Skip to main content
Skip to content
Case File
efta-efta00142448DOJ Data Set 9Other

U.S. Department of Justice

Date
Unknown
Source
DOJ Data Set 9
Reference
EFTA 00142448
Pages
3
Persons
0
Integrity
No Hash Available

Summary

U.S. Department of Justice Federal Bureau of Prisons Metropolitan Correctional Center New York, New York 10007 July 17, 2019 MEMORANDUM FO REGIONAL DIRECTOR FROM: arden SUBJECT: Request of B&F Project Asbestos Removal This is a request to establish a B&F project in the amount of $100,000.00, in order fora contractor to remove asbestos. There were multiple surveys done dating back from 2009 to present. The surveys have identified multiple areas throughout the institution that have tested positive for asbestos. Attached are the Schedule of Cost Input (SCI), and Government Estimate (IGE). Please feel free to contact me if you have any questions. Attachments EFTA00142448 FAC 2.6 - Independent Government Estimate (IGE) Date 7/17/2019 Request Intial Institution MCC New York Category General Improvements Project Title Asbestos Removal Category Object Class Man-Hours 25 (Contract) 26 (In-House) 1 General Requirements $60,000.00 160 2 Sitework 3 Conc

Tags

eftadataset-9vol00009
Ask AI about this document

Search 264K+ documents with AI-powered analysis

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
U.S. Department of Justice Federal Bureau of Prisons Metropolitan Correctional Center New York, New York 10007 July 17, 2019 MEMORANDUM FO REGIONAL DIRECTOR FROM: arden SUBJECT: Request of B&F Project Asbestos Removal This is a request to establish a B&F project in the amount of $100,000.00, in order fora contractor to remove asbestos. There were multiple surveys done dating back from 2009 to present. The surveys have identified multiple areas throughout the institution that have tested positive for asbestos. Attached are the Schedule of Cost Input (SCI), and Government Estimate (IGE). Please feel free to contact me if you have any questions. Attachments EFTA00142448 FAC 2.6 - Independent Government Estimate (IGE) Date 7/17/2019 Request Intial Institution MCC New York Category General Improvements Project Title Asbestos Removal Category Object Class Man-Hours 25 (Contract) 26 (In-House) 1 General Requirements $60,000.00 160 2 Sitework 3 Concrete 4 Masonry $ Metals a. Structural b. Miscellaneous 6 Wood & Plastic 7 Thermal & Moisture Protection $10,000.00 160 a. Insulation 8 Doors & Windows 9 Finishes $10,000.00 160 a. Paint b. Flooring c. Ceiling d. Other 10 Specialties 520,000.00 120 11 Equipment 12 Furnishings 13 Special Construction 14 Conveying Systems 15 Mechanical a. Plumbing b. HVAC 16 Electrical a. Primary b. Secondary c. Lighting d. Communications TOTALS: $100,000.00 $0.00 600 Grand Total: $100,000.00 EFTA00142449 FAC 2.5 - Schedule of Cost Input (SCI) Date 7/17/2019 Request Intial Institution MCC New York Category General Improvements Project Title Asbestos Removal FY19 FY20 FY21 Object Class P05 WY $ x 1000 POS WY $ x 1000 POS WY $ x 1000 11.1 Full-Time Permanent 11.5 Other Personal Compensation 12.1 Personal Benefits: Civilian 21.0 Travel and Transportation of Persons 22.0 Transportation of Things 23.2 Rental Payments to Others 23.3 Communication, Utilities and Miscellaneous Charges 24.0 Printing and Reproduction 25.0 Other Contract Services 19 100.0 26.0 Supplies and Materials 31.0 Minor Equipment 32.0 Land Structures Total 100.0 0.0 0.0 Total 100.0 Total in Dollars $100,000.00 There are muliple areas within the institution that has been identified by NYS ce ified contractor which contains abestos. The asbestos files are unintentintally breaking and sepe acing from the floor in both inmate and vistor ares. Current Conditions MCC New York proposes to hire a contractor to remove all asbestos identified in past and present surverys. The contractor will also inspect, dean, abate, and dispose of all asbestos contained therein. The abatement contractor shall certify that the Institution complies with OSHA and HUD requirements for asbestos thresholds. a. MCC New York, 150 Park Row, NY b. N/A C. N/A d. N/A e. N/A Proposal I. RS MEANS g. CONTRACTOR h. General Requirements (60,000.00), Thermal/Moisture Protection (10,000.00), Finishes (10,000.00), Specialties (20,000.00). i. N/A J. This project will comply with all FBOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA and Federal, State, and Local codes and regulations as applicable to this project. j. Compliance has been addressed as applicable to this project, inclusive of FBOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA- ABA, and Federal, State, and Local codes and regulations. k. N/A MOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NEPA, ADA-ABA, and Federal, State, and Local codes and regulations have been reviewed or if AGE services are required must all be addressed in the proposal section of this justification. Page 1 EFTA00142450

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.