Skip to main content
Skip to content
Case File
efta-efta00577702DOJ Data Set 9Other

DS9 Document EFTA00577702

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00577702
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
MEMO 6/15/01 TO: Ms. Maxwell FROM: Regarding: Frank Steele status report 6/13/01 and meeting minutes 6/14/01 I briefly spoke to Frank this morning however he is on vacation and did not have access to his files. He will return Monday and I will receive further details. 1) LSJ BOAT DOCK Frank stated he was authorized to continue with the planning and administration only. He was instructed to research permitting for an additional 20' in length and adding an "L" 25 to 30' long. I requested an itemized list of the items he has purchased on our behalf to begin construction on the dock. He will complete this list next week. 2) 2) PB WINDOW REPAIR/REPLACEMENT Frank stated he recommended that we repair the rotted window frames as opposed to replacing them. 3) GARBAGE ENCLOSURE I asked Frank to confirm that the trash haulers would collect the trash from the new enclosure prior to commencing with construction. He will research and advise. 4) DRAINAGE The City of PB required provisions for surface drainage of the staff house area. We are required to install a drain line from the structure to the road which will require the disruption of sections of the driveway. EFTA00577702

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.