Skip to main content
Skip to content
Case File
efta-02612275DOJ Data Set 11Other

EFTA02612275

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02612275
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: 1 <[email protected]> Sent: Monday, December 3, 2018 4:48 PM To: Richard Kahn; Kyle reavis Subject: Re: punch list for work in bathrooms cabana's 1,2,3,&4 efis? kitchen cabanas mike c=ttage. tile main compund NURSERY. gyn doors?Q=A0 windowS? On Mo=, Dec 3, 2018 at 11:44 AM Richard Kahn wrote: Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th =loor New York, NY 10022 Begin forwarded message: From: Jay Knoepfel <[email protected]> Subject: punch list for work in bathrooms cabana's 1,2,3,&4 Date: D=cember 3, 2018 at 11:41:39 AM EST To: Richard Kahn <[email protected] <mailto:[email protected]»,=brice gordon <[email protected] <mailto:[email protected]», Kyle reavis <[email protected] <mailto:kyleusvi=gmail.com» Cabana #1 1. grout line touch up on perime=er of floor tile 2. Adjust window to be parallel with tile walls and fabricate trim t= finish tile surrounding window and paint 3. EFTA_R1_01808285 EFTA02612275 4. 5. 6. 7. 8. Glass door install extend jamb of entrance door and trim=out glass door area all grout sealed and tile cleaned finish tile install at door install shower trim<=div> decide and in=tall threshold at glass shower door round shelf and bench edge Cabana #2 1. touch up floor=grout in two locations 2. replace one floor tile under window 3. round shelf edge 4. 5. 6. 7. trim out window and paint trim 8. <=iv style="margin-top:Opx;margin-bottom:Opx">tile threshold with selected=material extend door jamb and trim =ut to finish glass door install install glass door raise floor drain Cabana #3 1. replace wall tile marked with blue tap= 2. round over =ile edges40=A0 3. to=e up floor grout where grout line exceeds common dimension 4. <=iv style="margin-top:Opx;margin-bottom:Opx">paint ceiling and drill hole= for lights 5. 6. 7. =rep door opening and plaster to create finished look install glass door final cleaning of tile=and sealing of grout Cabana =4 1. replace tile edge at shelf configure door o=ening for glass door 2 EFTA_R1_01808286 EFTA02612276 2. remove and replace one floor tile marked with blue tape =l i> round over edges <=pan class="m_-8654375518264686230Apple-converted-space"> 3. 4. 5. notify us immediately by return e-mai= or by e-mail to conversation-id 319918 date-last-viewed 0 date-received 1543855709 flags 8590195713 remote-id 878081 <mailto:[email protected]> raise floor dra=n install gl=ss door clea= tile and seal grout joints =br> please note The infor=ation contained in this communication is confidential, may be attorney-=lient privileged, may constitute inside information, and is intended on=y for the use of the addressee. It is the property of JEE Unautho=ized use, disclosure or copying of this communication or any part there=f is strictly prohibited and may be unlawful. If you have received this=br>communication in error, please 3 EFTA_R1_01808287 EFTA02612277

Technical Artifacts (10)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2612275
Phone2612276
Phone2612277
Phone3855709

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.