Punch List — per JE directives as of March 9, 2012
1. Rug — due to ship from manufacturer 3/7
2. Flagpole bath and cabana — slipcovers for sofa and cushion week of the 27th
- photos for Flagpole bath and kitchen
- white chairs in Flagpole should get orange piping
- Sarah - get desk set
- Brice - neither Ipad, no charge and no internet in Flagpole
3. Five Palms — stucco, window, hardscape, electrical - solar estimate Mar 9th
- Floor
- Doors location and fabrication
-Lighting schedule
- Electricity to run to Five Palms — Brice - what are our options?
4. Grotto - JE to redo layout of steps, determine shelter height — roof for Grotto shed
5. Heli garage — final punch out (painting)
6. Heli road - extend
7. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it — containment for ISO
fuel tank — bathroom and room divider — subcontractor
8. Steel shed - have estimate for building, budget to be forwarded 31 Jan
9. Triangle, commenced work
10. Entry tree lights, confirmed ground lighting
11. Library Dehumidification — commences week of March 12
12. Solutions for generators —drawings complete for bid package
13. Top of hill — CLEAN UP — remove rocks and hydroseed
14. Tree order — develop list
15. Tiki
- Shields — check with Sarah for date
- Dock box pending available time
16. Sunken garden berm - continues
17. Concrete roads at flagpole - continues
18. Concrete triangle,
19. Bench placements — bench on peninsula point
20. Engineering clean up - continues
21. New vehicles — two more Polaris bikes (800's) — Larry/Brice
22. Dock decking — discuss pressure treated timber and carpeting
23. Aquarium photo — ordered for small shutters — check with Sarah for date
24. Mgrs Cottage Roof work remains — completion 2 weeks
25. Mooring Permit — proceeding with bids to place anchors
26. Electrical quotes - forward to JE
27. Rationalize Telephone system — Karen to make up extension list for each phone
28. Gates to hide engineering both at top and bottom of hill. Bill reviewing light weight gates —JE advises three
8 foot gates - bi-fold design running in track on the ground
29. Engineering service road reshaped - Continues
30. Dock lighting -Barn lights for structures, ordered due on sight 2nd week of March
31. Roads — from intersection to Flagpole
32. Guest house — moved to Beach 3, layout to be confirmed — scrape ground — lay rebar
33. Chillax room — furniture piece required for electrical/media equipment
34. Replacement transformer Mechanical building — have bid — reviewing shipping — Brice to finalize cost
comparisons — refurbishment VS. new
35. Photos for Chillax bath — install small ones that are on site
36. Floating Dock — fabrication of metal beam to commence 3/6
EFTA00583639
37. Remove Rusty metal dock Columns — recovered
38. Midnight Express — new trailer to be purchased
39. Sundial — pour on 3/7 — Tom to confirm this date
40. Big Wind Door — need to be unstuck
41. Sod
EFTA00583640
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishmentForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.