Skip to main content
Skip to content
Case File
efta-efta00583413DOJ Data Set 9Other

GSJ PERMIT REQUEST INFORMATION

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00583413
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
GSJ PERMIT REQUEST INFORMATION Based upon our request for permission letter we are including the following items in the minor permit request. For the water trailer we need the following: 1. Confirmation of where the water trailer will mainly be stored. The water trailer will be housed in an existing shed on GSJ close to the main house. 2. What type of vehicle will be used to tow the water trailer and specifics about the vehicle including weight, size, type of fuel (diesel or regular) 2016 Kawasaki Mules will be used. They are diesel propelled and weigh 1821. Please see Exhibit 1 for the full specs. For clean-up of Roads to Caretaker's Cottage & Quonset Hut 1. Description of mechanical or other equipment that will be needed to complete this project Including all specs on equipment Track hoe — Caterpillar 360. This piece of equipment will be rented. See Exhibit 2 for full specs. 2. Information as to whether or not clean up includes any grading, removal or fill. If so, we will have to show design details, profiles and location of erosion and sediment control devices such as silt fences, etc. The clean-up of this area will include minor grading but no removal or fill. There will only be trash removal. 3. We will have to provide final grading plan and landscaping plan to the extent you are going to plant on roadsides. There will be no planting in this area. 4. Cut & fill and profiles of roads to extent necessary. Not applicable. For dean-up of Christmas Cove and Shallow Bay: 1. Description of mechanical or other equipment that will be needed to complete this project Including all specs on equipment. The clean-up of this area will necessitate the cutting of a new road to Christmas Cove and Shallow Bay. Cleaning will be done by a track hoe and by hand. See Exhibit 2 for the track hoe specs. A flatbed (see Exhibit 3) and a trash bin (See Exhibit 4) will also be used. 2. Information as to whether or not clean up includes any grading, removal or fill. If so, we will have to show design details, profiles and location of erosion and sediment control devices such as silt fences, etc. No. EFTA00583413 3. We will have to provide final grading plan and landscaping plan to the extent you are going to plant on beach. No. 4. If you need to bring equipment in by barge to the beach - we need to provide location of proposed landing site as well as specs on barge, including length, draft and tonnage. A barge will not be used for this area. For planting: 1. Confirmation of palm and mango trees being planted. None 2. Confirmation that no protected grass is present at site. (Amy) 3. Landscaping plan. None For erection of flagpole: we should have enough information to get that through. They will mainly be approving location. For construction of Storage buildings: 1. Building size, dimension and # of stories. See Exhibit 5. There will be one Quonset Hut erected behind the tennis court and another one erected next to the existing Hut. 2. Site profiles ????????? 3. Location of underground utilities to extent necessary. The utilities are existing already. The tennis court and the existing Quanset Hut both have electrical service. 4. Erosion and sediment control plan. ????????? 5. Floor plan See Exhibit 5 6. Foundation/Footing drawing ???????? 7. Total Project Elevation Views See Exhibit 5 8. Section Views — I'm not sure what this is. EFTA00583414

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.