Zorro Development Corp - Project Report 10/11/13
22 - LANDSCAPING
START
END
EST.COST
NOTES
Mit
06/01/13
$75,000.00 3/28/13 — Refurbishment & Mainteance Proposals from 3
Awaiting
companies forwarded to RK & DI
Direction
Aooroval JE
4/27/13 — JE approved Aspen for Refurbishment Project & Aspen
on
to remain as ZDC Mainteance Company
E Mails
5/9/13 — New Proposal forwarded to JE, RK awaiting direction
dated
5/16/13 — Final proposal forwarded to RK
08/22/13
5/24/13 —Aspen agreed to $75,000.00
09/28/13
5/31/13 — Deposit of $44,383.08 issued to Aspen
09/27/13
6/1/13 — Project Started
6/8/13 — Work continues, soil preperation in progess
6/14/13 — Plant material starting to arrive
6/18/13 — More plant materail on site
6/21/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
8/26//13 — More plant material on site
/27/13 — Preperation of front parking area begins, Columbines
& Trumped Vine planted along pathway between MH & Dog Pen
Irrigation installed In all planted areas — attached photos
7/12/13 — Plant & Irrigation installation continues —
Attached plant schedule & photos
7/26/13 — Project 90% Complete
Having issues locating Cypress Trees.
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 old Hawthorns & replace with 4 Junipers
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
8/11/13 — JE updated request — remove old Hawthorns & Junipers
8/22/13 — Forwarded to JE suggested colourful plant,
material selected for discussed areas — awaiting direction
PHOTO
STATUS
Page 3
EFTA00315471
Zorro Development Corp - Project Report 10/11/13
8/24/13 — Awaiting Proposals - 3 vendors for Preventive Spraying
& Fertilizing of new & exislting plant material due by 9/24/13
9/18/13—Aspen Landscaping removed old Hawthorns & Junipers
attached photos
9/22/13 — Awaiting Direction
9/26/13 — Forwarded to RK 3 Proposals for Preventive
Spraying & Fertilizing_
9/27/13 — Forwarded to JE & RK__photo of proposed Blue
Spruce 6 — 7 ft, larger would be available in the Spri
10/4/13 — Awaiting direction
n9
Page 4
EFTA00315472
Zorro Development Corp - Project Report 10/11/13
- MEDIA ROOM
START
END
EST.COST
NOTES
PHOTO
STATUS
.24
CURTAINS
Blackout & Rings
$6,262.08 4/27/13 — JE Selected Fabric for Prigiect
Awaiting
5/10/13 — Project Request Form forwarded to JE & RK
Direction
5/17113 - Resubmitted Project Request Form to JE
5/31/13 - As of date Awaiting Direction
25 — OFFICE
START
jgjj,Q
EST.COST
NOTES
PHOTO
STATUS
CURTAINS
Lined & Rings
$2,527.01 4/27/13 — JE Selected Fabric for Project
Awaiting
5/2/13 — Vendors & Manufacturer enable to provide enough
Direction
yardage of selected fabric
on
5/9/13 — Another fabric option forwarded to JE
Forwarded
5/10/13 — Project Request Form forwarded to JE & RK
E Mail
5/17/13 — Resubmitted Project Request Form to JE
dated
5/31/13 —As of date Awaiting Direction
05/17/13
Page 7
EFTA00315473
Zorro Development Corp - Project Report 10/11/13
(43-REFURBISHMENTSTART
END
EST.COST
NOTES
PHOTO
STATUS
LANDSCAPING — LV
8/22/13 — JE Approved Project
Awaiting
Cover Rock with soil, Pinion installation
Direction
on E Mail
8/22/13 - Forwarded JE suggested colourful plant material
for discussed areas — awaiting direction
dated
9/18/13 — Router Tilling Complete. Ready for Top Soil
10102113
9/18/13 — Forwarded JE & RK breakdown of installation/purchase
etc of sod. Total $5,512.50
9/18/13 — JE asked how much sod. 5,350 sq ft
9/27/13 — Reviewing sod estimates
10/2/13— Resubmitted revised installation/purchase etc of
sod to RK. Total $5,358.25
,44 — LODGE ROOF
START
ED
EST.COST
IMO
PHOTO
STATUS
9/27/13 — Forwarded JE & RK estimate to repair Lodge Roof
attached estimate & photos
9/27/13 — JE Did Not Approve Project
-I
Page 18
EFTA00315474
PURCHASES
REPAIRS
Zorro Development Corp - Project Report 10/11/13
START
END
EST.COST
NOTES
MOTO
STATUS
Heavy Machinery
8/22/13 — JE requested investigating a Bulldozer purchase & any
other equipment ZDC may require
Awaiting
8/27/13 — investigating avaiable equipment
Direction
on E Mall
Bobcat
9/3/13 — Investigating trading exisiting Bobcat for new
dated
9/18/13 — Have price from local Bobcat dealer, as of date no one
10/02/13
has been able to match this price
10/2113 — Forwarded E Mall to JE & RK, with details
Offered 8K from local contractor, $5,500 as a trade from
From Bobcat. Awaiting Direction
1984 Dump Truck
W22/13 — 1989 Dump Truck requires new transmission & clutch
Awaiting
9/27/13 — Dump Truck was hauled, estimate !petted 10/4/13
Direction
10/3/13 — Vendor did not receive message about estimate
on E Mall
hence ordered a rebuilt transmission $4,136.98
dated
Total estimate to repair 67 712.72
10103113
Forwarded details to JE & RK, awaiting direction
Outside Furniture —
Lodge
8/22/13 — JE agreed new outside furniture required, will relocate
exiitng table & benches from Shooting Range to uncovered back
deck
9/1/13 — Will investigate funiture options for covered back deck
On Hold
9/16/13 — After reviewing uncovered deck, we believe that the
until
deck will not handle the weight of the table & benches from the
Spring 2014
Shooting Ranch, especially if we receive snow
9/22/13 — Will investiage all options over the next week
9/27/13 — Will forward suggestions 10/4/13
10/4/13 — Unable to find anything locally, so late in the season.
Will relocate funiture from other areas to cover up coming guest
visit. Will place this project On Hold until Spring 2014
Page 19
EFTA00315475
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
REFURBISHMENTSTARTWire Ref
RefurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.