Skip to main content
Skip to content
Case File
efta-02608983DOJ Data Set 11Other

EFTA02608983

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02608983
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Saturday, December 22, 2018 1:14 PM To: Jeffrey Epstein Subject: Fwd: Status Update for LSJ Pump Station and GSJ Containerized plant HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York NY 10022 =egin forwarded message: From: < Date: December 22, 2018=at 8:09:40 AM EST To: "'brice gordon'" Cc: "michael lid=en" Subject: Status Update for LSJ Pump Station an= GSJ Containerized plant —R=chard Kahn"' Brice: As of close of business yesterday, here is were everyth=ng stands on the two ongoing projects: LSJ Pump Station<=b> 1. The basket strainers arrived yesterday, ther= were the last items we were waiting on to finalize the system fabrication.=o:p> 2. The equipment is scheduled to ship to Tropical on Janua=y 3rd. We will coordinate shipping with Daphne once we hav= made final arrangements. 3. Assuming the equipment arrive= late the following week, we would propose coming to St. Thomas the week of=January 14th to install the pump station equipment, install the n=w seal for the cartridge filter housing, replace the pH probes and associat=d wiring and update the controls for the new configuration. I underst=nd the fiber optic cable has been shipped from AVL. When do you antic=pate having it installed so we can finalize the new controls? This wi=l drive the equipment installation schedule. EFTA_R1_01802526 EFTA02608983 GSJ 25K Plant 1. The container will be completed late=next week and ship to us on January 3rd or 4th. =/o:p> 2. Installation of the equipment will take approximately 3 week= which puts shipment sometime during the week of January 28th with installa=ion probably the week of 11 February. 3. On your end, have=you decided on the routing of the feedwater and brine disposal pipelines?&n=sp; There will also need to be 208 three phase power at the seawater pumpin= station as well as one control conduit from the pump station to the RO pla=t. There will also need to be control conduits from the two cisterns t= the RO plant as well as the interconnecting piping (1.5 to 2" diam=ter is recommended). =/o:p> Our facility is closed next week through Ja=uary 2nd. If you need any technical support, I am availabl=. Hope you and the staff have a great holiday season and I look forwa=d to working with you to complete the water upgrades on both of your island=. Dean Bedford PE Gemin= Seawater Systems LLC 8916 SW 44<=up>th Lane 2 EFTA_R1_01802527 EFTA02608984

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2608983
Phone2608984

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.