Case File
efta-02706956DOJ Data Set 11OtherEFTA02706956
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02706956
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
brice gordon
Sent:
Wednesday, January 9, 2013 1:41 PM
To:
Jeffrey Epstein
Cc:
Larry Visoski;
Carlos Rod
Subject:
Little C
Attachments:
LSJ F300 FL300 LITTLE C.pdf
Jeffrey
Attached estimate is for the repowering of=Little C for your review $50,416.00, plus $10,000 for tidy up work on c=bin
house, hull and trailer.
as discussed the 300 yamah= outboards are lighter than existing 250 and would be more suitable for a =oat of this size
and weight, 15,000 lbs with out passengers this would also be a more fuel efficient option as we would not be run=ing
the boat so hard.
Estimated trade in on old e=gines, $8000.00 each
Regarding Fat= estimated refurbishment cost could reach around 120k plus this would be new engines, steering,
electrical hull work, paint etc<Aiv>
For any large loads of cargo or crew we can use bar=e or just do two trips multiple people can drive little C vs Fat=C
Hurricanne haulout is local either LSJ or St Thomas, not BVI
please advise on =ow you wish to proceed.
<=trong>Brice Gordon
USVI
Phone:
New Mexico
Phone:
1
EFTA_R1_02103639
EFTA02706956
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2103639Phone
2706956Wire Ref
refurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.