JE Punch List — November 4, 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - Lull — replacement parts — delivery to Tropical 11/1— sail 11/7, EDA on STT 11/10 3. Five Palms - Picture frame — on site, 86 x 70 — Sarah to forward selected picture, will frame locally - Mirrored siding — will continue to reglue as sections fall off - 17 new sections/glue — EDA on LS1 11/5 4. Grotto - Mattress cover — completion delayed due to owner travelling to northeast — completion expected 11/14 5. Berm/Top of Hill — Brice investigating a wood/paper combination material for hydro-seeding. The company that made LSJ hydro-seeder is no longer in business - Pergola construction for high road benches — David (carpenter) — require design details from JE 6. Triangle - Must design triangle — awaiting JE direction - Palms will be relocated once Lull is repaired - Installation of lights — Danny will review 11/5 7. Flagpole Pool Cabana - Furniture — desk left Paris, awaiting ETA to STT - Pace clock — ordered 2 new units -1 for backup — due on site 11/8 8. Floating Dock - Sea-Do Jet Ski — will need to review how this unit will be secured at dock - Dock box top & seat —refinished — David (carpenter) will reinstall 11/5 - Dock boxes — the mechanisms for closing the boxes need to be replaced — box lids keep breaking down/rotten wood when struts installed —JE to speak to David directly - Dock & Floating Jet Ski Dock Carpet — on STT 11/5 — David (carpenter) will install 9. Chillax Room — Requires furniture piece for electrical/media equipment - Sarah forwarded a selection 9/28, 10/1 & 10/30 —awaiting direction 10. Chillax Bathroom - Walls in vanity area to be painted —JE to select color 11. Boats - Lady G — sell — will remain at Nanny Cay until sold - Big N — repair at AYH dock in progress —hydraulic hoses shipped to STT 11/2, boxes to be installed 11/5, painting 90% complete, electrical refurbishment 90% complete. Cylinders to be taken to AYH 11/5 and installed there 12. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 13. Transient Surge Protection, Blue Storage Bins & Safety Glasses — Tropical shipped to Nassau in error, customer who received goods is refusing to return items. Will submit a claim to Tropical STT — EDA to be determined Per JE direction have reordered items from Grainger — 11/4 14. Landscaping — Peter's List - Flowers — Brice has purchased wide variety of cutting flower seeds which will review with JE - Master Planter — JE to speak with Peter when he is back on duty - High road waterfall — rocks to be installed - Line all roads with rocks, which are being sourced from the far salt pond beach area - Pop's Garden — require deer protection — LV will bring Electric Fencing down on plane - Shade cloth — reviewing propagation of seeds which were planted 10/16. Suggest raised planter beds, using tables from nursery - Peter to clean the sides of the road — work in progress EFTA00583106 - Black Heli Under Pads — install at top of bike path at MC — EDA on LS1 11/5 - Review growth of sea grape - engineering area — transplanting has not worked — review purchasing small plants 11/6 15. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,500, Concrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas - Contact Tom Melnick about concrete road construction 11/5 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 17. New Employee Bathrooms 18. aym - New punching bag — installation of the speed bag - David (carpenter) — requires JE direction - Ballet Room Windows — require direction from JE - Ceiling Fan — Danny to review 11/5 19. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood — David (carpenter) — began 10/28 20. 1.51 Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP 21. Hangar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpenter) 23. Equipment Purchase and Delivery - (3) Terex RL-4000 6kW Light Tower systems — EDA on STT 11/3 - (1) Skid steer forks — EDA on STT 11/6 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — EDA on STT 11/3 - (1) 2003 Genie Z60/34 Boom lift— EDA Tropical by 11/9 - (2) 2013 54-Express electric golf cars — EDA on LSJ 11/S - (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — awaiting buckets from UK before delivery to Tropical 24. LS1 Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — EDA STT 11/23 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & T1 working as time permits 27. Part Time Employees —focus on finding housekeepers — have a potential candidate, working the next week. 28. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ordered — Larry will bring down on next flight 29. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 11/5 30. Solar - JE does not like the white light", prefers soft white light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via email 10/22 31. Mr. Wind Statue - installation of light - Danny will review 11/5 32. Gorilla — needs to be relocated - require JE direction 33. Kite House — Repainting of outside eves of deck - Repair of Deck — David (carpenter) 34. Movie Screen — Danny to investigate a new motor 11/5 35. Master Bathroom - Top and Bottom of Steam Room Shower Door - need to review EFTA00583107

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefinished
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.