Case File
efta-02704309DOJ Data Set 11OtherEFTA02704309
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02704309
Pages
3
Persons
0
Integrity
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
From:
Erika Kellerhals
Sent:
Friday, March 18, 2016 8:23 PM
To:
Jeffrey Epstein
Subject:
Fwd: Great St. James
Attachments:
BMA SURVEY PROPOSAL Great St James 2016-02-04.pdt BUDGET 2016-02-04.pdt
BMA Rates 2016.pdf
FYI.
PLEASE NOTE OUR NEW ADDRESS BE=OW.
Erika A. Kellerhals
Member
Kellerhals Ferguson Kroblin PLLC
Royal Palms Professional Building
9053 Estate Thomas =uite 101
St. =homas, VI 00802
Notice: This communication may co=tain privileged or other confidential information. If you are not th= intended
recipient, or believe that you have received this communication =n error, please do not print, copy, re-transmit,
disseminate, or otherwise=use this information. Also, please indicate to the sender that you h=ve received this e-mail in
error, and delete the copy you received. =hank you.
Circular 230: To ensure compliance wi=h the requirements imposed by the IRS, we inform you that any tax advice
c=ntained in our communication (including any attachments) was not intended =r written to be used, and cannot be
used, for the purpose of (i) avoiding =ny tax penalty or (ii) promoting, marketing or recommending to another par=y any
transaction or matter addressed herein.
Forwarded message
F=om: Ryan Wisehart
Date: Fri, Mar 18, 2016 at 3:43 PM
Subject: Fwd: Great St.=James
EFTA_R1_02088922
EFTA02704309
To: Erika Kellerhals
Cc: Richard Kahn
Erika,
For your convenience l'= attaching the original proposal and budget documents provided to Daphne, =hen forwarded by
her to Rich. The following narrative should help fill-in =he gaps which I probably didn't communicated well via the
proposal.
Our Scope-of-Work as conceived includes Road Design=and Development and Topographic Surveying, as follows:
1.
Devel=p conceptual road layout plan (Delivered). The purpose of this ex=rcise is to determine feasible and
preferable routes for accessing the isl=nd promontories. The owner desires gentler routes than those developed on
=ittle St. James. With that in mind we used existing aerial terrain mapping=to develop routes that should have gradients
of about 10% or less. Routes =ere also determined that will facilitate future water and helicopter point= of access. At
this point I need the owner's feedback before procee=ing to a more detailed engineering plan. Does the owner want
more or f=wer roads, access to other locations, etc? We'll incorporate owner fee=back into a revised concept and
proceed to developing permit plans.
Prepare plans for permitting including earth-change and erosion/sedime=tation control. Upon owner approval
of the conceptual road layout=plan we will develop specific plans for supporting permit applications wit= CZM. These
plans will include specifications for the roadways including t=pical road section (road foundation), existing and proposed
road profile e=evations (grades), erosion and sedimentation controls and best practices.<=li>
2.
Field staking of roadways and erosion control measures.Q=A0Field staking of the roadways will provide
accurate assessment of routes=through actual, direct ground measurement. Adjustments in road locations w=ll be made
at this time to avoid terrain that is too steep, highly erodibl=, and to facilitate preservation of desirable natural features
(i.e. rock =ormations, special trees, etc.) The staking will also allow investigations=by Bioimpact.
3.
Topographic surveys of various areas including th= existing main house and new dock area. Basically, general
on-ca=l services as requested. There was previously mention of surveying the mai= house area but I'm not aware if this
is needed or not. Also, Amy ment=oned needing an as-built survey of the dock. I'm not sure if the infor=ation we
presently have for the dock is sufficient for her purposes.
col>
Moving forward it is advisable that we have a coordination meeting=with Amy and any other persons working
on the project (is there an archeol=gist on board, architect, etc.?) Also, who will be preparing the actual pe=mit
application and appearing for public hearings, if any are needed?
Finally, please let me know if Mr. Epstein has comment= about the road concept and if we should proceed with
developing permit pl=ns.
Forwarded message
F=om: Ryan Wisehart <=a href=
target="_blan
Date: Thu, Feb 4, 2016 at 11:26 AM
Subje=t: Great St. James
To: Daphne Wallace
Cc: Erika Kell=rhals
2
EFTA_R1_02088923
EFTA02704310
Good morning Daphn=,
Attached is our proposal, budget, and hourly rates. P=ease sign and return the proposal indicating acceptance
and I will forward=an invoice for mobilization. Please be sure to give me a call with any que=tions.
Sincerel=,
Ryan C. Wisehart, PLS
President
BRIAN MOSELEY & ASSOCIATES, INC.
4003 Raphune Hill Road =uite #606 St. Thomas, VI 00802
ph.
fx.
cl.
skype: r=an.c.wisehart.bma
3
EFTA_R1_02088924
EFTA02704311
Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.