Skip to main content
Skip to content
Case File
efta-02631706DOJ Data Set 11Other

EFTA02631706

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02631706
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Thursday, March 7, 2019 9:15 PM To: michael glidden Cc: Daphne Wallace; Stephanie Remington Subject: Fwd: 40x60 bldg. i =m not sure if you responded and i apologize if you did and i missed =t.. could you please update on status and next steps as =ee would like ordered asap thank you Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 tel fa cel Begin forwarded message: From: =/b>Richard Kahn Subject: =/b>Fwd: 40x60 =ldg. Date: =/b>February 22, 2019 at 3:25:25 PM =ST To: =/b>michael glidden Cc: =/b>Daphne Wallace Stephanie Remington can you please review and reply ASAP thanks Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York NY 10022 tel fa ce EFTA_R1_01852255 EFTA02631706 Begin forwarded message: From: Brian Buck Subject: RE: 40x60 bldg. Date: February 21, 2019 at 1:30:57 PM EST To: michael glidden Cc: Da hne Wallace , Richard Kahn a Stephanie Remington Michael, I want to put together a drawing for you but I =eed to clarify a couple of things first. So =he building was not erected according to plans, it was modified =omewhat in the field? The building was a fully sheeted =uilding. So the erector opened up the left end wall to 8'2 =80 and the back side wall to 10'6" but was sheeted ='6" past the roof of the 14" slab. How =eep is the retaining wall? Are the (2) 12' x =4' doors on the marked up dwg you sent back (front side wall =nd right end wall) to be included in these locations? Are we =dding a third rollup door in bay #3 of the front side wall where you =urrently have a 15' rough opening? Assuming the above is =orrect this is what I would propose. We =reviously had the left end wall as a flush girt condition. I =ould change it to a bypass girt so that the girt would extend =0"(depth of girt) past the face of the column. This way a) the =anel would lap over the retaining wall(if it is 10" or less =eep) for a good seal and b) would allow us to shift the columns in =0". This will clear the existing anchor bolts which will =e cut off and providing the pier is sufficient in width, would save a =hole lot of time and labor on those (4) left end wall columns. I'd leave the back side wall open to 10'6 =9D, sheet above the roof and provide a wall to roof flashing. ='m assuming the slab is all even elevation? I =hink if we change the bay spacings slightly(less than a foot in most =ases) we can avoid having to do a lot of the demolition. What=do you think? Regards, Brian =uck 2 EFTA_R1_01852256 EFTA02631707 President Direct Toll Free Web www.bucksteel.com Follow us on social media! 6855 Lyons Technology Circle = Suite 18 I Coconut Creek FL 33073 1107=Battlewood Street I Suite 221 I Franklin TN 37069 Legal Disclaimer: This =ommunication and any attachments contain information which is =onfidential and may also be privileged. It is for the exclusive use of =he intended recipient(s). If you are not the intended recipient(s) =lease note that any form of disclosure, distribution, copying or use of =his communication or the information in it or in any attachments is =trictly prohibited and may be unlawful. Where the content of this email =s personal or otherwise unconnected with the firm's or its clients' =usiness, Buck Steel accepts no responsibility or liability for such =ontent. E- mail communications cannot be guaranteed to be secure or =rror free, as information could be intercepted, corrupted, amended, =ost, destroyed, arrive late or incomplete, or contain viruses. We do =ot accept liability for any such matters or their =onsequences. From: michael glidden Sent: Wednesday, February 20, =019 4:56 PM To: Brian Buck Cc: Daphne Wallace ichard Kahn <mailto: »; Stephanie Remington Subject: Fwd: 40x60 bldg. Good afternoon Brian. l=thought that this might help understanding how the building was =nstalled. The only openings are as marked up. I will gather the information tomorrow that we discussed = Begin forwarded message: From: michael glidden = Subject: 40x60 bldg. Date: February 20, =019 at 5:47:48 PM AST To: 3 EFTA_R1_01852257 EFTA02631708 Sent from my =Phone =/div> 4 EFTA_R1_01852258 EFTA02631709

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainwww.bucksteel.com
Phone2631706
Phone2631707
Phone2631708
Phone2631709

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.