Skip to main content
Skip to content
Case File
efta-02605357DOJ Data Set 11Other

EFTA02605357

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02605357
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Kyle reavis Sent: Thursday, August 16, 2018 12:48 PM To: jeffrey E. Cc: Richard Kahn; BMG Subject: Re: Mr Epstein, Yes sir I did, that w=s my estimate with the side concrete road and buildings similar to LSI. Ok=will send over those calculations. Very Respectfully,</=iv> Kyle Reavis <=r> On Thu, Aug 16, 2018 at 5:44 AM, jeffrey E. <=pan dir="ltr"><[email protected] <mailto:[email protected]> > wrote: i belive you told me 200 yards at the table.=. lets make it 90 diameter by 4 inches. thck. 40=A0 On Thu, Aug 16, 2018 at 8:29 AM, Kyle =eavis Mr Epstein, mailto wrote: Helicopter Pa= will be 97 Yards (100' x 4"). That would be on a level gra=e and we can get back-fill from GSJ and compact ourselves. I think w= should look into pour breaks to prevent EB from getting overwhelmed tryin= to pour 100 yards in one day. If their are any issues with Barges o= pour-day we will have non-structural pour breaks that will result in majo= cracking. Maybe do (3) 34 yard pours on separate days. To joi= the separate sections you just need 2' pieces of #4 rebar core drille= and epoxied into the joints. That will produce a clean structural joint.<=div> Very Respectfully, Kyle R=avis =n Thu, Aug 16, 2018 at 5:14 AM, jeffrey E. <[email protected]</=» wrote: kyl= please detail for me your concrete calculation for heli area =hx. , I want the sundial completed by cues, Jules shou=d be wrking pebble beach rip rap. . , as i wil be with new arc=tects on the eve of 25th dock pour MUST be done by them. =.l want a delivery date on the rebuiilt generator parts , e>=A0 having no backup is a problem.. lets look at a=ding a brand new 150k generator as the 2 big ones are oversized. 4)=A0 I want a schedule of the bathroom complettions. for the cab=nas. thx. EFTA_R1_01795767 EFTA02605357 4>=A0 please note The information contained in this commu=ication is confidential, may be attorney-client privileged, may cons=itute inside information, and is intended only for the use of the addre=see. It is the property of JEE Unauthorized use, disclosure or copyi=g of this communication or any part thereof is strictly prohibited a=d may be unlawful. If you have received this communication in error, pl=ase notify us immediately by return e-mail or by e-mail to [email protected], a=d destroy this communication and all copies thereof, including all a=tachments. copyright -all rights reserved please note The in=ormation contained in this communication is confidential, may be attorn=y-client privileged, may constitute inside information, and is intended=only for the use of the addressee. It is the property of JEE Unau=horized use, disclosure or copying of this communication or any part th=reof is strictly prohibited and may be unlawful. If you have received t=is communication in error, please notify us immediately by return e-=ail or by e-mail to [email protected] <mailto:[email protected]> , and destroy this communication and all c=pies thereof, including all attachments. copyright -all rights reserved=br> 2 EFTA_R1_01795768 EFTA02605358

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2605357
Phone2605358

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.