Skip to main content
Skip to content
Case File
efta-02583434DOJ Data Set 11Other

EFTA02583434

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02583434
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet < Sent: Wednesday, May 7, 2014 10:52 PM To: [email protected] Cc: Subject: GIV update Jeffrey, Flight time: TEB - SIT is 3+13min (+34kt tailwind). Test flight on GIV today went well, -I was pleased with Door seal, inflates fully and db lever i= much lower in fwd cockpit area with sound proof material on cabin do=r. -charging dock for stereo remote looks amazing,. / Down wash lights ab=ve credenza have been replaced,./ dish, salt and pepper and several drawer= in galley have dividers installed. -it was tough to find smooth air during todays flight, I brought Julia=, Mx shop manager, most of flight felt smooth, brief moments our light buf=et was present, so I was able to demonstrate to Julian our concerns,. only issue during flight was cockpit windshield heat regu=ator failed, part will arrive 9am tomorrow and should be completed by noon= I'm planning to reposition to Teterboro by 3pm for our departure=/div> let me know if there is a chance you will depart earlier than 6pm? thank you, Larry 1 EFTA_R1_01761654 EFTA02583434

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2583434

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.