Case File
efta-efta00521492DOJ Data Set 9OtherPROJECT: , 301 East 66th Sheet, NYC
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00521492
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
PROJECT: , 301 East 66th Sheet, NYC
Proposal SK 001 Materials only for
private residence
Propopsar by: Ruben C. lbs. ruty 12.2012
Materials only
area
wood
selection
pattern
dimensions
finish
netscift
Living Room
Enineered
European
plank 518' random widths
370
2
Dining Room
Select
Continental
thick. square C to 9' or fixed
70
3
Kitchen
White Oak,
White Oak.
edge
widths C.
Limed Satin Pay
45
Closets, Hall and Walk In Closet
C to r
Select Grade.
Random
80
5
1 /Er Metal trim transition
wide, S to split wood wear
lengths from S
Slim metal transition him
2
between various flooring
a long
layer 5mm on
feet to 8 feet
(enodded aluminum cc stainless
materials (carpet. stone, tile.
wood. etc)
water and steam
resistant bkch ply
long.
steel or brass), 1/8 thick for
fleecing 5/8. 8 foot length bars to
be cut to size
6
Trade Only Discount 20%
567
Additional Architect/Designer
567
Own Use Discount
Sheen
This proposal reflects a total 55% discount off Prke list -valid only for figs protect/Designer Own
Use
Notes: Lead-time: 8-10 weeks from order approval and deposit receipt. Terms: 60% deposit
when placing the order. 40% due 1 week before deivery. Products come foctory pre-finished.
Acclimation of all wood is requied (2 weeks' before instalation. Prices above are for European
Continental Oak - For American White Oak, same sties and finishes add $3500. Prices include
sidewalk delivery to building - inside dekvery not included - Estimated inside delivery $1.100.
Prices ore for materiels only. Installation plus glue estimated $7.25/sqf x 6C0sqf = $4,350.
Confidential
ebonyandco
NEW YORK
overage
total Riff unit price
10%
407.00 $
28.50
10%
77.00 $
28.50
10%
49.50 $
28.50
10%
88.00 $
28.50
0%
2.00 $ 200.00
20%
623.50 $
(5.60)
623.50 $
19.98)
35%
subtotal
$
11.599.50
$
2.194.50
$
1.410.75
$
2.5C8.00
$
400.00
$
(3.491.601
$
(6.222.531
SUBTOTAL INSTALLATION FINISH TOP LAYER
S
8.396.62
SALES TAX. CAPITAL IMPROVEMENTCERT NEEDED
GRAND TOTAL MATERIALS
$0.03
$
8,398.62
Pau* 1
EFTA00521492
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Flight #
SK001Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.