these boxes once the new plate is welde= into place. The price for this is $5850 includes labor and material. Two =ater tight bulkheads are also compromised and several area= will need to be "cropped" out and replaced. Labor and materials=is $3380. We will also "plug weld" 12 more addit=onal areas that have deteriorated and need to be addressed. These two comp=rtments have been inspected by both Gabriel, the project m=nager, and Bosco. In addition, the emergency bilge pump system needs =o be renewed and it is our recommendation to have Bos=o undertake this job. Please note that we have not charged any additional =ay days and will continue not to. The areas that need to b= cut out and replaced are very confined and difficult to work in.40=A0With the savings on lay days it is over $3500 so we=will not be able to move on our final quotation. I have also attached a fe= pictures Total for =abor and material $47,390 Leighton Allenby Director of Pro=erties On Fri, Jul 31, 2015 at 11:43 AM, rote: Ann R. 3 EFTA_R1_01615864 EFTA02492883 Begi= forwarded message: Date: Jul 31, 2015 at 11:19:19 AM AST MOM= Good Morning Anna- Upon revi=wing and inspecting the inside of the compartments, forward of the engine =oom, we have come up with a quotation for repairing all the "wasted&q=ot; plate. Approximately 160 square feet of plate has to be cut out and re=laced. The square footage equals 848LBS x $45 per pound the total would be=$38,160 (This price includes all labor and material). We will also have to=remove both keel coolers due to their location with the plate that has to =e cut out. We will also have to fabricate two new boxes in which they sit =nd then remount these boxes once the new plate is welded into place. The p=ice for this is $5850 includes labor and material. Two water tight bulkhea=s are also compromised and several areas will need to be "cropped&quo=; out and replaced. Labor and materials is $3380. We will also "plug =eld" 12 more additional areas that have deteriorated and need to be a=dressed. These two compartments have been inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge pump syste= needs to be renewed and it is our recommendation to have Bosco under=ake this job. Please note that we have not charged any additional lay days=and will continue not to. The areas that need to be cut out and replaced a=e very confined and difficult to work in. With the savings on la= days it is over $3500 so we will not be able to move on our final qu=tation. I have also attached a few pictures Total for labor and material = $47,390 <resized8.jpg><resized10.j=g><resized12.jpg> ablockquote> =blockquote> 4 EFTA_R1_01615865 EFTA02492884 <resizedl2.jpg> &=t;resized10.jpg> <=span> =C2* please note The information co=tained in this communication is confidential, may be attorney-client pr=vileged, may constitute inside information, and is intended only for JEE Unauthorized use= disclosure or copying of this communication or any part thereof is str=ctly prohibited and may be unlawful. If you have received this commu=ication in error, please notify us immediately by return e-mail or by e=mail to [email protected] <mailto:[email protected]> , and destroy this communication and all copies thereo=, including all attachments. copyright -all rights reserved </=iv> 5 EFTA_R1_01615866 EFTA02492885

Technical Artifacts (7)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2492881
Phone2492882
Phone2492883
Phone2492884
Phone2492885

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.