Skip to main content
Skip to content
Case File
efta-02624818DOJ Data Set 11Other

EFTA02624818

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02624818
Pages
11
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn MIIIIIMM Sent: Friday, September 7, 2018 6:30 PM To: Jeffrey E. Subject: Prosolar internet connectivity is no explanation for why system fails =onday / works tuesday and fails wednesday.. next few =mails are brians emails he sent to me.. please =dvise thanks Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor Begin forwarded message: From: =/b>Brian Prosolar Subject: =/b>Re: Friday June =9th Date: r/b>September 7, 2018 at 2:26:31 PM =DT To: =/b>Richard Kahn < Cc: Brice Gordon al>, Dan Prosolar >, Marcelo >, Brad Spernak michael glidden Afternoon Richard, As you may be aware the =nternet connectivity has been off on GSJ for a couple weeks. This has =revented continual analysis but are working with Brice and Micheal in a =eactive way as best we can. I've asked Dan to reach out to =rice to see if the operation of the system is back to the successful =onfiguration levels seen over the last few months. Dan relayed that he =as not heard from him in a couple days but I indicated that he needs to =ontinually inquire. Relatedly, I've rent you a few emails recently with no response. Just want to ensure you =re receiving them. Regards, EFTA_R1_01835676 EFTA02624818 Brian =alden ProSolar America, Ilc Director of O erations On Sep 7, 2018, at =2:54 PM, Richard Kahn < wrote: is solar back up? if so =lease advise what issues were.. thank =ou Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 On Sep 5, 2018, at 7:22 AM, brice gordon > wrote: .:1 Morning Same =ssue no power again Sunny islands =ead Sunny boys flashing =ellow Please as to what you would like to =o Brice Sent from my iPhone On Sep 4, 2018, at 12:11 PM, Dan Prosolar wrote: good morning all! hope =veryone had a great weekend.. minus GSJ with no power. i feel very good about my visit today. i was =eceiving error codes pertaining to an OVER- VOLTAGE situation. this is =reat news considering we have been fighting the opposite problem since =he hurricanes. i have had the system set to perform at the absolute =eek voltage it can to avoid loosing power. this maximum voltage 2 EFTA_R1_01835677 EFTA02624819 setting =eeters the system on the edge of its capabilities. as we see now it has =btained and exceeded its voltage setting limits on the sunny islands. =here is no damage done, only the inconvenience of it shutting down to =rotect itself. Today i throttled back the target voltage by 1v. this =hould prevent more shutdowns due to over voltage. i think we have got =his system dialed in. All the best, Dan Chrisman n Mon, Sep 3, 2018 at 6:57 PM, brice gordon > =rote: Good Evening The solar system is down on GSJ No power =unny islands Sunny boys seem to be in =farm Cluster box no power Please advise as to Dans schedule Regards =rice Sent from my =Phone On Jul 11, =018, at 2:10 PM, Marcelo wrote: Good =fternoon Richard, Please =ee the below email containing Dan's summary of what actions he =erformed on his last visit to GSJ. Regards, =/span> Marcelo =erez Project Manager <401A3348188040D088A29AA3089A8844[4315691.jpg> www.prosolaramerica.com 3 EFTA_R1_01835678 EFTA02624820 From: Dan Prosolar <mailto: Sent: =/b>Wednesday, To: =/b>Marcelo <mailt Subject: Re: FW: =riday June 29th Good =fternoon all, sorry for the delay my email had an issue and became =nlinked so I wasn't receiving these untill now. Regarding GSJ =ere is what's been achieved. -all Aquion battery =odules are wired to bypass the corroded, water damaged circuit boards =hat could interfere with charging profiles. -sunny islands (6) =ere downgraded to firmware version 6.0.02. This was done to allow a =roader, linear charge profile to be set -charging parameters =re now based on voltage set points rather than state of charge =alculations done internally with different references. -max charge voltage =as been set to 58.5V and the batteries will not stop charging untill a =oltage 1.5V over the set limit is a achieved for 15 seconds. This gives =hem the ability to serpase the previous charge voltage of 56.7V - the main issue =hat caused so much down time before was as follows. A target charge =oltage that matched the Aquion batteries was not possible with the =revious profile. Compiled on that was faulty Aquion circuit boards =reventing