Skip to main content
Skip to content
Case File
efta-02609023DOJ Data Set 11Other

EFTA02609023

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02609023
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: michael glidden <a Sent: Friday, December 28, 2018 4:23 PM To: Cc: brice gordon; Richard Kahn; Kyle reavis; Subject: Re: LSJ Cabana 3 Good =ay. With regard to the RO trench we will be cutting the =oncrete road parallel to an existing seam approximately 75' =own from the Mr Wind intersection and will patch with the same style =inish now in place on all three sides of the Mr Wind intersection if =hat is acceptable. On Dec 27, 2018, at 5:16 PM, J =lt;[email protected] <mailto:[email protected]» wrote: tiki kitchen flagpole =itchen. grotto . much more a priority that this shade =ouse. . schedule for engineering =oors? r0 -trench , do we have to break the concrete road = to get the lines across. ? On =hu, Dec 27, 2018 at 4:10 PM brice gordon wrote: Update By Friday afternoon =abana's 1 and 4 will be ready At this time both Cabana's 2 and 3 have plumbing =ssues, fortunately Cabana 2 did not sustain damage But a bigger issue was discovered this afternoon, it =ppears there is a leak in the supply line from the manifold under =abana 1 to Cabana's 2 and 3. Please =ote this line is original to build. Regarding the =uestion of responsibility For the hot water =ine -1PK Yes, this was the first time =abana's 2 and 3 sustain constant water pressure to =athrooms L51 plumbed vanities and hot water =eaters . Comments Find certified plumber !!! If possible =un a camera thru lines ?? Order wall tile for =howers ASAP. Schedule AHF again for floor =epairs in cabana 3 We need to be absolutely =nbsp;confident in plumber and tile for master bath Reno before moving =orward Brice EFTA_R1_01802643 EFTA02609023 Sent from my iPhone On Dec 27, 2018, at 3:57 PM, Richard Kahn wrote: Brice / Kyle Thanks for update. Who's is responsible for this hot =ater line? Was jay involved? Our crew? Was this the first =ime water was tested? Please advise. Thank you. Richard =ahn HBRK =ssociates Inc. 575 =exington Avenue, 4th Floor New York, NY 10022 On Dec 27, 2018, at 6:50 AM, brice gordon c wrote: Sorry for this news !! A hot water line to the thermostatic shower =alve in Cabana 3 blew apart last night The wall between the bathroom and shower that houses the =alve filled with water, which resulted in water seeping into the =athroom and bedroom The floors in both areas will need to be =eplaced, along with the Bedroom Rug and most probably the bathroom =abinetry All other furnishing have been removed and =laced in Cabana 4 Repair to line is in progress I will forward a update at 4.30 tonight =/span> Brice 2 EFTA_R1_01802644 EFTA02609024 <IMG_3231.jpg> <IMG_3232.jpg> <IMG_3233.jpg> <IMG_3239,jpg> Sent from my =Phone please note The information contained in this =ommunication is confidential, may be attorney-client =rivileged, may constitute inside information, and is =ntended only for the use of the addressee. It is the =roperty of JEE Unauthorized use, disclosure =r copying of this communication or any part thereof is =trictly prohibited and may be unlawful. If you have =eceived this communication in error, please notify us =mmediately by return e-mail or by e-mail to [email protected], and destroy this =ommunication and all copies thereof, including all =ttachments. copyright -all rights reserved 3 EFTA_R1_01802645 EFTA02609025

Technical Artifacts (4)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2609023
Phone2609024
Phone2609025

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.