Skip to main content
Skip to content
Case File
efta-efta00306083DOJ Data Set 9Other

TAYLOR,

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00306083
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
TAYLOR, COTTON, RIDLEY INC. DOORS. HARDWARE. & BUILDING SPECIALTIES Date: 06/24/13 To: Daphne Wallace Little St. James Phone: Fax: RE: SL 17 Door replacement 1904 Brengle Avenue Orlando, Florida Ph: (407) 298-5114 Fax: (407) 298-5336 Taylor, Cotton & Ridley is pleased to provide a material supply quotation (with optional installation package) for the above referenced project as follows: 1.) Quantities Special lite SL-17 Flush FRP doors 1 each Single SLI7 Door up to 38" x 88" 2 each Pairs SLI7 Doors up 72" x 96" 3 each Pairs SLI7 Doors up 96" x 96" 15 each Heavy duty Select Cont. Alum geared hinges 7 each Keyed removable Von Duprin mullions 15 each Von Duprin 9927 SV exits 8 each Rim Cylinders for exits 7 each Mortise Cylinders for rem. mulls 8 each Panic latch thresholds 8 sets Polyurethane heavy duty perimeter gasketing 15 each LCN 4040XP closers each Freight to port for transportation to jobsite Material Supply Exclusions: I.) Labor to Receive Materials & Door/Hardware Installation. 2.) All Aluminum Storefront Doors, Frames, Windows & Hardware are excluded. 3.) All Glass for Doors or Frames is excluded. 4.) Additional Protection to doors and frames (other than Manufacturer's packaging) is excluded. 5.) Costs to repair any doors, frames, or hardware damaged on-site. TOTAL MATERIAL SUPPLY PRICE $44,300.00 (Tax Not Included) Break out of pricing DOORS $24,944.00 HARDWARE $19,356.00 EFTA00306083 TOTAL BID PACKAGE PRICE: $44,300.00 (TAX NOT INCLUDED) WHEN REQUIRED. SHOP DRAWINGS SHALL BE FURNLSHED, AND WHEN APPROVED BY THE PURCHASER'S ARCHITECT, THEY SHALL BE DEEMED TO BE CORRECT INTERPRETATION, DESIGN AND DIMENSIONS. NO BACK CHARGES WILL BE ACCEPTED UNLESS SPECIFICALLY AGREED UPON IN WRITING. WE WILL NOT BE RESPONSIBLE FOR LOSS OR DAMAGE ARLSING FROM DELAYS CAUSED BY LACK OF CORRECT OR COMPLETE DATA, BY CHANGES OR REVISIONS, BY LATE APPROVAL OF DRAWINGS, OR BY ANY OTHER CAUSE BEYOND OUR CONTROL SHOULD THE PURCHASER TEND HIS OWN PURCHASE ORDER CONTRACT, ALL TERMS AND CONDITIONS OF THE PROPOSAL SHALL BE BY THLS REFERENCE BE INCORPORATED THERIN. MATERIALS IN THIS QUOTATION ARE QUOTED F.O.B. FACTORY, WITH FREIGHT INCLUDED FOR TAILGATE DELIVERY TO YOUR JOBSITE. QUOTATION IS SUBJECT TO REVIEW IF NOT ACCEPTED WITHIN 30 DAYS. WE ARE BONDABLE: HMVEVER, A BOND PREMIUM HAS NOT BEEN INCLUDED. OUR TER%LS ARE: NET 30 DAYS WITH APPROVED CREDIT OR PROOF OF BONDING. If you should have any questions, please call me. Thank you for the opportunity to provide you a quotation. Sincerely, Taylor, Cotton & Ridley, Inc. Greg G Sanders, AI I C Project Manager EFTA00306084

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

FaxFax: (407) 298-5336
Phone(407) 298-5114
Phone(407) 298-5336
Wire RefREFERENCE
Wire Refreferenced

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.