the batteries from properly charging to a suitable voltage. =quion, as we know, is no more, so it's impossible to obtain =eplacement parts. Aquions bms never met the as advertised performance =nd created more issues than we could have imagined. In short, the =hanged I made allowed for a higher, more suitable battery voltage to be =chieved and prevents the premature shut down we saw before. Again, sorry for the =elay, hope all is well Thanks Dan Chrisman 4 EFTA_R1_01835679 EFTA02624821 Senior Technical =pecialist Prosolar=LLC From: Richard Kahn <mailto: Sent: =/b>Wednesday, July 11, 2018 10:30 AM To: =/b>Brian Prosolar <mailto <mailto wrote: =1110.1.0lidden <mailto >; Brice Gordon Subject: Re: Friday June 29th can we do thursday morning or anytime friday when can expect =an's summary? please =dvise thank =ou Richard Kahn HBRK =ssociates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Jul =0, 2018, at 2:18 PM, Brian Prosolar Afternoon =ichard, Brad is traveling to =an Francisco for a conference and I'm boarding a plane to STX. ='ve asked Dan to write a synopsis of his efforts and we have =een monitoring for proper function. I'll relay this tomorrow =nce he's finished. 5 EFTA_R1_01835680 EFTA02624822 We're still =valuating but all is functioning as intended for the moment. Additional =onitoring and confirmation are needed since the weather over the last =eek has been extremely cloudy. Would it be possible =o have our call on Thurs. afternoon at 3 EST? Regards, Brian Walden ProSolar America, Ilc Director of =perations On Jul 10, 2018, at 1:50 PM, Richard Kahn =lt;r > wrote: i have =ot yet heard back from anyone on a time to speak please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Jul =, 2018, at 5:36 PM, Richard Kahn cal l wrote: can we please =rrange a call for tomorrow to review current status of GSJ solar thank you 6 EFTA_R1_01835681 EFTA02624823 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor On Jun =9, 2018, at 1:36 PM, Brian Prosolar wrote: Afternoon =ich, I =elieve the normal boat arrival time is 8 or 8:30 a.m. in Redhook. =nbsp; Dan =ill be there. Regards, Brian Walden ProSolar America, =lc Director of =perations On Jun 29, 2018, at 1:20 PM, Richard Kahn =lt > wrote: please =onfirm what time you will be arriving at GSJ on Monday thank you 7 EFTA_R1_01835682 EFTA02624824 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Jun =8, 2018, at 1:42 PM, Brian Prosolar wrote: Afternoon Richard, We're still =rying to have a final discussion with Stefan as well as track down =ultiple 128MB or smaller SD cards to reboot the Sunnyboy inverters. =e're moving as quickly as we can in order to execute the =onversion plan but it looks like we have to push to Monday. Dan has =hown Michael how to get the system back up and operating in the event =f it dropping offline and that is working for the interim. Regards, Brian Walden On Jun 28, 2018, at 11:08 AM, Richard Kahn = wrote: please =onfirm that you will be at GSJ tomorrow to work on the Solar thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 8 EFTA_R1_01835683 EFTA02624825 On Jun =5, 2018, at 7:27 PM, Brian Prosolar wrote: I want to ensure we have the PCB bypass discussion with the =ngineers prior to the visit and will try to expedite. Brian Walden EE RE Consultant On Jun 25, 2018, at 5:05 PM, Richard Kahn = > wrote: we are =ithout any solar currently can you please try to have dan come sooner thank you Richard =ahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Jun =5, 2018, at 4:31 PM, Brian Prosolar < wrote: 9 EFTA_R1_01835684 EFTA02624826 Afternoon =ichard, I have Dan on the =chedule to head to GSJ on Friday. Regards, Brian Walden ProSolar America, =lc Dir. =f Operations On Jun 25, 2018, at 3:30 PM, Richard Kahn =lt cri > wrote: can you please advise when your men can come =n and fix our solar system thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 10 EFTA_R1_01835685 EFTA02624827 <401A334B1BB040DOBBA29AA3089AB844(431569Ljpg> <=div> Prosolar Systems Let's Get Social Prosolar Systems Let's Get Social 11 EFTA_R1_01835686 EFTA02624828

Technical Artifacts (14)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainwww.prosolaramerica.com
Phone2624818
Phone2624819
Phone2624820
Phone2624821
Phone2624822
Phone2624823
Phone2624824
Phone2624825
Phone2624826
Phone2624827
Phone2624828
Phone4315691
Wire Refreferences

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.