Punch List — per JE directives as of March 5. 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00583475
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List — per JE directives as of March 5. 2012 1. Rug — due to ship Wednesday March 7 2. Flagpole bath and cabana — slipcovers for sofa and cushion week of the 27th 3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th 4. Grotto - JE to redo layout of steps, determine shelter height 5. Heli garage —final punch out (painting) 6. Hangar —floor sanding in progress — 401(50' area for slab, 3 foot wall around it — containment for ISO fuel tank — bathroom and room divider — subcontractor 7. Steel shed have estimate for building, budget to be forwarded 31 Jan 8. Triangle, commenced work 9. Entry tree lights, confirmed ground lighting 10. Library Dehumidifaction — commences week of March 12 11. Solutions for generators —drawings complete for bid package 12. Too of hill — CLEAN UP — remove rocks and hydroseed 13. Five Palms - Floor - Doors location and fabrication -Lighting schedule 14. Tree order — develop list 15. Tiki - Shields due end of the month - Dock box pending available time 16. Sunken garden berm - continues 17. Concrete roads at flagoole - continues 18. Concrete triangle 19. Bench placements — bench on peninsula point 20. Engineering clean up - continues 21. New vehicles — two more Polaris bikes (800's) — Larry/Brice 22. Dock decking — discuss pressure treated timber and carpeting 23. Aquarium photo — ordered for small shutters 24. Mgrs Cottage Roof work remains — completion 2 weeks 25. Mooring Permit — proceeding with bids to place anchors 26. Electrical quotes - forward to JE 27. Rationalize Telephone system — Karen to make up extension list for each phone 28. Gates to hide engineering both at top and bottom of hill. Bill reviewing light weight gates —JE advises three 8 foot gates - bi-fold design running in track on the ground 29. Engineering service road reshaped - Continues 30. Dock lighting -Barn lights for structures, ordered due on sight 2nd week of March 31. Roads —from intersection to Flagpole 32. Guest house — moved to Beach 3, layout to be confirmed — scrape ground — lay rebar 33. Chillax room — furniture piece required for electrical/media equipment 34. Replacement transformer Mechanical building — have bid — reviewing shipping — Brice to finalize cost comparisons — refurbishment VS. new 35. Photos for Chillax bath — install small ones that are on site 36. Floating Dock — fabrication of metal beam to commence 3/6 37. Remove Rusty metal dock Columns — recovered 38. Midnight Express — new trailer to be purchased EFTA00583475

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbishment