JE Punch List —August 10, 2012 Directive Updates
1. Clean Up - make as many barge runs as necessary
- Top of Desal plant
- Engineering
- Cleaning the shops — ongoing
2. Equipment and Vehicles
- Sell equipment
- Bikes should be ready to be sold — no sales without JE approval — bike sale list forwarded to Brice 7/24 - will
be forwarded for JE approval
- No machinery off the island unless approved
- Buy new Kawasaki bikes and mules — (4) 2012 Kawasaki 750 EPS and (2) 2012 Kawasaki Mule 4010 — ordered — EDA to
Tropical 8/15 — booked to sail on 8/17, EDA on STT 8/21
- Kawasaki parts order — credit from (1) 2012 Kawasaki 750 EPS — Brice and Larry to review
3. Old Road Down to Engineering —Jules to start removing very carefully — the one that the cement cow was removed
on — there is a major power line running through that ramp —Jules to now grade that road out as best as possible -
COMPLETE
4. Computers
- Buy new computers — 2 Macs Desktops & 1 Laptop — Captains' Office - ordered
5. Five Palms
- Internet/Phone Switch installed — broken fiber discovered 7/24 —Danny to complete repairs beginning 8/13 — Danny
will discuss with
- Exterior Door Shutters — Pro-Tekt estimate forwarded to JE 7/12 - $2,865.00 - awaiting direction
- Painting - outside to be completed via JE direction
- Statue — one of them damaged — awaiting JE direction regarding repairs
- Furniture — outside furniture on LSJ 8/3 - furniture in storage waiting to be set up on 8/13 —Daphne per JE
- Piano — schedule to re-tune week of 8/15
- Picture Frame — measurements forwarded ta
86 x 70
- Mirrored siding — liquid nails — will cover entire panel with glue when the next one falls off
- Transformer Protection Shelter — should be built — Clement/Benny to start on 8/14 — Danny will discuss with
- Floor Gold Lamps - electrical wiring needs to be replaced - COMPLETE
- Fire pit — fix — a new propane tank was installed but it is now empty - Dann
-id Brian suspect there is a leak - they
will replace the piping — Danny to start on 8/15 — Danny will discuss with
6. Grotto
- Curtains — existing color not available — awaiting swatches for JE review
- Genset wiring — COMPLETE - Danny reviewing auto start from Kite House — need to purchase an electronic remote car
starter from Electronics Unlimited — special ordered 8/10 — EDA on STT 8/17
7. Berm/Top of Hill
- Inside rock removal and clean up — COMPLETE — hydroseed inside 8/13
- Outside rock removal and clean up — begins 8/14
8. Engineering/Maintenance Yard
- Engineering Bays — paint/epoxy floor/clean up — in progress - per JE direction by 8/14
- Engineering Doors — frames in place — doors hung — painted and caulked — plaster work in progress
- Engineering Storage & Shelving — COMPLETE
- Engineering shed outer wall — COMPLETE
9. Triangle -
- Peter transplanted 3 palms from engineering per JE directive 7/26 — COMPLETE
10. Flagpole Pool Cabana -
- Furniture — investigate new desk, new furniture more like Pool Cabana HI - relocate orange sofa to Media Room
- Check water pressure in shower — Danny discovered the pressure equalizer tank was not pressurized — he pressurized
and adjusted — COMPLETE
EFTA00584276
11. Floating Dock
- Jet ski bumpers — Carlos to complete installation
- Table/Dock Box - Dock box top to be resurfaced — Danny to discuss start date with Karen
- Swim Ladder — direction from JE on placement required
- Dive Platform — require construction details
12. Entry Tree Lights
— Lights on site, electrical installation - COMPLETE
13. Solutions for Generators
— Soundproofing Installation — back wall and door — COMPLETE — JE is concerned may not be adequate for deep sound
penetration
14. Tiki
— Shields — EDA on STT 8/14
15. Kite House
— relocate outside furniture from 5 Palms now that new 5 Palms furniture on site
16. Chillax Room
— requires furniture piece for electrical/media equipment a
17. Chillax Bathroom
- require blue rugs for bathroom & vanity area =
18. Mechanical Building
- Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21
19. Boats
- Lady G — sell — in hurricane storage 7/18
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair —JE approved "to keep" repair budget of $43,843 — Brice determines when project begins
- Little C - new engine has a blown head — Offshore to run through warranty — boat hauled out 8/2 and damaged
engine removed - delivered to Offshore to begin the process 8/3 — new engine ordered, two weeks for delivery — one
day potentially in dry dock at Independent Boatyard for new engine install — Carlos will contact Fred on 8/13 for
update
20. Timers
- Review installing timers on air conditioners, irrigation water systems, and lights
- Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
- Intermittent irrigation week of 8/6 — no consistent rainfall
21. Beach lighting
— per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach
22. Transient Surge Protection — will review and forward estimate ASAP — Danny to discuss wit=
23. Ice Maker — on LSJ 7/25 — per JE, install and remove old one from island
24. Landscaping
- Finish sundial corner (trees, stones, hydro-seed) — new trees to replace dead ones — once backhoe repaired
25. Solar lights — place every 30 feet — on LSJ 7/31 — on hold — JE wants to oversee the placement
26. Roads — grade - Jules work continues
27. Library
- Lights on bookshelves need attention — Danny to discuss start date with
28. New Employee Bathrooms
29. Gym
- New punching bag — arrived at 71" — will come down on the next plane trip
- Subwoofer — torn or blown — Scott to research a replacement speaker — photos and information sent 8/3
30. Benches
31. Danny Vicars — boat driving lessons ongoing
32. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
EFTA00584277
33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12
34 Hangar
- Jermaine to redo internet at hangar — began wire clean up 8/9 — complete by 8/11 - forwarded quote for rack
enclosure to Rich and Larry 8/10 — awaiting approval
- Fuel Containment Pad — draft approved with drainage incorporated, waiting for updated plan
35. Master bedroom area — add many lights in master bedroom planter — Danny 7/26 — COMPLETE
36. Hurricane Season preparations
- Palms tied down — rebar installed for palms on ocean side 8/6 — rope tie down 8/7 — COMPLETE
- Shutters secured — in progress
- Kite house security — in the event of a storm, the openings will covered with plywood
37. Office trailer — off island 8/10
38. New waste bins — (2) 20 yard bins purchased 7/26 — delivery to Tropical by 9/4
39. Logitech Universal Remote and Extenders - Jermaine programmed and installed in kitchen 8/10
EFTA00584278
Related Documents (6)
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
1p
DOJ Data Set 9OtherUnknown
From: "Jeffrey E." <[email protected]>
1p
DOJ Data Set 9OtherUnknown
From: Danny Vicars
1p
DOJ Data Set 10OtherUnknown
EFTA01952413
1p
DOJ Data Set 11OtherUnknown
EFTA02575269
1p
DOJ Data Set 11OtherUnknown
EFTA02488375
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.