Skip to main content
Skip to content
Case File
efta-efta00584242DOJ Data Set 9Other

1. Fire hazards including our new water wagon being put on island

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00584242
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
1. Fire hazards including our new water wagon being put on island We need to list this as a request and include the specs for the wagon. 2. Trash - bottles, sharp metal, old shipwrecks and fiberglass We need to list the clean up as part of a request for permission to remove the trash, brush, etc. They will want to know about how much and how it will be removed. If machines are used, they need specs on the machines. We may not be able to do this during the months of May to August since that is turtle egg-laying season. 3. We want to put up a flagpole. Northeast side. 50 feet on top of the hill. Will need a permit for this; it's considered structure. 4. The helipad. JP stated that GSJ is considered a wildlife sanctuary by NOAA and DPNR. I looked at a website which seems to be hosted by NOAA and GSJ is listed as a privately owned cay under USVI protection. https://data.nodc.noaa.govicoris/library/NOAA/CRCP/project/10037/wildlife sanctuaries us vi_english.pdf. Apparently, the helipad area which was cleared is the location of a pre-historic Columbian burial site. Additionally, there is some special, rare grass that only grows on LSJ, Bovoni (on STT) and GSJ and they fear that by clearing the areas, that grass may have been disturbed. 5. We have not built any buildings. Erika and I told them that nothing is being built but it seems that an old cistern is being refurbished and this may be considered an action that needs a permit. We did not mention the cistern because we did not know about it. 6. Christmas Cove is filled with live-aboard boats. People come on the land to turn the island into a toilet. We spoke about this and we need to provide a detailed plan for the removal of any trash in this area. 7. What work can be done in the interim? JP said that painting, electrical and plumbing work on the existing houses may continue. EFTA00584242

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

URLhttps://data.nodc.noaa.govicoris/library/NOAA/CRCP/project/10037/wildlife
Wire Refrefurbished

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.