Case File
efta-efta00289471DOJ Data Set 9OtherGROFF JOB
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00289471
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
GROFF JOB
Actual Cost
As of 5-20-14
Description
appliances
$
22,949.54
blueprints
$
124.08
brick
cabinetry and countertops
$
90,667.63
carpeting in bedrooms
chimneys-2
$
2,538.89
clean up
$
2,900.00
closet shelving
$
9,574.39
columns - pergula
basement
$
25,504.76
demolition
$
21,500.00
doors interior
$
11,800.00
dumpsters
$
10,254.42
elevator
electric
$
93,497.00
engineering
$
6,736.12
excavation
$
81,646.98
Excavation - Drywells
$
16,877.08
driveway
$
2,653.43
fireplace fronts
$
10,869.45
flashing
flatwork
$
37,391.17
foundation
$
58,601.84
framing labor
$
97,650.00
framing lumber
$
125,923.72
front door
$
8,327.11
garage doors
$
19,003.45
granite kitchen and powder room floor
gutters
$
8,056.83
hardwood flooring
$
33,024.83
house warranty
hvac
$
47,200.30
insulation
$
16,045.00
labor
$
2,450.00
land clearing (in excavation)
landscaping
$
1,062.00
lighting fixtures
$
7,299.72
locks
$
5,559.19
marble in master bath
$
5,075.82
mirrors/ shower doors
$
11,811.45
paint interior and exterior
$
100,455.56
permits
plumbing fixtures
$
15,028.70
plumbing labor
$
36,100.00
rail exterior
$
11,475.00
punch list
$
3,294.97
portable toilet
$
3,054.77
EFTA00289471
patio deck
retaining walls
roof slate
shutters
siding
screened porch
security, central vacuum, telephone, cable
septic / sewer hookup fee
sheetrock
stairs and rails
stone for foundation in Foundation line
stonework, exterior and stone fireplaces
stucco
Steel
stump removal
tile labor and material
trim labor
trim material
trim library material and labor
trim exterior
trim build in cabinetry
walks
well
water conditioning
windows
water proofing
utilities
outdoor kitchen
steel
incidentals
miscellaneous charges
miscellaneous charges - street work
porch steps
Pergula
TOTAL EXPENSES EXCLUDING CONTRATOR
contractor fees
$
49,745.91
$
37,133.70
$
82,360.00
s
5,445.01
s
1,474.01
s
57,364.54
s
21,225.00
s
8,189.97
s
76,339.78
s
35,730.00
s
40,442.26
s
59,000.00
s
36,768.68
s
55,159.66
s
14,107.05
s
24,000.00
s
5,500.00
s
79,380.84
s
3,150.00
s
15,667.26
s
4,450.00
s
2,125.39
s
9,731.86
s
72,887.91
s
6,000.00
s
20,211.96
TOTAL EXPENSES
$ 1,887,575.99
$
127,250.00
$ 2,014,825.99
EFTA00289472
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.