Punch List —April 28. 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00583506
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List —April 28. 2012 1. Flagpole Pool Cabana - - Fabric - on site, orange piping & pillow for sofa/chairs - via JE's direction to be completed in May - Furniture - review another piece of furniture - Sarah - Palm lighting —JE finalized design 4/24 2. Main compound - - Landscaping — plant goat's foot vine on hillside - repairing of coral stone deck areas - Coral stone thresholds in guest rooms need to be cut 3. Five Palms- - Interior Wall requires finishing — will be completed once doors are installed - awaiting door installation date - Electrical — generator from Kite to be relocated with remote starter - Floor - material on site 4/25 - Exterior Door Shutters - require design and finish -Interior Doors — due on site 5/21 - Painting —final outside coat to be completed once all work is finished - Outside coral stone seat — JE has given direction to Tom - Fire Pit —requires construction with Mexican tile on floor - Ramp and Road Transition — complete - Molyneux Canvas —to be placed on stretcher/backed and installed to ceiling, boarded with cornice molding (approx 6 to 8 inches wide) & painted white — subcontractor required for installation - Furniture — sofa for Five Palms, rug X 2 cannonball lamps, bronze lamp - Mirrors due on site 4/30 - Photos - for Five Palms - Built in Cabinets/shelves — to be completed by Bill — Hinges due NYC 4/27 - Landscaping— level dirt - continuing — Relocate grasses —JE has selected location - Concrete benches — need to be repositioned - Lights— outside light boxes on back and front walls to be covered over - Light parrots and building — from roof line (rectangular 24 X10) - Lighting to be installed in ceiling — complete - Desk —to be sent from NYC — due to be picked up 4/26 to be shipped to Tropical - Mirrored siding — due on site 5/3 4. Grotto - - Concrete pour — completion expected 4/27 - Road to Pavilion — road to mimic Starfish Market - 4/27 - Road - to be extended via JE direction - Lighting pavilion — JE to advise on lighting in pavilion and landscape lighting - Pavilion — painting to begin 4/30 - Landscaping — more dirt required on left hand side as you look down, then hydroseed - Shutters/generator doors/storage doors — to be completed by John S. Hangar — - Concrete Floor - grinding ongoing - Painting — interior paint selected —waiting on JE direction on Blue color painting floor — completion 5/3 — delayed due to power issues - Silver Polaris - from al relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 7. Triangle — needs to be reconfigured, with more dirt on top and less around base Tree from lower road and engineering to be relocated - complete EFTA00583506 8. Entry Tree Lights— lights on site 9. Solutions for Generators— Sound proofing solution forwarded to JE 10. To of hill — CLEAN UP — remove rocks - ongoing, and hydroseed 11. Tiki - Shields — ETA mid May 12. Sunken Garden Berm — crusher runs - place inside berm area - 50 planter boxes require construction — size to be determined by JE - relocate tie downs to engineering — complete - berm boxes' plantings 13. Engineering—Clean Up —area needs to be leveled and metal shed to be laid out - Landscaping — planting Sea grape 14. New vehicles — two more Polaris bikes (800's) — Larry/Brice 15. Dock — - Entry — redo entry — Brice to source dock wood locally - Decking - discuss pressure treated timber/carpeting - Extension - design required - Floating Dock— design required - Jet ski Docking - review - Table— final size/design to be determined — coral stone top — Bill - Old floating dock — move to high road 16. Mooring Permit — estimate to place anchors forwarded to JE 4/10 - awaiting direction 17. Telephone system — remove/add speed dial — awaiting programming disc — due 4/27 18. Gates - to hide engineering both at top and bottom of hill - Columns —JE changed design — work continues - Construction — Gates ready to be hung 19. Guest House at Beach 3 — sited, needs to be roughed out — start 4/21 20. Kite House — review of wooden outside furniture - Sarah 21. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 22. Chilax Bathroom - requires blue rugs for bathroom & vanity area - Sarah 23. Mechanical Building - Replacement Transformer — approved to purchase, forward to Rich K, as of date no response 24. Boats - Midnight Express — 4/2 approved to purchase Yamaha 300 motors —bids will be forwarded 4/27 - ship existing motors to FL, LV to sell — crated, expected to ship 5/4 - PRD — sell - Lady G — sell - Big N - sell - Calypso — refurbish 25. Sundial — 26. Hydro seeding— as much as possible especially when it rains 27. Mr. Wind statue — stone veneer work — completion expected 5/2 28. Gym Road - road material & holes in stone wall need to be added for water drainage 29. Master Suite - - landscaping— bananas by bedroom - maintenance —bedroom door to outside to be adjusted and lock added 30. Entry basket - bougainvillea bought for basket and dirt put in the front of the basket 31. Floating dock - redesigned 32. Mirror arrival — expected to arrive at Tropical FL Monday 4/30, sailing 5/2 or 5/4 to STT 33. Additional road by Triangle 34. Move beach trees 35. Place bench concrete EFTA00583507

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish