efta-efta00583475DOJ Data Set 9OtherPunch List — per JE directives as of March 5. 2012
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00583475
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List — per JE directives as of March 5. 2012
1. Rug — due to ship Wednesday March 7
2. Flagpole bath and cabana — slipcovers for sofa and cushion week of the 27th
3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th
4. Grotto - JE to redo layout of steps, determine shelter height
5. Heli garage —final punch out (painting)
6. Hangar —floor sanding in progress — 401(50' area for slab, 3 foot wall around it — containment for ISO
fuel tank — bathroom and room divider — subcontractor
7. Steel shed have estimate for building, budget to be forwarded 31 Jan
8. Triangle, commenced work
9. Entry tree lights, confirmed ground lighting
10. Library Dehumidifaction — commences week of March 12
11. Solutions for generators —drawings complete for bid package
12. Too of hill — CLEAN UP — remove rocks and hydroseed
13. Five Palms
- Floor
- Doors location and fabrication
-Lighting schedule
14. Tree order — develop list
15. Tiki
- Shields due end of the month
- Dock box pending available time
16. Sunken garden berm - continues
17. Concrete roads at flagoole - continues
18. Concrete triangle
19. Bench placements — bench on peninsula point
20. Engineering clean up - continues
21. New vehicles — two more Polaris bikes (800's) — Larry/Brice
22. Dock decking — discuss pressure treated timber and carpeting
23. Aquarium photo — ordered for small shutters
24. Mgrs Cottage Roof work remains — completion 2 weeks
25. Mooring Permit — proceeding with bids to place anchors
26. Electrical quotes - forward to JE
27. Rationalize Telephone system — Karen to make up extension list for each phone
28. Gates to hide engineering both at top and bottom of hill. Bill reviewing light weight gates —JE advises three
8 foot gates - bi-fold design running in track on the ground
29. Engineering service road reshaped - Continues
30. Dock lighting -Barn lights for structures, ordered due on sight 2nd week of March
31. Roads —from intersection to Flagpole
32. Guest house — moved to Beach 3, layout to be confirmed — scrape ground — lay rebar
33. Chillax room — furniture piece required for electrical/media equipment
34. Replacement transformer Mechanical building — have bid — reviewing shipping — Brice to finalize cost
comparisons — refurbishment VS. new
35. Photos for Chillax bath — install small ones that are on site
36. Floating Dock — fabrication of metal beam to commence 3/6
37. Remove Rusty metal dock Columns — recovered
38. Midnight Express — new trailer to be purchased
EFTA00583475
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.