From:
Richard Kahn MIIIIIMM
Sent:
Friday, September 7, 2018 6:30 PM
To:
Jeffrey E.
Subject:
Prosolar
internet connectivity is no explanation for why system fails =onday / works tuesday and fails wednesday..
next few =mails are brians emails he sent to me..
please =dvise
thanks
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
Begin forwarded message:
From: =/b>Brian Prosolar
Subject: =/b>Re: Friday June =9th
Date: r/b>September 7, 2018 at 2:26:31 PM =DT
To: =/b>Richard Kahn <
Cc: Brice Gordon al>,
Dan Prosolar
>, Marcelo
>, Brad Spernak
michael glidden
Afternoon Richard,
As you may be aware the =nternet connectivity has been off on GSJ for a couple weeks. This has =revented
continual analysis but are working with Brice and Micheal in a =eactive way as best we can. I've asked Dan to reach out
to =rice to see if the operation of the system is back to the successful =onfiguration levels seen over the last few months.
Dan relayed that he =as not heard from him in a couple days but I indicated that he needs to =ontinually inquire.
Relatedly, I've rent you a few emails recently with no response. Just want to ensure you =re receiving them.
Regards,
EFTA_R1_01835676
EFTA02624818
Brian =alden
ProSolar America, Ilc
Director of O erations
On Sep 7, 2018, at =2:54 PM, Richard Kahn <
wrote:
is solar back up?
if so =lease advise what issues were..
thank =ou
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
On Sep 5, 2018, at 7:22 AM, brice gordon
> wrote:
.:1
Morning
Same =ssue no power again
Sunny islands =ead
Sunny boys flashing =ellow
Please as to what you would like to =o
Brice
Sent from my iPhone
On Sep 4, 2018, at 12:11 PM, Dan Prosolar
wrote:
good morning all! hope =veryone had a great weekend.. minus GSJ with no power.
i feel very good about my visit today. i was =eceiving error codes pertaining to an OVER-
VOLTAGE situation. this is =reat news considering we have been fighting the opposite problem since =he hurricanes. i
have had the system set to perform at the absolute =eek voltage it can to avoid loosing power. this maximum voltage
2
EFTA_R1_01835677
EFTA02624819
setting =eeters the system on the edge of its capabilities. as we see now it has =btained and exceeded its voltage setting
limits on the sunny islands. =here is no damage done, only the inconvenience of it shutting down to =rotect itself. Today
i throttled back the target voltage by 1v. this =hould prevent more shutdowns due to over voltage. i think we have got
=his system dialed in.
All the best, Dan Chrisman
n Mon, Sep 3, 2018 at 6:57 PM, brice gordon
> =rote:
Good Evening
The solar system is down on GSJ
No power =unny islands
Sunny boys seem to be in =farm
Cluster box no power
Please advise as to Dans schedule
Regards =rice
Sent from my =Phone
On Jul 11, =018, at 2:10 PM, Marcelo
wrote:
Good =fternoon Richard,
Please =ee the below email containing Dan's summary of what actions he
=erformed on his last visit to GSJ.
Regards, =/span>
Marcelo =erez
Project Manager
<401A3348188040D088A29AA3089A8844[4315691.jpg>
www.prosolaramerica.com
3
EFTA_R1_01835678
EFTA02624820
From: Dan Prosolar <mailto:
Sent: =/b>Wednesday,
To: =/b>Marcelo <mailt
Subject: Re: FW: =riday June 29th
Good =fternoon all, sorry for the delay my email had an issue and became
=nlinked so I wasn't receiving these untill now. Regarding GSJ =ere is what's been achieved.
-all Aquion battery =odules are wired to bypass the corroded, water damaged
circuit boards =hat could interfere with charging profiles.
-sunny islands (6) =ere downgraded to firmware version 6.0.02. This was done
to allow a =roader, linear charge profile to be set
-charging parameters =re now based on voltage set points rather than state of
charge =alculations done internally with different references.
-max charge voltage =as been set to 58.5V and the batteries will not stop
charging untill a =oltage 1.5V over the set limit is a achieved for 15 seconds. This gives =hem the ability to serpase the
previous charge voltage of 56.7V
- the main issue =hat caused so much down time before was as follows. A target
charge =oltage that matched the Aquion batteries was not possible with the =revious profile. Compiled on that was
faulty Aquion circuit boards =reventing the batteries from properly charging to a suitable voltage. =quion, as we know, is
no more, so it's impossible to obtain =eplacement parts. Aquions bms never met the as advertised performance =nd
created more issues than we could have imagined. In short, the =hanged I made allowed for a higher, more suitable
battery voltage to be =chieved and prevents the premature shut down we saw before.
