Skip to main content
Skip to content
Case File
efta-02700824DOJ Data Set 11Other

EFTA02700824

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02700824
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
August 8, 2012 Private Residence 9 East 71g Street New York, NY 10021 Attention: Subject: Dear Merwin; wr ia,6904,044-s. Tel 718-786.4040 Fax 718-482-9405 28-31 Borden Avenue Long Island City, N. Y. 11101 Mr. Merwin Dela Cruz HVAC Project Pursuant to our recent discussions and on site survey, Crystal Comfort would like to offer this proposal for upgrades to the existing HVAC equipment located at this residence. Specifically, we will replace the existing cooling tower, then change the old Carrier electric chiller to a Multistack module. In addition we will be adding a sand filter to the condenser water loop. Statement of Work: Disconnect the two fan sections of the BAC cooling tower on the roof. Remove sections by crane. Then rig new sections into place. Re-connect piping & electrical. Redo insulation where necessary. Install new variable frequency drives for the tower fans. Provide full site protection in the hallways, elevator and MER during the course of all indoor work. Remove and replace the cooling tower sump located in the basement. Perform a complete demolition of the existing Carrier chiller in basement. Remove all oil & refrigerant as per EPA standards. Deliver and install a new Multistack MS030-407c module which will be a part of the existing two modules. 1 EFTA_R1_02068317 EFTA02700824 Mr. Merwin Dela Cruz 9 East 7e Street Make necessary piping & electrical connections. Insulate as required. Install a new PEP sand filter in the basement. Tie into the condenser water loop. Run power feed to unit. Start and commission all equipment. Clean off job site. Provide warranty on all work for a period of one year. The Multistack compressors will have a five year warranty (parts only). Provide a DOB filing and equipment use permit. For this work we quote $219,000.00 (Two Hundred Nineteen Thousand Dollars) as a Capital Improvement Project. Payment terms shall be as per AIA contract and schedule of values. CONDITIONS Performance or capacity testing is excluded. All work is to be performed on a straight time basis. Customer is to provide safe and unobstructed access to the work area. Any ASHRAE-15 upgrades or ventilation upgrades required to comply with local and current building code are not included. Owner must make available a spare circuit breaker for sand filter power. Should you have any questions or concerns, feel free to contact me at your convenience. Regards, Joseph DeMaio Vice President 2 EFTA_R1_02068318 EFTA02700825

Technical Artifacts (6)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

FaxFax 718-482-9405
Phone2700824
Phone2700825
Phone718-482-9405
Phone718-786.4040
Wire Refrefrigerant

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.