Skip to main content
Skip to content
Case File
efta-02623997DOJ Data Set 11Other

EFTA02623997

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02623997
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: jeffrey E. <[email protected]> Sent: Saturday, September 8, 2018 11:26 AM To: Richard Kahn Subject: Re: GS) Cottage cistern ok. im not sure what brice is up=to? chris cottage nothing done?! kicht=n months delayed. tiki kitchen just ordered. =. gym doors , months delayed. lirbrayr hardware same.40=A0 . geebeerators R0 . solar.. internet. .=C24 cables. dock. quanset hut. marchinery , . ? =C240 something odd. to say the lelast. On Sat, Sep 8, 2018 at 2:55 AM, Richard K=hn < > wrote: Kyle wants Jay to=start on Monday yet both his bid and EB's bid make no sense. =div>Both bids predominately labor only and majority of materials and some =rades LSJ to procure. Kyle explained that this is how Brice requ=sted bids be made but makes very little sense that vendors are not doing j=b start to finish.. LS) supplying materials will inevitably lead=to things going wrong or improper sizing and gives us no leverage if somet=ing goes wrong... EB Bid - t=tal cost 85,500 (bid states that this number is estimated and not fixed at=85,500) demolition (kyle said this would =e self performed as you said bids were to high) material cost - =ile throughout is excluded living room as you discussed not incl=ded painting - unclear and probably not included as not mentione= windows and doors - supplied by owner makes no mentio= of electrician and plumber cistern included <=r> Jay Bids 1 Cistern - 35,000 (appears material and labor included and =lso overpriced by 25%) 2 GS1 cottage - 76,842.=7 demo flooring, windows and kitchen included=/div> material cost - tile throughout is excluded livin= room as you discussed not included painting - not included plumbing - not included electrician - not included windows and doors - supplied by owner kitchen (price to b= determined) EFTA_R1_01833888 EFTA02623997 outdoor shower - not included state= all materials to be purchased by L51 <=iv> </=iv> Please advise if these bids should be reworked or if you would lik= Jay to begin Monday as Kyle arranged.. Richard Kahn HBRK Associates Inc. 575 Lexington Avenu=, 4th Floor New York NY 10022 fax Subject: <=pan style="font-family:-webkit-system-font,Helvetica Neue,Helvetica,sans=serif">Bid Package 1- Bid Review Date: August 24, 2018 at 11:56:2= AM EDT To: 4=pan>"jeffrey E." <[email protected] <mailtoleevacation@gmai=.com» <=a», Daphne Wallace Good Morning Mr Epstein, Please see the breakdo=n of bids received for "Bid Package -1". Cust=m Builders informed me they are unable to bid on current work and are back=logged 1 year, their owner called me. We will continue to invite the= to bid on our work in case this changes. T=ki House Kitchen Expert Builders - Needed more time on t=is, I am working with them to get get it wrapped up JPK - Bi= Received Flag Pole Pool =**Per our conversation last week this design will be changing, so bids wil= be adjusted accordingly*** Expert Builders - Bid Received </=iv> JPK - Bid Received Main House=Pool Area - Expert Builders - Bid Received 2 EFTA_R1_01833889 EFTA02623998 Mikes Cottageadiv> Expert Builders - Bid Received JPK - Bid Received =div> Master Bedroom Terrace Expert B=ilders - Bid Received JPK - Needs more time on this, resent dime=sions to Jay Monday Pops Garden "Shade=House" Expert Builders - Bid Received JPK=- Not bidding Self Preform L.S.I - Research in progress on possibl= solutions North Terrace (GSM) Expert Builders - No bid JPK - Bid Received The things we can include in Bid Package 2- Change of Scope- Extend Tiki House Concrete front (add =nto tiki kitchen price) Flag Pole Pool Shelter design changes =/ul> New Projects - Fisherman House =li>Movie Theater RO / Generator Bunker - GSJ Engineering B=ilding Staff Lunch Area Emergency Room Renovation Please let me know what else you would like to see in bid package two= I have attached the bids to this email, as the final two revisions =ome in I will forward over the updated bids. The JPK Mike Cottage bi= along with the Expert Builders North Terrace bids will be sent in a separ=te email. Thank you. Very Respectfully, Kyle W Reavis 3 EFTA_R1_01833890 EFTA02623999 </=iv> <=lockquote type="cite"> conversation-id 329209 date-last-viewed 0 date-received 1536405982 flags 8590195713 remote-id 851771 4 EFTA_R1_01833891 EFTA02624000

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2623997
Phone2623998
Phone2623999
Phone2624000
Phone6405982

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.