Case File
efta-efta00369807DOJ Data Set 9OtherFrom: Lvjet <a>
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00369807
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet <a>
To: "jeevacation(tcgmail.com" <jeevacationggrnail.com>
Cc: "
"
Subject: GIV update
Date: Wed, 07 May 2014 22:51:54 +0000
Jeffrey,
Flight time: TEB - STT is 3+13min (+34kt tailwind).
Test flight on GIV today went well,
-I was pleased with Door seal, inflates fully and db lever is much lower in fwd cockpit area with sound proof material on cabin
door.
-charging dock for stereo remote looks amazing,. / Down wash lights above credenza have been replaced,./ dish, salt and
pepper and several drawers in galley have dividers installed.
-it was tough to find smooth air during todays flight, I brought Julian, Mx shop manager, most of flight felt smooth, brief
moments our light buffet was present, so I was able to demonstrate to Julian our concerns,.
only issue during flight was cockpit windshield heat regulator failed, part will arrive 9am tomorrow and should be
completed by noon. I'm planning to reposition to Teterboro by 3pm for our departure
let me know if there is a chance you will depart earlier than 6pm?
thank you,
Larry
EFTA00369807
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
jeevacationggrnail.comDomain
tcgmail.comForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.