Skip to main content
Skip to content
Case File
efta-efta00582719DOJ Data Set 9Other

January 14, 2011

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00582719
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
January 14, 2011 Office Pavilion Outdoor wall niches facing ocean — 7 feet in width — SK — two large mirrors Table top in walkway/hall- JEE — needs bottom and glass for mirror — GK — 2/7/11? Sarah's Office Paint - before furniture arrives — Feb 5, 2011 desk lights — SK? Wired for computer — Scott GK — change all faceplates to white Master Suite Baseboard at entrance to MB painted white — completed 1/14/11 Sconces — 51.5 inches from floor - fill in holes on the side Mirror in Water Closet — space is 63 inches in width, 43 inches between sconce roughing, sconce roughing 28 inches above countertop Mirror in WC — marble surround — GK — running out of marble — JE — perhaps mirror — SK will investigate? Toilet "gun" Closets built — SK has the details Shower doors — still brainstorming Vanities in bath Outside Tub Mirrored back wall Area to be filled in with soil for planting Kitchen Fan — bottom level with bottom of pendants? kitchen tv — Nick Lambros TV brackets — Nick — must be centered over box — GK — fabrication in process? stereo — Nick Apple TV — Scott - requires TV have 1) HDMI input 2) Resolution 1080 p Existing Little Office - flooring GK — material will arrive week of 1/20/11 — 2/5/11 deadline dependent on labor to get it down Border to be measured — new border must be same width as existing wooden border Porch/Walkway outside Living Room JE - scaffolding/platform/sheeting apparatus kept area cool — brainstorm — canvas sail mounted on outside? — Brice — maintenance issues GK — transom — Ritz Carlton? — platform probably what blocked midday rays Brice — original screens — JE — may be hampered by sconces EFTA00582719 GK — once Phase One cleanup underway would like to sand and seal a sample area of walkway for JEE review and approval to proceed Living Room electric Switch out switches to front/more convenient locations Igala - Landscaping Intersection at crossroad (near Laundry) to Kitchen? MBR? — bougainvillea and fish tail palms Jules —(boulders entry) moving boulders to entryway — "graded" to height of existing stone wall Blue marked palms from beach to fill in Canary palms from top of hill at entry — any left over to go to owner's drive Fishtail palms All must be aesthetically centered with dock beach palms - office Nursery Empty? Floating Dock GK will indicate when launched so pictures can be sent to JE for approval Moorings DW — will remind GK on 1/19/11 to call attorney for an answer — if one not received by then Jet Ski Pad (cement dock, jet ski) Area marked out and approved by JE Tom to gather and screen stones from area — will be like roadways — blended into existing area? Mechanical Desal shed roof — photos next week? Nana paint, dock lights, dock poles— Brice/Carlos/Gary M. Lights must work ATV pad off of dock Radial concrete slab off of dock for cleaner area to stop ATVs Ion - scheduled: 1. cottage 2. MBR 3. Sarah's office — should occur before furniture arrives 4. library ceiling — in 10 days (1/28/11) — GK to indicate when progressing for pictures to JEE Wall/planter off steps leading down from MBR JEE on site — advised GK and Loren regarding height, run of wall and planter — as well as planting palm to mirror existing palm EFTA00582720 PHASE TWO - After February 5, 2011 to April 7, 2011 Mechanical Building/Mechanical Desal — operational 4/7/11 (see exceptions list on email to JEE 1/13/11) Handrails — in progress - pictures for JEE to ensure pattern is as approved Roadwork/Walls around JE area pebble beach house pops garden — middle wall — GK — after 2/7/11 hell expansion triangle planter info electric entry lights Tiki floor nursery floor thatch roof - roof upgrade - thatch in storage — 40 to 50 feet — GK — not enough, new sample pending Increase ring cut out around center tree trunk to hopefully relieve the floor issue dock pavilion library woodwork — Curtis Brown (Oklahoma painter) — arrival subject to JE visit Jules kite house intersection Jules grotto/steps JEE advisement needed pool excavation? EFTA00582721

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.