Skip to main content
Skip to content
Case File
efta-efta00495642DOJ Data Set 9Other

From: Lesley Groff

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00495642
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lesley Groff To: John Bedminster <1 Cc: Ma , Daphne Ann Rodriquez , Rich Kahn Subject: Re: Shade Structure/Engineering Doors Bid (LSJ/GSJ) Date: Thu, 23 May 2019 01:56:50 +0000 Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... Lesley On May 22, 2019, at 8:41 PM, <1 HI Ms. Groff, > < > wrote: Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. Best Wishes John Original Message Subject: Shade /En ineerin Doors Bid LSJ/GSJ) From: Lesley Groff < Date: Tue Ma 21 2019 2:46 pm To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? Please let me know! Thank you, Lesley LSJ/GSJ Sent from my 'Phone EFTA00495642

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.