Skip to main content
Skip to content
Case File
efta-efta00521493DOJ Data Set 9Other

PROJECT:. 301 East 66th Street, NYC

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00521493
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
PROJECT:. 301 East 66th Street, NYC Revised by: Retied C. hos. July 16. 2012 Materials only Ore° 2 3 5 6 Sheen Living Room Dining Room Kitchen - REMOVED Closets, Hall and Walk In Closet I/Er Metal trim transition between various flooring materials (carpet. stone, tile. wood. etc) Trade Only Discount 20% Additional Architect/Designer Own Use Discount White Oak, White Oak. 6' to 9" Select Grade. wide, S to split wood wear a long layer 5mm on water and steam resistant bkch ply wood selection pattern dknensions Enineered European plank 5/8• random widths Select Continental thick. square C to 9" or fixed edge widths C. Random lengths from S feet to 8 feet long. Proposal SK C02 - materials only for private residence finish Limed Satin Pay Slim metal transition him (emodded aluminum a stainless steel or brass), 1/8• thick for flooring 5/8'. 8 foot length bars to be cut to size This proposal reflects a total 55% discount off Prke list -valid only for thIs protect/Designer Own Use Notes: Lead-time: 8-10 weeks from order approval and deposit receipt. Terms: 60% deposit when placing the order. 40% due 1 week before deivery. Products come foctory pre-finished. Acclimation of all wood is requied (2 weeks( before instalation. Prices above are for European Continental Oak - For American White Oak, same sties aid finishes add $3500. Prices include sidewalk delivery to building - inside dekvery not included - Estimated inside delivery $1.100. Prices ore for materiels only. Installation plus glue estimated $7.25/sqf x 6120sqf = $4,350. Confidential ebonyandco NEW YORK net.sqft overage total sql1 unit price subtotal 370 10% 407.00 $ 28.50 $ 11.599.50 70 10% 77.00 $ 28.50 $ 2.194.50 0 10% - $ 28.50 $ - 80 10% 88.00 $ 28.50 $ 2.5013.00 2 0% 2.00 $ 200.00 $ 400.00 567 20% 623.50 $ 15.60) $ 13.340.001 567 623.50 $ 19.98) $ 15.846.001 35% SUBTOTAL INSTALLATION FINISH TOP LAYER S 7,516.00 SALES TAX. CAPITAL IMPROVEMENTCERT NEEDED GRAND TOTAL MATERIALS $0.03 $ 7,516.00 Pape 1 EFTA00521493

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.