Skip to main content
Skip to content
Case File
efta-02612316DOJ Data Set 11Other

EFTA02612316

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02612316
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Monday, December 3, 2018 4:45 PM To: Jeffrey Epstein Subject: Fwd: punch list for work in bathrooms cabana's 1,2,3,&4 Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 Begin forwarded message: From: =/b>Jay Knoepfel Subject: =/b>punch list for =ork in bathrooms cabana's 1,2,3,&4 Date: =/b>December 3, 2018 at 11:41:39 AM =ST To. = b>Richard Kahn Cabana #1 brice gordon 1. grout line touch up on perimeter of =Ioor tile 2. 3. 4. 5. 6. 7. Kyle reavis Adjust window to be parallel with tile =ails and fabricate trim to finish tile surrounding window and =aint Glass door install extend jamb of entrance door and trim out glass door =rea all grout sealed and tile =leaned finish tile install at =oor EFTA_R1_01808392 EFTA02612316 8. 9. install shower trim decide and install threshold at glass shower =oor round shelf and bench =dge Cabana #2 1. touch up floor =rout in two locations 2. 3. 4. 5. 6. 7. 8. replace one floor tile under =indow round shelf edge extend door jamb and trim out to finish glass door =nstall install glass door raise floor drain trim out =indow and paint trim tile threshold with selected =aterial Cabana #3 1. replace wall tile marked with blue =ape 2. 3. 4. 5. 6. 7. round over tile edges tune up floor grout where grout line exceeds common =imension paint ceiling and drill holes for rights Prep door opening and plaster to create =inished look install glass door final cleaning of tile and sealing of =rout Cabana #4 1. replace tile =dge at shelf configure door opening for glass door 2. 3. remove and replace one floor tile marked with blue =ape 2 EFTA_R1_01808393 EFTA02612317 4. 5. 6. round over edges raise floor drain install glass =oor clean tile and seal grout =oints 3 EFTA_R1_01808394 EFTA02612318

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2612316
Phone2612317
Phone2612318

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.