Case File
efta-02707545DOJ Data Set 11OtherEFTA02707545
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02707545
Pages
4
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Richard Kah
Sent:
Monday, March 3, 2014 10:37 PM
To:
Jeffrey Epstein
Cc:
Cecile deJongh; Jeanne Brennan
Subject:
ISP / LSJE Wifi & Tower
Attachments:
Terrence Quote.pdf; Untitled attachment 00068.htm; viNGN Community Anchor
Institution List 10-30-13.xlsx; Untitled attachment 00071.htm
ISP
In order =o become an ISP our entity must complete the =ollowing:
1) Register with It Governors office =ia application (VINGN initial connection fee of 500)
2) =egister our Dragon wave and Red Line (ISP Equipment) with =CC Dragon wave 1,500 Red Line =,200 x 2 = 2,400 Total
FCC Cost = =,900
3) Provide VINGN with the following =nformation about our entity
a) articles of =rganization
b) certificate of good standing
c) =ertificate of =ncumbency
Monthly ISP =perating Costs
VINGN 25 Meg Min Monthly =urchase at cost of $40 per meg = 1,000 per mo (must =ommit to a 2 or 5 year contract
term) VINGN Dual attached =onnectivity rate = 200 per month
VINGN Transport =ggregation = 100 per month
VINGN Co-lo Package =External) = 800 per month SBA Tower Rental on STT =nbsp;= 400 per month
Total Monthly =osts = 2,500
Total Annual Cost = =0,000
Cost per Meg = 100 per =onth
(Terrence believes that if we buy more 50 =eg or more we will have ability to negotiate above =igures)
30,000 annual cost will provide 25 Meg =f internet for STC and LSJE. We would have to decide on how much =o provide
each property with.
Our current bandwidth and costs =re as follows:
LSJE via Choice 15 Meg @ 2,625 =er month = 31,500 annual cost (175 cost per meg per =onth) STC via TM Telecom 4.5
Meg @ 2,139.60 per month ==25,648.56 annual cost (475 cost per meg per =onth)
Total annual cost 57,148.56 vs 30,000 =s ISP = 27,148.56 annual =avings
15JE =IFI / Tower
location of 10 x 10 concrete =ad as been marked by Danny and Terrence by =erm
EFTA_R1_02105889
EFTA02707545
Tower:
a) Weather Rating - 220 =ph winds
b) Corrosion not an issue since tower will be =ust galvanized in hot dip for caribbean
c) Tapper top with =ightening rod and beacon light
d) Must be painted orange and =hite every 10' (painting will be approximately 1 foot in =idth) =-> mandatory to paint on
all towers greater than =0'
e) Drag wave will be mounted at 30'
0 Bridges =nd repeaters mounted at 40'
g) High power AP's mounted at =7'
Attached bid of 263,598.45 =equires a 50% deposit then 25% upon receipt of equipment and job =eginning and final
25% upon completion of =ob
Bid is broken down as =ollows:
Materials
=nbsp;
227,972
Labor =nbsp; =/span>
28,500
Shipping & Ground =rans =/span>7,126
Terrence states that all equipment =s at cost with exception of AP's / Bridges and Repeaters. He =arks up these items to
cover warranty costs.
Our Cost of =hese items with 20% markup = 91,296 Terrence Cost = =6,080 Profit = =5,216
Negotiated Price = =57,000
It has been very tough to verify =is costs. Please advise if i should ask him for vendor to verify =osts or if not done
through STC then we purchase materials directly =rom vendor
Terrence offers a Limited =arranty on equipment of 1 year and 3 months on his labor.
He =ecommends a Maintenance Contract for both the Wifi Equipment and =inks (Dragon wave & Red Lines)
Anything =hat is wrong with equipment or labor will be replaced at no cost to =s Each mtc contract includes at least 2
days per month to =ook after equipment and do preventative =aintenance
Maintenance contract not signed up =t time of contract = 1,500 per contract x 2 x 12 months = =6,000 per annum
Maintenance contract at time of contract = =,200 per contract x 2 x 12 months = 28,800 per =nnum I was able to
negotiate his maintenance contract to =50 per contract x 2 x 12 months = 20,400 per =nnum
Timing - 9 weeks start to =inish for ISP and WIFI / 3 weeks for equipment lead time = 12 weeks ==May 26th
-> Terrence believes that =ithout unforeseen issues job should be
-> completed by May =5th
=div>
ISP as =usiness
VINGN currently has 12 HOPS spread =cross STT and 22 HOPS across St Croix Terrence estimates cost =f 150,000 per 12
hops for WIFI = 1,800,000 plus additional 200,000 =or core equipment Total cost to blanket all of STT = =,000,000
If equipment for all HOPS were =urchased at once he would be able to receive a 30% discount which =mounts to
approximately 540,000
2
EFTA_R1_02105890
EFTA02707546
Core equipment =ncludes the following:
Cisco Router 7606, 24 Port Cisco =witch with 4 sfp ports, apc backup and inverter, 3 servers (DNS, Mail =amp; AAA) &
main will controller with enterprise =oftware
Will need an office space to =tore main junction equipment (generators, backup batteries, cisco =witches and air
conditioning) Preferable size of indoor =pace 10' x 12' or 15' x 15'
Hop =quipment and estimated costs are as follows:
5,275 =nbsp;Cabinet
10,000 30 ft tower with braces and =rounding / side arms and mounting wings for radio =inks
3,500 switch
15,000 section =ontroller
30,000 high power AP's with sector =ntennas
39,200 Dragon Wave link
3,490 APC inverter = backup
2,295 Deep cell backup batteries
8,000 12k =enerator with transfer switch
5,743 PIMP section controller =may need 2 at some locations) - used for business customer who needs =LA and 5 or
more Megs of service
3,183 CPE for those =ustomers
Terrence projects 6,000 and 2 weeks =o install each hop which includes labor, cables, brackets, anchors, =crews,
junction boxes and misc Each HOP require a concrete =ad (1' x 6')
Follow up
1) Map =ut 316 Community Anchor Institutions (CAI) (see attached Excel file) to =ee if there are specific areas to initially
target
2) =tatistics on CAI current internet usage and costs (may have to be =elephone solicitation)
3) Blanket Red Hook as market =est
4) Insurance requirements for our =ntity
Per Terrence there are currently 10 =SP's on SIT:
6 new signed up via VINGN in addition to the =xisting 4 (choice, innovative, broadband vi & smart =et)
Current customers of =errence:
1) Ritz Carlton
2) Sugar =ay
3) Frenchman Cove
4) Westin
5) Banco =oplar
6) Scotia Bank
7) Botany =ay
Terrence is very honest and =traightforward. His is a Manager at Guardian Insurance and is =ery weak back office is
supported by his =ister.
Richard Kahn
HBRK Associates =nc.
575 Lexington Avenue, =th Floor,
New York, New York 10022
te
3
EFTA_R1_02105891
EFTA02707547
fax
cell
=
4
EFTA_R1_02105892
EFTA02707548
Technical Artifacts (9)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2105889Phone
2105890Phone
2105891Phone
2105892Phone
2707545Phone
2707546Phone
2707547Phone
2707548Wire Ref
transfer switchRelated Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01374407
1p
DOJ Data Set 10OtherUnknown
EFTA01876382
4p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01971993
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01944593
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01959013
0p
DOJ Data Set 10OtherUnknown
EFTA01418944
34p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.