Skip to main content
Skip to content
Case File
efta-efta00327209DOJ Data Set 9Other

From: Larry Visoski 41.1e.

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00327209
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Visoski 41.1e. To: Je vacation an-, ==l > Cc: Rich Kahn Subject: GIV update Date: Thu, 24 Mar 2016 13:21:02 +0000 Jeffrey, Elevator flight control cable was changed due to ware. While doing flight control checks, Gulfstream mechanic noticed a clicking sound in control yoke, while rotating aileron yoke. They removed the Yoke from cockpit, replacing nut plate under floor board in cockpit, time consuming,. Better update on delivery status later today.,Dave and I plan to arrive at Westfield at noon tomorrow. Thx Larry Pete and Larry, Aircraft is still in tail dock. Wing leak checks ongoing as some panels have leaked and require corrective action. O2 bottles installed and leak checked. We have run into some challenge's with the yoke repair/installation. This is pushing our time frame back. We will access any revision to delivery later today as work progresses and we can make an accurate estimate. Thank You, Mike Tucker Sent from my iPhone EFTA00327209

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.