Again, sorry for the =elay, hope all is well
Thanks
Dan Chrisman
4
EFTA_R1_01835679
EFTA02624821
Senior Technical =pecialist
Prosolar=LLC
From: Richard Kahn <mailto:
Sent: =/b>Wednesday, July 11, 2018 10:30 AM
To: =/b>Brian Prosolar <mailto
<mailto
wrote:
=1110.1.0lidden
<mailto
>; Brice Gordon
Subject: Re: Friday June 29th
can we do thursday morning or anytime friday
when can expect =an's summary?
please =dvise
thank =ou
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jul =0, 2018, at 2:18 PM, Brian Prosolar
Afternoon =ichard,
Brad is traveling to =an Francisco for a conference and I'm boarding a plane to
STX. ='ve asked Dan to write a synopsis of his efforts and we have =een monitoring for proper function. I'll relay this
tomorrow =nce he's finished.
5
EFTA_R1_01835680
EFTA02624822
We're still =valuating but all is functioning as intended for the moment.
Additional =onitoring and confirmation are needed since the weather over the last =eek has been extremely cloudy.
Would it be possible =o have our call on Thurs. afternoon at 3 EST?
Regards,
Brian Walden
ProSolar America, Ilc
Director of =perations
On Jul 10, 2018, at 1:50 PM, Richard Kahn =lt;r
> wrote:
i have =ot yet heard back from anyone on a time to speak
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jul =, 2018, at 5:36 PM, Richard Kahn cal
l wrote:
can we please =rrange a call for tomorrow to review current status of GSJ solar
thank you
6
EFTA_R1_01835681
EFTA02624823
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
On Jun =9, 2018, at 1:36 PM, Brian Prosolar
wrote:
Afternoon =ich,
I =elieve the normal boat arrival time is 8 or 8:30 a.m. in Redhook. =nbsp;
Dan =ill be there.
Regards,
Brian Walden
ProSolar America, =lc
Director of =perations
On Jun 29, 2018, at 1:20 PM, Richard Kahn =lt
> wrote:
please =onfirm what time you will be arriving at GSJ on Monday
thank you
7
EFTA_R1_01835682
EFTA02624824
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jun =8, 2018, at 1:42 PM, Brian Prosolar
wrote:
Afternoon Richard,
We're still =rying to have a final discussion with Stefan as well as track down
=ultiple 128MB or smaller SD cards to reboot the Sunnyboy inverters. =e're moving as quickly as we can in order to
execute the =onversion plan but it looks like we have to push to Monday. Dan has =hown Michael how to get the system
back up and operating in the event =f it dropping offline and that is working for the interim.
Regards,
Brian Walden
On Jun 28, 2018, at 11:08 AM, Richard Kahn =
wrote:
please =onfirm that you will be at GSJ tomorrow to work on the Solar
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
8
EFTA_R1_01835683
EFTA02624825
On Jun =5, 2018, at 7:27 PM, Brian Prosolar
wrote:
I want to ensure we have the PCB bypass discussion with the =ngineers prior to
the visit and will try to expedite.
Brian Walden
EE RE Consultant
On Jun 25, 2018, at 5:05 PM, Richard Kahn =
> wrote:
we are =ithout any solar currently
can you please try to have dan come sooner
thank you
Richard =ahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jun =5, 2018, at 4:31 PM, Brian Prosolar <
wrote:
9
EFTA_R1_01835684
EFTA02624826
Afternoon =ichard,
I have Dan on the =chedule to head to GSJ on Friday.
Regards,
Brian Walden
ProSolar America, =lc
Dir. =f Operations
On Jun 25, 2018, at 3:30 PM, Richard Kahn =lt
cri
> wrote:
can you please advise when your men can come =n and fix our solar system
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
10
EFTA_R1_01835685
EFTA02624827
<401A334B1BB040DOBBA29AA3089AB844(431569Ljpg>
<=div>
Prosolar Systems
Let's Get Social
Prosolar Systems
Let's Get Social
11
EFTA_R1_01835686
EFTA02624828
Technical Artifacts (14)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
www.prosolaramerica.comPhone
2624818Phone
2624819Phone
2624820Phone
2624821Phone
2624822Phone
2624823Phone
2624824Phone
2624825Phone
2624826Phone
2624827Phone
2624828Phone
4315691Wire Ref
referencesForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.